Combined Notice of Filings #1, 46284-46285 [2011-19465]
Download as PDF
46284
Federal Register / Vol. 76, No. 148 / Tuesday, August 2, 2011 / Notices
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Monday August 1, 2011.
Dated: July 26, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–19466 Filed 8–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK5CLS3C1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–98–000.
Applicants: Capital Power Income
L.P., Atlantic Power Corporation.
Description: Joint Application for
Approval under Section 203 of the
Federal Power Act of Capital Power
Income L.P.
Filed Date: 07/26/2011.
Accession Number: 20110726–5031.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 16, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3553–002.
Applicants: Glacial Energy of New
Jersey, Inc.
Description: Glacial Energy of New
Jersey, Inc. submits tariff filing per
VerDate Mar<15>2010
15:03 Aug 01, 2011
Jkt 223001
35.17(b): Deficiency Filing—Glacial
New Jersey to be effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725–5129.
Comment Date: 5 p.m. Eastern Time
on Monday, August 8, 2011.
Docket Numbers: ER11–3576–002;
ER97–3583–006; ER11–3401–003; ER10–
3138–002.
Applicants: Denver City Energy
Associates, L.P., Golden Spread Electric
Cooperative, Inc., Golden Spread
Panhandle Wind Ranch, LLC, GS
Electric Generating Cooperative Inc.
Description: Notice of Change in
Status of Golden Spread Electric
Cooperative, Inc. et al.
Filed Date: 07/25/2011.
Accession Number: 20110725–5141.
Comment Date: 5 p.m. Eastern Time
on Monday, August 15, 2011.
Docket Numbers: ER11–3822–001.
Applicants: Glacial Energy of New
England, Inc.
Description: Glacial Energy of New
England, Inc. submits tariff filing per 35:
Deficiency Filing—Glacial NE to be
effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725–5127.
Comment Date: 5 p.m. Eastern Time
on Monday, August 8, 2011.
Docket Numbers: ER11–3824–001.
Applicants: Glacial Energy of Illinois,
Inc.
Description: Glacial Energy of Illinois,
Inc. submits tariff filing per 35:
Deficiency IL to be effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725–5125.
Comment Date: 5 p.m. Eastern Time
on Monday, August 8, 2011.
Docket Numbers: ER11–3879–000;
ER11–3879–001.
Applicants: Amerigreen Energy, Inc.
Description: Supplemental
Information of Amerigreen Energy, Inc.
Filed Date: 07/25/2011.
Accession Number: 20110725–5064.
Comment Date: 5 p.m. Eastern Time
on Monday, August 15, 2011.
Docket Numbers: ER11–3992–000.
Applicants: L&P Electric, Inc.
Description: Supplemental
Information and Clarifications to
Market-Based Rate Application of L&P
Electric, Inc.
Filed Date: 07/25/2011.
Accession Number: 20110725–5146.
Comment Date: 5 p.m. Eastern Time
on Monday, August 15, 2011.
Docket Numbers: ER11–4111–000.
Applicants: Hudson Ranch Power I
LLC.
Description: Hudson Ranch Power I
LLC submits tariff filing per 35.12:
Application for Market-Based Rate
Authority to be effective 12/1/2011.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Filed Date: 07/25/2011.
Accession Number: 20110725–5117.
Comment Date: 5 p.m. Eastern Time
on Monday, August 15, 2011.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA11–2–000.
Applicants: Iberdrola Renewables,
Inc. Atlantic Renewable Projects II LLC,
Barton Windpower LLC, Big Horn Wind
Project LLC, Big Horn II Wind Project
LLC, Blue Creek Wind Farm LLC,
Buffalo Ridge I LLC, Buffalo Ridge II
LLC, Casselman Windpower LLC,
Colorado Green Holdings LLC, Dillon
Wind LLC, Dry Lake Wind Power, LLC,
Dry Lake Wind Power II LLC, Elk River
Windfarm, LLC, Elm Creek Wind, LLC,
Elm Creek Wind II LLC, Farmers City
Wind, LLC, Flat Rock Windpower LLC,
Flat Rock Windpower II LLC, Flying
Cloud Power Partners, LLC,
Hardscrabble Wind Power LLC, Hay
Canyon Wind LLC, Juniper Canyon
Wind Power LLC, Klamath Energy LLC,
Klamath Generation LLC, Klondike
Wind Power LLC, Klondike Wind Power
II LLC, Klondike Wind Power III LLC,
Leaning Juniper Wind Power II LLC,
Lempster Wind, LLC, Locust Ridge
Wind Farm, LLC, Locust Ridge Wind
Farm II, LLC, MinnDakota Wind LLC,
Moraine Wind LLC, Moraine Wind II
LLC, Mountain View Power Partners III,
LLC, New Harvest Wind Project LLC,
Northern Iowa Windpower II LLC,
Pebble Springs Wind LLC, Providence
Heights Wind, LLC, Rugby Wind LLC,
San Luis Solar LLC, Shiloh I Wind
Project, LLC, Star Point Wind Project
LLC, Streator-Cayuga Ridge Wind Power
LLC, Trimont Wind I LLC, and Twin
Buttes Wind LLC.
