Environmental Impacts Statements; Notice of Availability, 45554-45555 [2011-19234]
Download as PDF
45554
Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
(1) Explain your views as clearly as
possible and provide specific examples.
(2) Describe any assumptions that you
used.
(3) Provide copies of any technical
information and/or data you used that
support your views.
(4) If you estimate potential burden or
costs, explain how you arrived at the
estimate that you provide.
(5) Offer alternative ways to improve
the collection activity.
(6) Make sure to submit your
comments by the deadline identified
under DATES.
7. To ensure proper receipt by EPA,
be sure to identify the docket ID number
of EPA–HQ–OW–2008–0150 in the
subject line on the first page of your
response. You may also provide the
name, date, and Federal Register
citation.
What information collection activity or
ICR does this apply to?
Affected Entities: Entities potentially
affected by this action are state, local,
and Tribal governments.
Title: Establishing No-Discharge
Zones Under Clean Water Act Section
312 (Renewal).
ICR Numbers: EPA ICR No. 1791.06,
OMB Control No. 2040–0187.
ICR Status: This ICR is scheduled to
expire on December 31, 2011. An
Agency may not conduct or sponsor,
and a person is not required to respond
to, a collection of information, unless it
displays a valid OMB control number.
The OMB control numbers for EPA’s
regulations in title 40 of the CFR are
displayed either by publication in the
Federal Register or by other appropriate
means, such as on the related collection
instrument or form, if applicable. The
display of OMB control numbers in
certain EPA regulations is consolidated
in 40 CFR part 9.
Abstract: (A) Sewage No-discharge
Zones: The need for EPA to obtain
information for the establishment of nodischarge zones (NDZs) for vessel
sewage in state waters stems from CWA
sections 312(f)(3), (f)(4)(A), and (f)(4)(B),
and subsequent regulations at 40 CFR
140.4(a–c). No-discharge zones are
established to provide state and local
governments with additional protection
of waters from treated or untreated
vessel sewage. This ICR discusses the
information requirements associated
with the establishment of NDZs for
vessel sewage. The information
collection activities discussed in this
ICR do not require the submission of
any confidential information.
(B) UNDS No-discharge Zones: Under
section 312(n) of the Clean Water Act
(‘‘Uniform National Discharge Standards
VerDate Mar<15>2010
16:17 Jul 28, 2011
Jkt 223001
for Vessels of the Armed Forces’’ or
‘‘UNDS’’) no-discharge zones (‘‘NDZs’’)
for discharges from Armed Forces
vessels may be established by either
state prohibition or EPA prohibition
following the procedures in 40 CFR part
1700. UNDS also provides that the
Governor of any state may petition EPA
and the Secretary of Defense to review
any determination or standard
promulgated under the UNDS program
if there is significant new information
that could reasonably result in a change
to the determination or standard. This
ICR discusses the information that will
be required from a state if it decides to
establish a NDZ by state prohibition or
apply for a NDZ by EPA prohibition,
and the information that will be
required from a state if it decides to
submit a petition for review. The
responses to this collection of
information are required to obtain the
benefit of an UNDS NDZ or a review of
an UNDS determination or standard (see
33 U.S.C. 1322(n)). The information
collection activities discussed in this
ICR do not require the submission of
any confidential information.
Burden Statement
The ICR provides a detailed
explanation of the Agency’s estimate,
which is only briefly summarized here:
• Estimated total number of potential
respondents: 16.
• Frequency of response: Annual.
• Estimated total average number of
responses for each respondent: 1.
• Estimated total annual burden
hours: 2,207.5 hours.
• Estimated total annual costs:
$103,459.
This includes an estimated burden cost
of $101,159 and an estimated cost of
$2,300 for capital investment or
maintenance and operational costs. The
estimate includes time for gathering
information, and preparing and
submitting requests. Burden means the
total time, effort, or financial resources
expended by persons to generate,
maintain, retain, or disclose or provide
information to or for a Federal agency.
This includes the time needed to review
instructions; develop, acquire, install,
and utilize technology and systems for
the purposes of collecting, validating,
and verifying information, processing
and maintaining information, and
disclosing and providing information;
adjust the existing ways to comply with
any previously applicable instructions
and requirements; train personnel to be
able to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Are there changes in the estimates from
the last approval?
Estimates have been updated with
current state and Federal labor costs.
