Environmental Impacts Statements; Notice of Availability, 45554-45555 [2011-19234]

Download as PDF 45554 Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES (1) Explain your views as clearly as possible and provide specific examples. (2) Describe any assumptions that you used. (3) Provide copies of any technical information and/or data you used that support your views. (4) If you estimate potential burden or costs, explain how you arrived at the estimate that you provide. (5) Offer alternative ways to improve the collection activity. (6) Make sure to submit your comments by the deadline identified under DATES. 7. To ensure proper receipt by EPA, be sure to identify the docket ID number of EPA–HQ–OW–2008–0150 in the subject line on the first page of your response. You may also provide the name, date, and Federal Register citation. What information collection activity or ICR does this apply to? Affected Entities: Entities potentially affected by this action are state, local, and Tribal governments. Title: Establishing No-Discharge Zones Under Clean Water Act Section 312 (Renewal). ICR Numbers: EPA ICR No. 1791.06, OMB Control No. 2040–0187. ICR Status: This ICR is scheduled to expire on December 31, 2011. An Agency may not conduct or sponsor, and a person is not required to respond to, a collection of information, unless it displays a valid OMB control number. The OMB control numbers for EPA’s regulations in title 40 of the CFR are displayed either by publication in the Federal Register or by other appropriate means, such as on the related collection instrument or form, if applicable. The display of OMB control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: (A) Sewage No-discharge Zones: The need for EPA to obtain information for the establishment of nodischarge zones (NDZs) for vessel sewage in state waters stems from CWA sections 312(f)(3), (f)(4)(A), and (f)(4)(B), and subsequent regulations at 40 CFR 140.4(a–c). No-discharge zones are established to provide state and local governments with additional protection of waters from treated or untreated vessel sewage. This ICR discusses the information requirements associated with the establishment of NDZs for vessel sewage. The information collection activities discussed in this ICR do not require the submission of any confidential information. (B) UNDS No-discharge Zones: Under section 312(n) of the Clean Water Act (‘‘Uniform National Discharge Standards VerDate Mar<15>2010 16:17 Jul 28, 2011 Jkt 223001 for Vessels of the Armed Forces’’ or ‘‘UNDS’’) no-discharge zones (‘‘NDZs’’) for discharges from Armed Forces vessels may be established by either state prohibition or EPA prohibition following the procedures in 40 CFR part 1700. UNDS also provides that the Governor of any state may petition EPA and the Secretary of Defense to review any determination or standard promulgated under the UNDS program if there is significant new information that could reasonably result in a change to the determination or standard. This ICR discusses the information that will be required from a state if it decides to establish a NDZ by state prohibition or apply for a NDZ by EPA prohibition, and the information that will be required from a state if it decides to submit a petition for review. The responses to this collection of information are required to obtain the benefit of an UNDS NDZ or a review of an UNDS determination or standard (see 33 U.S.C. 1322(n)). The information collection activities discussed in this ICR do not require the submission of any confidential information. Burden Statement The ICR provides a detailed explanation of the Agency’s estimate, which is only briefly summarized here: • Estimated total number of potential respondents: 16. • Frequency of response: Annual. • Estimated total average number of responses for each respondent: 1. • Estimated total annual burden hours: 2,207.5 hours. • Estimated total annual costs: $103,459. This includes an estimated burden cost of $101,159 and an estimated cost of $2,300 for capital investment or maintenance and operational costs. The estimate includes time for gathering information, and preparing and submitting requests. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 Are there changes in the estimates from the last approval? Estimates have been updated with current state and Federal labor costs. What is the next step in the process for this ICR? EPA will consider the comments received and amend the ICR as appropriate. The final ICR package will then be submitted to OMB for review and approval pursuant to 5 CFR 1320.12. At that time, EPA will issue another Federal Register notice pursuant to 5 CFR 1320.5(a)(1)(iv) to announce the submission of the ICR to OMB and the opportunity to submit additional comments to OMB. If you have any questions about this ICR or the approval process, please contact the technical person listed under FOR FURTHER INFORMATION CONTACT. Dated: July 21, 2011. Denise Keehner, Director, Office of Wetlands, Oceans and Watersheds. [FR Doc. 2011–19294 Filed 7–28–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8998–2] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 07/18/2011 Through 07/22/2011 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/ nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. E:\FR\FM\29JYN1.SGM 29JYN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 / Notices EIS No. 20110235, Draft EIS, DOE, WA, Klickitat Hatchery Complex Program, Proposed Changes to Production Programs for Four Anadromous Fish Species, Klictitat River Subbasin, Klickitat and Yakima Counties, WA, Comment Period Ends: 09/12/2011, Contact: Hannah Dondy-Kaplan 503– 230–4071. EIS No. 20110236, Draft EIS, FTA, GA, Tier 1—Atlanta Beltline City of Atlanta, Proposed Fixed Guideway Transit and Multi-Use Trails System, Right-of-Way Preservation, Fulton County, GA, Comment Period Ends: 09/12/2011, Contact: Keith Melton 404–865–5600. EIS No. 20110237, Final EIS, BLM, WY, Buckskin Mine Hay Creek II Project, Coal Lease Application WYW– 172684, Wyoming Powder River Basin, Campbell County, WY, Review Period Ends: 08/29/2011, Contact: Teresa Johnson 307–261–7510. EIS No. 20110238, Draft EIS, NPS, DC, Anacostia Park Wetland and Resident Goose Management Plan, To Guide and Direct the Actions of National Park Service (NPS) in the Management of Wetlands and Resident (non-migratory) Canada Geese at Anacostia Park, Implementation, Washington, DC, Comment Period Ends: 09/26/2011, Contact: Alex Romero 202–690–5197. EIS No. 20110239, Draft EIS, BLM, 00, Gateway West Transmission Line Project, Proposed To Analyze the Effects of Authorizing the Proponents (Rocky Mountain Power and Idaho Power) to Construct and Operate the Gateway West Transmission Line Project, Application for Right-of-Way (ROW) Grants to Utilize Portions of National System of Public Lands and Special Use Permits to Utilize Portions of National Forest System Lands in Southern Wyoming, Southern Idaho and Possibly Northern Nevada, Comment Period Ends: 10/ 26/2011, Contact: Walter E. George 307–775–6116. EIS No. 20110240, Draft EIS, NPS, AK, Denali Park Road and Preserve, Draft Vehicle Management Plan, Implementation, AK, Comment Period Ends: 09/30/2011, Contact: Miriam Valentine 907–733–9102. EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS—Continued Operation of the Department of Energy/National Nuclear Security Administration, Nevada National Security Site and Off-Site Location in Nevada, Comment Period Ends: 10/ 27/2011, Contact: Linda