Description: Iberdrola Renewables
MBR Sellers Q2 2011 Land Acquisition
Report.
Filed Date: 07/26/2011.
Accession Number: 20110726–5054.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 16, 2011.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
E:\FR\FM\02AUN1.SGM
02AUN1
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 76, No. 148 / Tuesday, August 2, 2011 / Notices
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Dated: July 26, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–19465 Filed 8–1–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:03 Aug 01, 2011
Jkt 223001
ferc.gov). This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–490–000]
Columbia Gas Transmission, LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Vepco—Warren County
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Vepco—Warren County Project
involving construction and operation of
facilities by Columbia Gas
Transmission, LLC (Columbia) in
Charleston, West Virginia. This EA will
be used by the Commission in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on August 25,
2011.
This notice is being sent to affected
landowners; Federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. State and local
government representatives are asked to
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
Columbia representative about survey
permission and/or the acquisition of an
easement to construct, operate, and
maintain the proposed facilities. The
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the natural gas
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC internet Web site (https://www.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
46285
Summary of the Proposed Project
Columbia proposes in response to a
request from Virginia Electric and
Power Company (VEPCO), to construct
approximately 2.47 miles of 24-inchdiameter natural gas transmission
pipeline and an associated meter and
regulation (M&R) station in Warren
County, Virginia. In addition, the
project involves the installation of
minor station piping and appurtenance
modifications at existing compressor
stations in northern Virginia and eastern
West Virginia, and abandonment and
replacement of an existing pipeline
interconnect near Rockville, Maryland.
The project would increase the capacity
to 246,000 Dth/day during the winter
and utilize 224,000 Dth/day of reserved
capacity during the summer to meet the
fuel requirements of VEPCO’s proposed
power station. The general location of
the project facilities is shown in
Appendix 1.
If approved, Columbia proposes to
commence construction of the proposed
facilities in April 2012.
Land Requirements for Construction
Construction of the pipeline would
temporarily impact about 32.4 acres.
Permanent land requirements for
operation of the proposed pipeline
would impact approximately 19.7 acres
and 12.7 acres would be reverted to preconstruction use. Approximately 0.6
acres of land would be utilized at the
end point for permanent above-ground
valve assemblies and pig receivers.
Columbia would use a 75-foot-wide
temporary right-of-way during
construction and a 50-foot-wide
permanent right-of-way for maintenance
and operation centered over the
centerline of the new pipeline.
In addition to the pipeline
replacement, Columbia is proposing
construction of a pig launcher/receiver
at existing Ninevah M&R Station in
Warren County, Virginia. A new M&R
station would be built at milepost 2.47
of the proposed pipeline within the
VEPCO—Warren County Power Station
lot. At the Rockville Measuring Station,
Columbia proposes to construct an
interconnect between its existing 26inch-diameter Line MB pipeline and
Transcontinental Pipeline Corporations’
system. Construction and operation of
the proposed modifications at the
existing Ninevah M&R Station, Loudoun
and Lost River Compressor Stations, and
Rockville Measuring Station would take
E:\FR\FM\02AUN1.SGM
02AUN1
Agencies
[Federal Register Volume 76, Number 148 (Tuesday, August 2, 2011)]
[Notices]
[Pages 46284-46285]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19465]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC11-98-000.
Applicants: Capital Power Income L.P., Atlantic Power Corporation.
Description: Joint Application for Approval under Section 203 of
the Federal Power Act of Capital Power Income L.P.
Filed Date: 07/26/2011.
Accession Number: 20110726-5031.
Comment Date: 5 p.m. Eastern Time on Tuesday, August 16, 2011.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-3553-002.
Applicants: Glacial Energy of New Jersey, Inc.
Description: Glacial Energy of New Jersey, Inc. submits tariff
filing per 35.17(b): Deficiency Filing--Glacial New Jersey to be
effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725-5129.
Comment Date: 5 p.m. Eastern Time on Monday, August 8, 2011.
Docket Numbers: ER11-3576-002; ER97-3583-006; ER11-3401-003; ER10-
3138-002.
Applicants: Denver City Energy Associates, L.P., Golden Spread
Electric Cooperative, Inc., Golden Spread Panhandle Wind Ranch, LLC, GS
Electric Generating Cooperative Inc.
Description: Notice of Change in Status of Golden Spread Electric
Cooperative, Inc. et al.