What is the next step in the process for
this ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice
pursuant to 5 CFR 1320.5(a)(1)(iv) to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
technical person listed under FOR
FURTHER INFORMATION CONTACT.
Dated: July 21, 2011.
Denise Keehner,
Director, Office of Wetlands, Oceans and
Watersheds.
[FR Doc. 2011–19294 Filed 7–28–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8998–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/18/2011 Through 07/22/2011
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
E:\FR\FM\29JYN1.SGM
29JYN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 / Notices
EIS No. 20110235, Draft EIS, DOE, WA,
Klickitat Hatchery Complex Program,
Proposed Changes to Production
Programs for Four Anadromous Fish
Species, Klictitat River Subbasin,
Klickitat and Yakima Counties, WA,
Comment Period Ends: 09/12/2011,
Contact: Hannah Dondy-Kaplan 503–
230–4071.
EIS No. 20110236, Draft EIS, FTA, GA,
Tier 1—Atlanta Beltline City of
Atlanta, Proposed Fixed Guideway
Transit and Multi-Use Trails System,
Right-of-Way Preservation, Fulton
County, GA, Comment Period Ends:
09/12/2011, Contact: Keith Melton
404–865–5600.
EIS No. 20110237, Final EIS, BLM, WY,
Buckskin Mine Hay Creek II Project,
Coal Lease Application WYW–
172684, Wyoming Powder River
Basin, Campbell County, WY, Review
Period Ends: 08/29/2011, Contact:
Teresa Johnson 307–261–7510.
EIS No. 20110238, Draft EIS, NPS, DC,
Anacostia Park Wetland and Resident
Goose Management Plan, To Guide
and Direct the Actions of National
Park Service (NPS) in the
Management of Wetlands and
Resident (non-migratory) Canada
Geese at Anacostia Park,
Implementation, Washington, DC,
Comment Period Ends: 09/26/2011,
Contact: Alex Romero 202–690–5197.
EIS No. 20110239, Draft EIS, BLM, 00,
Gateway West Transmission Line
Project, Proposed To Analyze the
Effects of Authorizing the Proponents
(Rocky Mountain Power and Idaho
Power) to Construct and Operate the
Gateway West Transmission Line
Project, Application for Right-of-Way
(ROW) Grants to Utilize Portions of
National System of Public Lands and
Special Use Permits to Utilize
Portions of National Forest System
Lands in Southern Wyoming,
Southern Idaho and Possibly Northern
Nevada, Comment Period Ends: 10/
26/2011, Contact: Walter E. George
307–775–6116.
EIS No. 20110240, Draft EIS, NPS, AK,
Denali Park Road and Preserve, Draft
Vehicle Management Plan,
Implementation, AK, Comment Period
Ends: 09/30/2011, Contact: Miriam
Valentine 907–733–9102.
EIS No. 20110241, Draft EIS, NNSA,
NV, Site-Wide EIS—Continued
Operation of the Department of
Energy/National Nuclear Security
Administration, Nevada National
Security Site and Off-Site Location in
Nevada, Comment Period Ends: 10/
27/2011, Contact: Linda M. Cohn
702–295–0077.
EIS No. 20110242, Final EIS, BLM, CO,
Over The River (OTR) Project,
VerDate Mar<15>2010
16:17 Jul 28, 2011
Jkt 223001
Propose to Install a Temporary Work
of Art, Require the Use of Federal,
Private and State Lands Adjacent to
the River, Western Fremont County
and Southeast Portion of Chaffee
County, CO, Review Period Ends: 08/
29/2011, Contact: Vincent Hopper
719–269–8555.
EIS No. 20110243, Draft EIS, FHWA, 00,
Tier 1—National Highway System
(NHS) Corridor, Propose to Develop
an Improved Transportation
Connecting (US–220) between I–68
and Corridor H, Grant, Hardy,
Hampshire, Mineral Counties, WV
and Allegany County, MD, Comment
Period Ends: 10/14/2011, Contact:
Greg Bailey 304–558–9722.
EIS No. 20110244, Draft EIS, FHWA,
OR, US–97 Bend North Corridor
Project, Propose to Improve a Segment
of US–97 in Deschutes County,
Oregon between the Deschutes Market
Road/Tumalo Junction Interchange
and the Empire Avenue Interchange,
Deschutes County, OR, Comment
Period Ends: 09/12/2011, Contact:
Chris Bucher 503–399–5749.