M. Cohn 702–295–0077. EIS No. 20110242, Final EIS, BLM, CO, Over The River (OTR) Project, VerDate Mar<15>2010 16:17 Jul 28, 2011 Jkt 223001 Propose to Install a Temporary Work of Art, Require the Use of Federal, Private and State Lands Adjacent to the River, Western Fremont County and Southeast Portion of Chaffee County, CO, Review Period Ends: 08/ 29/2011, Contact: Vincent Hopper 719–269–8555. EIS No. 20110243, Draft EIS, FHWA, 00, Tier 1—National Highway System (NHS) Corridor, Propose to Develop an Improved Transportation Connecting (US–220) between I–68 and Corridor H, Grant, Hardy, Hampshire, Mineral Counties, WV and Allegany County, MD, Comment Period Ends: 10/14/2011, Contact: Greg Bailey 304–558–9722. EIS No. 20110244, Draft EIS, FHWA, OR, US–97 Bend North Corridor Project, Propose to Improve a Segment of US–97 in Deschutes County, Oregon between the Deschutes Market Road/Tumalo Junction Interchange and the Empire Avenue Interchange, Deschutes County, OR, Comment Period Ends: 09/12/2011, Contact: Chris Bucher 503–399–5749. Amended Notices EIS No. 20110225, Final EIS, FHWA, TN, Interstate 55 Interchange at E.H. Crump Boulevard and South Boulevard Project, To Provide a Balanced Solution for Safety and Capacity Issues at the I55 Interchange, City of Memphis, Shelby County, TN, Review Period Ends: 08/22/2011, Contact: Charles J. O’Neill 615–781– 5772. Review to FR Notice 07/22/2011: Correction to Review Period End from 08/15/2011 to 08/22/2011. EIS No. 20110228, Final EIS, FHWA, IN, I–69 Evansville to Indianapolis Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN–37 South of Bloomington in Section 4, Greene and Monroe Counties, IN, Review Period Ends: 08/22/2011, Contact: Michelle Allen 317–226–7344. Review to FR Notice 07/22/2011: Correction to Review Period End from 08/15/2011 to 08/22/2011. EIS No. 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and Transmission Projects, Implementation, Churchill County, NV, Review Period Ends: 08/22/2011, Contact: Colleen Sievers 775–885– 6168. Review to FR Notice 07/22/2011: Correction to Review Period End from 08/15/2011 to 08/22/2011. EIS No. 20110234, Final EIS, FHWA, WI, US 41 Improvement Project, Extend from Depere—Suamico (Memorial Drive to County M), Brown County, PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 45555 WI, Review Period Ends: 08/22/2011, Contact: George Poirier 608–829– 7500. Review to FR Notice 07/22/2011: Correction to Review Period End from 08/15/2011 to 08/22/2011. Dated: July 26, 2011. Cliff Rader, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2011–19234 Filed 7–28–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2011–0550; FRL–8882–2] Nominations to the FIFRA Scientific Advisory Panel; Request for Comments Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice provides the names, addresses, professional affiliations, and selected biographical data of persons nominated to serve on the Scientific Advisory Panel (SAP) established under section 25(d) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA). The Panel was created on November 28, 1975, and made a statutory Panel by amendment to FIFRA, dated October 25, 1988. The Agency, at this time, anticipates selecting two new members to serve on the panel as a result of membership terms that will expire next year. Public comments on the nominations are invited, as these comments will be used to assist the Agency in selecting the new chartered Panel members. DATES: Comments, identified by docket ID number EPA–HQ–OPP–2011–0550, must be received on or before August 29, 2011. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2011–0550, by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket Facility’s normal hours of operation SUMMARY: E:\FR\FM\29JYN1.SGM 29JYN1