Filed Date: 07/25/2011.
Accession Number: 20110725-5141.
Comment Date: 5 p.m. Eastern Time on Monday, August 15, 2011.
Docket Numbers: ER11-3822-001.
Applicants: Glacial Energy of New England, Inc.
Description: Glacial Energy of New England, Inc. submits tariff
filing per 35: Deficiency Filing--Glacial NE to be effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725-5127.
Comment Date: 5 p.m. Eastern Time on Monday, August 8, 2011.
Docket Numbers: ER11-3824-001.
Applicants: Glacial Energy of Illinois, Inc.
Description: Glacial Energy of Illinois, Inc. submits tariff filing
per 35: Deficiency IL to be effective 7/25/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725-5125.
Comment Date: 5 p.m. Eastern Time on Monday, August 8, 2011.
Docket Numbers: ER11-3879-000; ER11-3879-001.
Applicants: Amerigreen Energy, Inc.
Description: Supplemental Information of Amerigreen Energy, Inc.
Filed Date: 07/25/2011.
Accession Number: 20110725-5064.
Comment Date: 5 p.m. Eastern Time on Monday, August 15, 2011.
Docket Numbers: ER11-3992-000.
Applicants: L&P Electric, Inc.
Description: Supplemental Information and Clarifications to Market-
Based Rate Application of L&P Electric, Inc.
Filed Date: 07/25/2011.
Accession Number: 20110725-5146.
Comment Date: 5 p.m. Eastern Time on Monday, August 15, 2011.
Docket Numbers: ER11-4111-000.
Applicants: Hudson Ranch Power I LLC.
Description: Hudson Ranch Power I LLC submits tariff filing per
35.12: Application for Market-Based Rate Authority to be effective 12/
1/2011.
Filed Date: 07/25/2011.
Accession Number: 20110725-5117.
Comment Date: 5 p.m. Eastern Time on Monday, August 15, 2011.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA11-2-000.
Applicants: Iberdrola Renewables, Inc. Atlantic Renewable Projects
II LLC, Barton Windpower LLC, Big Horn Wind Project LLC, Big Horn II
Wind Project LLC, Blue Creek Wind Farm LLC, Buffalo Ridge I LLC,
Buffalo Ridge II LLC, Casselman Windpower LLC, Colorado Green Holdings
LLC, Dillon Wind LLC, Dry Lake Wind Power, LLC, Dry Lake Wind Power II
LLC, Elk River Windfarm, LLC, Elm Creek Wind, LLC, Elm Creek Wind II
LLC, Farmers City Wind, LLC, Flat Rock Windpower LLC, Flat Rock
Windpower II LLC, Flying Cloud Power Partners, LLC, Hardscrabble Wind
Power LLC, Hay Canyon Wind LLC, Juniper Canyon Wind Power LLC, Klamath
Energy LLC, Klamath Generation LLC, Klondike Wind Power LLC, Klondike
Wind Power II LLC, Klondike Wind Power III LLC, Leaning Juniper Wind
Power II LLC, Lempster Wind, LLC, Locust Ridge Wind Farm, LLC, Locust
Ridge Wind Farm II, LLC, MinnDakota Wind LLC, Moraine Wind LLC, Moraine
Wind II LLC, Mountain View Power Partners III, LLC, New Harvest Wind
Project LLC, Northern Iowa Windpower II LLC, Pebble Springs Wind LLC,
Providence Heights Wind, LLC, Rugby Wind LLC, San Luis Solar LLC,
Shiloh I Wind Project, LLC, Star Point Wind Project LLC, Streator-
Cayuga Ridge Wind Power LLC, Trimont Wind I LLC, and Twin Buttes Wind
LLC.
Description: Iberdrola Renewables MBR Sellers Q2 2011 Land
Acquisition Report.
Filed Date: 07/26/2011.
Accession Number: 20110726-5054.
Comment Date: 5 p.m. Eastern Time on Tuesday, August 16, 2011.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that
[[Page 46285]]
document on the Applicant. In reference to filings initiating a new
proceeding, interventions or protests submitted on or before the
comment deadline need not be served on persons other than the
Applicant.
As it relates to any qualifying facility filings, the notices of
self-certification [or self-recertification] listed above, do not
institute a proceeding regarding qualifying facility status. A notice
of self-certification [or self-recertification] simply provides
notification that the entity making the filing has determined the
facility named in the notice meets the applicable criteria to be a
qualifying facility. Intervention and/or protest do not lie in dockets
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying
facility status may do so by filing a motion pursuant to 18 CFR
292.207(d)(iii). Intervention and protests may be filed in response to
notices of qualifying facility dockets other than self-certifications
and self-recertifications.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: July 26, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-19465 Filed 8-1-11; 8:45 am]