Amended Notices
EIS No. 20110225, Final EIS, FHWA,
TN, Interstate 55 Interchange at E.H.
Crump Boulevard and South
Boulevard Project, To Provide a
Balanced Solution for Safety and
Capacity Issues at the I55 Interchange,
City of Memphis, Shelby County, TN,
Review Period Ends: 08/22/2011,
Contact: Charles J. O’Neill 615–781–
5772.
Review to FR Notice 07/22/2011:
Correction to Review Period End from
08/15/2011 to 08/22/2011.
EIS No. 20110228, Final EIS, FHWA, IN,
I–69 Evansville to Indianapolis Tier 2
Section 4 Project, From U.S. 231
(Crane NSWC) to IN–37 South of
Bloomington in Section 4, Greene and
Monroe Counties, IN, Review Period
Ends: 08/22/2011, Contact: Michelle
Allen 317–226–7344.
Review to FR Notice 07/22/2011:
Correction to Review Period End from
08/15/2011 to 08/22/2011.
EIS No. 20110231, Final EIS, BLM, NV,
Salt Wells Energy Projects, Proposal
for Three Separate Geothermal Energy
and Transmission Projects,
Implementation, Churchill County,
NV, Review Period Ends: 08/22/2011,
Contact: Colleen Sievers 775–885–
6168.
Review to FR Notice 07/22/2011:
Correction to Review Period End from
08/15/2011 to 08/22/2011.
EIS No. 20110234, Final EIS, FHWA, WI,
US 41 Improvement Project, Extend
from Depere—Suamico (Memorial
Drive to County M), Brown County,
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
45555
WI, Review Period Ends: 08/22/2011,
Contact: George Poirier 608–829–
7500.
Review to FR Notice 07/22/2011:
Correction to Review Period End from
08/15/2011 to 08/22/2011.
Dated: July 26, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–19234 Filed 7–28–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2011–0550; FRL–8882–2]
Nominations to the FIFRA Scientific
Advisory Panel; Request for
Comments
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice provides the
names, addresses, professional
affiliations, and selected biographical
data of persons nominated to serve on
the Scientific Advisory Panel (SAP)
established under section 25(d) of the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA). The Panel was
created on November 28, 1975, and
made a statutory Panel by amendment
to FIFRA, dated October 25, 1988. The
Agency, at this time, anticipates
selecting two new members to serve on
the panel as a result of membership
terms that will expire next year. Public
comments on the nominations are
invited, as these comments will be used
to assist the Agency in selecting the new
chartered Panel members.
DATES: Comments, identified by docket
ID number EPA–HQ–OPP–2011–0550,
must be received on or before August
29, 2011.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2011–0550, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S–4400, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA. Deliveries
are only accepted during the Docket
Facility’s normal hours of operation
SUMMARY:
E:\FR\FM\29JYN1.SGM
29JYN1
Agencies
[Federal Register Volume 76, Number 146 (Friday, July 29, 2011)]
[Notices]
[Pages 45554-45555]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19234]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8998-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/18/2011 Through 07/22/2011
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA met this mandate by publishing weekly notices
of availability of EPA comments, which includes a brief summary of
EPA's comment letters, in the Federal Register. Since February 2008,
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
[[Page 45555]]
EIS No. 20110235, Draft EIS, DOE, WA, Klickitat Hatchery Complex
Program, Proposed Changes to Production Programs for Four Anadromous
Fish Species, Klictitat River Subbasin, Klickitat and Yakima Counties,
WA, Comment Period Ends: 09/12/2011, Contact: Hannah Dondy-Kaplan 503-
230-4071.
EIS No. 20110236, Draft EIS, FTA, GA, Tier 1--Atlanta Beltline City of
Atlanta, Proposed Fixed Guideway Transit and Multi-Use Trails System,
Right-of-Way Preservation, Fulton County, GA, Comment Period Ends: 09/
12/2011, Contact: Keith Melton 404-865-5600.
EIS No. 20110237, Final EIS, BLM, WY, Buckskin Mine Hay Creek II
Project, Coal Lease Application WYW-172684, Wyoming Powder River Basin,
Campbell County, WY, Review Period Ends: 08/29/2011, Contact: Teresa
Johnson 307-261-7510.