Agencies

[Federal Register Volume 76, Number 146 (Friday, July 29, 2011)]
[Notices]
[Pages 45554-45555]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19234]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8998-2]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 07/18/2011 Through 07/22/2011
Pursuant to 40 CFR 1506.9.

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA met this mandate by publishing weekly notices 
of availability of EPA comments, which includes a brief summary of 
EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS 
comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

[[Page 45555]]

EIS No. 20110235, Draft EIS, DOE, WA, Klickitat Hatchery Complex 
Program, Proposed Changes to Production Programs for Four Anadromous 
Fish Species, Klictitat River Subbasin, Klickitat and Yakima Counties, 
WA, Comment Period Ends: 09/12/2011, Contact: Hannah Dondy-Kaplan 503-
230-4071.
EIS No. 20110236, Draft EIS, FTA, GA, Tier 1--Atlanta Beltline City of 
Atlanta, Proposed Fixed Guideway Transit and Multi-Use Trails System, 
Right-of-Way Preservation, Fulton County, GA, Comment Period Ends: 09/
12/2011, Contact: Keith Melton 404-865-5600.
EIS No. 20110237, Final EIS, BLM, WY, Buckskin Mine Hay Creek II 
Project, Coal Lease Application WYW-172684, Wyoming Powder River Basin, 
Campbell County, WY, Review Period Ends: 08/29/2011, Contact: Teresa 
Johnson 307-261-7510.
EIS No. 20110238, Draft EIS, NPS, DC, Anacostia Park Wetland and 
Resident Goose Management Plan, To Guide and Direct the Actions of 
National Park Service (NPS) in the Management of Wetlands and Resident 
(non-migratory) Canada Geese at Anacostia Park, Implementation, 
Washington, DC, Comment Period Ends: 09/26/2011, Contact: Alex Romero 
202-690-5197.
EIS No. 20110239, Draft EIS, BLM, 00, Gateway West Transmission Line 
Project, Proposed To Analyze the Effects of Authorizing the Proponents 
(Rocky Mountain Power and Idaho Power) to Construct and Operate the 
Gateway West Transmission Line Project, Application for Right-of-Way 
(ROW) Grants to Utilize Portions of National System of Public Lands and 
Special Use Permits to Utilize Portions of National Forest System Lands 
in Southern Wyoming, Southern Idaho and Possibly Northern Nevada, 
Comment Period Ends: 10/26/2011, Contact: Walter E. George 307-775-
6116.
EIS No. 20110240, Draft EIS, NPS, AK, Denali Park Road and Preserve, 
Draft Vehicle Management Plan, Implementation, AK, Comment Period Ends: 
09/30/2011, Contact: Miriam Valentine 907-733-9102.
EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued 
Operation of the Department of Energy/National Nuclear Security 
Administration, Nevada National Security Site and Off-Site Location in 
Nevada, Comment Period Ends: 10/27/2011, Contact: Linda M. Cohn 702-
295-0077.
EIS No. 20110242, Final EIS, BLM, CO, Over The River (OTR) Project, 
Propose to Install a Temporary Work of Art, Require the Use of Federal, 
Private and State Lands Adjacent to the River, Western Fremont County 
and Southeast Portion of Chaffee County, CO, Review Period Ends: 08/29/
2011, Contact: Vincent Hopper 719-269-8555.
EIS No. 20110243, Draft EIS, FHWA, 00, Tier 1--National Highway System 
(NHS) Corridor, Propose to Develop an Improved Transportation 
Connecting (US-220) between I-68 and Corridor H, Grant, Hardy, 
Hampshire, Mineral Counties, WV and Allegany County, MD, Comment Period 
Ends: 10/14/2011, Contact: Greg Bailey 304-558-9722.
EIS No. 20110244, Draft EIS, FHWA, OR, US-97 Bend North Corridor 
Project, Propose to Improve a Segment of US-97 in Deschutes County, 
Oregon between the Deschutes Market Road/Tumalo Junction Interchange 
and the Empire Avenue Interchange, Deschutes County, OR, Comment Period 
Ends: 09/12/2011, Contact: Chris Bucher 503-399-5749.

Amended Notices

EIS No. 20110225, Final EIS, FHWA, TN, Interstate 55 Interchange at 
E.H. Crump Boulevard and South Boulevard Project, To Provide a Balanced 
Solution for Safety and Capacity Issues at the I55 Interchange, City of 
Memphis, Shelby County, TN, Review Period Ends: 08/22/2011, Contact: 
Charles J. O'Neill 615-781-5772.
    Review to FR Notice 07/22/2011: Correction to Review Period End 
from 08/15/2011 to 08/22/2011.
EIS No. 20110228, Final EIS, FHWA, IN, I-69 Evansville to Indianapolis 
Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN-37 South of 
Bloomington in Section 4, Greene and Monroe Counties, IN, Review Period 
Ends: 08/22/2011, Contact: Michelle Allen 317-226-7344.
    Review to FR Notice 07/22/2011: Correction to Review Period End 
from 08/15/2011 to 08/22/2011.
EIS No. 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects, 
Proposal for Three Separate Geothermal Energy and Transmission 
Projects, Implementation, Churchill County, NV, Review Period Ends: 08/
22/2011, Contact: Colleen Sievers 775-885-6168.
    Review to FR Notice 07/22/2011: Correction to Review Period End 
from 08/15/2011 to 08/22/2011.
EIS No. 20110234, Final EIS, FHWA, WI, US 41 Improvement Project, 
Extend from Depere--Suamico (Memorial Drive to County M), Brown County, 
WI, Review Period Ends: 08/22/2011, Contact: George Poirier 608-829-
7500.
    Review to FR Notice 07/22/2011: Correction to Review Period End 
from 08/15/2011 to 08/22/2011.

    Dated: July 26, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2011-19234 Filed 7-28-11; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.