EIS No. 20110238, Draft EIS, NPS, DC, Anacostia Park Wetland and
Resident Goose Management Plan, To Guide and Direct the Actions of
National Park Service (NPS) in the Management of Wetlands and Resident
(non-migratory) Canada Geese at Anacostia Park, Implementation,
Washington, DC, Comment Period Ends: 09/26/2011, Contact: Alex Romero
202-690-5197.
EIS No. 20110239, Draft EIS, BLM, 00, Gateway West Transmission Line
Project, Proposed To Analyze the Effects of Authorizing the Proponents
(Rocky Mountain Power and Idaho Power) to Construct and Operate the
Gateway West Transmission Line Project, Application for Right-of-Way
(ROW) Grants to Utilize Portions of National System of Public Lands and
Special Use Permits to Utilize Portions of National Forest System Lands
in Southern Wyoming, Southern Idaho and Possibly Northern Nevada,
Comment Period Ends: 10/26/2011, Contact: Walter E. George 307-775-
6116.
EIS No. 20110240, Draft EIS, NPS, AK, Denali Park Road and Preserve,
Draft Vehicle Management Plan, Implementation, AK, Comment Period Ends:
09/30/2011, Contact: Miriam Valentine 907-733-9102.
EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued
Operation of the Department of Energy/National Nuclear Security
Administration, Nevada National Security Site and Off-Site Location in
Nevada, Comment Period Ends: 10/27/2011, Contact: Linda M. Cohn 702-
295-0077.
EIS No. 20110242, Final EIS, BLM, CO, Over The River (OTR) Project,
Propose to Install a Temporary Work of Art, Require the Use of Federal,
Private and State Lands Adjacent to the River, Western Fremont County
and Southeast Portion of Chaffee County, CO, Review Period Ends: 08/29/
2011, Contact: Vincent Hopper 719-269-8555.
EIS No. 20110243, Draft EIS, FHWA, 00, Tier 1--National Highway System
(NHS) Corridor, Propose to Develop an Improved Transportation
Connecting (US-220) between I-68 and Corridor H, Grant, Hardy,
Hampshire, Mineral Counties, WV and Allegany County, MD, Comment Period
Ends: 10/14/2011, Contact: Greg Bailey 304-558-9722.
EIS No. 20110244, Draft EIS, FHWA, OR, US-97 Bend North Corridor
Project, Propose to Improve a Segment of US-97 in Deschutes County,
Oregon between the Deschutes Market Road/Tumalo Junction Interchange
and the Empire Avenue Interchange, Deschutes County, OR, Comment Period
Ends: 09/12/2011, Contact: Chris Bucher 503-399-5749.
Amended Notices
EIS No. 20110225, Final EIS, FHWA, TN, Interstate 55 Interchange at
E.H. Crump Boulevard and South Boulevard Project, To Provide a Balanced
Solution for Safety and Capacity Issues at the I55 Interchange, City of
Memphis, Shelby County, TN, Review Period Ends: 08/22/2011, Contact:
Charles J. O'Neill 615-781-5772.
Review to FR Notice 07/22/2011: Correction to Review Period End
from 08/15/2011 to 08/22/2011.
EIS No. 20110228, Final EIS, FHWA, IN, I-69 Evansville to Indianapolis
Tier 2 Section 4 Project, From U.S. 231 (Crane NSWC) to IN-37 South of
Bloomington in Section 4, Greene and Monroe Counties, IN, Review Period
Ends: 08/22/2011, Contact: Michelle Allen 317-226-7344.
Review to FR Notice 07/22/2011: Correction to Review Period End
from 08/15/2011 to 08/22/2011.
EIS No. 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects,
Proposal for Three Separate Geothermal Energy and Transmission
Projects, Implementation, Churchill County, NV, Review Period Ends: 08/
22/2011, Contact: Colleen Sievers 775-885-6168.
Review to FR Notice 07/22/2011: Correction to Review Period End
from 08/15/2011 to 08/22/2011.
EIS No. 20110234, Final EIS, FHWA, WI, US 41 Improvement Project,
Extend from Depere--Suamico (Memorial Drive to County M), Brown County,
WI, Review Period Ends: 08/22/2011, Contact: George Poirier 608-829-
7500.
Review to FR Notice 07/22/2011: Correction to Review Period End
from 08/15/2011 to 08/22/2011.
Dated: July 26, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-19234 Filed 7-28-11; 8:45 am]