Drawbridge Operation Regulation; China Basin, San Francisco, CA, 45421 [2011-19187]
Download as PDF
Federal Register / Vol. 76, No. 146 / Friday, July 29, 2011 / Rules and Regulations
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0677]
Drawbridge Operation Regulation;
China Basin, San Francisco, CA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Eleventh
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Third
Street Drawbridge across China Basin,
mile 0.0, at San Francisco, CA. The
deviation is necessary to allow the
public to cross the bridge to participate
in the scheduled San Francisco
Marathon, a community event. This
deviation allows the bridge to remain in
the closed-to-navigation position during
the deviation period.
DATES: This deviation is effective from
7 a.m. to 1 p.m. on July 31, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of the docket USCG–
2011–0677 and are available online by
going to https://www.regulations.gov,
inserting USCG–2011–0677 in the
‘‘Keyword’’ box and then clicking
‘‘Search’’. They are also available for
inspection or copying at the Docket
Management Facility (M–30), U.S.
Department of Transportation, West
Building Ground Floor, Room W12–140,
1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail David H. Sulouff, Chief, Bridge
Section, Eleventh Coast Guard District;
telephone 510–437–3516, e-mail
David.H.Sulouff@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The City
of San Francisco requested a temporary
change to the operation of the Third
Street Drawbridge, mile 0.0, over China
Basin, at San Francisco, CA. The Third
Street Drawbridge navigation span
provides a vertical clearance of 7 feet
above Mean High Water in the closedto-navigation position. The draw opens
on signal if at least one hour notice is
given as required by 33 CFR 117.149.
jlentini on DSK4TPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:04 Jul 28, 2011
Jkt 223001
Navigation on the waterway is
recreational.
The drawspan will be secured in the
closed-to-navigation position 7 a.m. to 1
p.m. on July 31, 2011, to allow
participants in the San Francisco
Marathon to cross the bridge during the
event. This temporary deviation has
been coordinated with the waterway
users. No objections to the proposed
temporary deviation were raised. The
drawspan can be operated upon one
hour advance notice for emergencies
requiring the passage of waterway
traffic.
Vessels that can transit the bridge,
while in the closed-to-navigation
position, may continue to do so at any
time.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 12, 2011.
D.H. Sulouff,
Bridge Section Chief, Eleventh Coast Guard
District.
[FR Doc. 2011–19187 Filed 7–28–11; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket No. USCG–2011–0523]
RIN 1625–AAOO
Safety Zone; Houma Navigation Canal,
From Waterway Mile Markers 19.0 to
20.0, Southwest of Bayou Plat, Bank to
Bank, Terrebonne Parish, LA
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
The Coast Guard is
establishing a temporary safety zone in
the Houma Navigation Canal, from
Waterway Mile Markers 19.0 to 20.0,
Southwest of Bayou Plat, bank to bank,
Terrebonne Parish, Louisiana. This
temporary safety zone is needed to
protect the general public, vessels and
tows from destruction, loss or injury
due to the installation of flood control
structures/barriers. Vessels and tows
transiting this zone transiting the
specified water are required to proceed
at slowest safe speed to minimize wake.
If necessary, entry into, transit through,
mooring, or anchoring within the safety
zone during time of enforcement may be
prohibited unless authorized by the
SUMMARY:
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
45421
Captain of the Port, Morgan City or
designated representative.
DATES: Effective Date: this rule is
effective in the CFR from July 29, 2011
until 11:59 p.m., March 14, 2013. This
rule is effective with actual notice for
purposes of enforcement beginning
12:01 a.m June 27, 2011.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2011–
0523 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–0523 in the ‘‘Keyword’’
box, and then clicking ‘‘Search.’’ They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
rule, call or e-mail Ensign (ENS)
Nicholas Jones, Coast Guard; telephone
985–857–8507 ext. 232, e-mail
Nicholas.B.Jones@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION:
Regulatory Information
The Coast Guard is issuing this
temporary final rule without prior
notice and opportunity to comment
pursuant to authority under section 4(a)
of the Administrative Procedure Act
(APA) (5 U.S.C. 553(b)). This provision
authorizes an agency to issue a rule
without prior notice and opportunity to
comment when the agency for good
cause finds that those procedures are
‘‘impracticable, unnecessary, or contrary
to the public interest.’’ Under 5 U.S.C.
553(b)(B), the Coast Guard finds that
good cause exists for not publishing a
notice of proposed rulemaking (NPRM)
with respect to this rule because
publishing a NPRM would be contrary
to public interest due to the amount of
notification received by the Coast Guard
and the contractually imposed timeline
for the installation of flood control
structures/barriers. The Coast Guard
received notice of the installation
timeline in late May and promptly
completed its required review and
approval of the plan in June, leaving
insufficient time to complete the NPRM
process before the initial canal
operations in June. Additionally,
delaying the canal operations will
impact L & A Contracting Co.
requirements for delivery and
E:\FR\FM\29JYR1.SGM
29JYR1
Agencies
[Federal Register Volume 76, Number 146 (Friday, July 29, 2011)]
[Rules and Regulations]
[Page 45421]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19187]
[[Page 45421]]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0677]
Drawbridge Operation Regulation; China Basin, San Francisco, CA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eleventh Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Third Street Drawbridge across China Basin, mile 0.0, at San Francisco,
CA. The deviation is necessary to allow the public to cross the bridge
to participate in the scheduled San Francisco Marathon, a community
event. This deviation allows the bridge to remain in the closed-to-
navigation position during the deviation period.
DATES: This deviation is effective from 7 a.m. to 1 p.m. on July 31,
2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of the docket USCG-2011-0677 and are available
online by going to https://www.regulations.gov, inserting USCG-2011-0677
in the ``Keyword'' box and then clicking ``Search''. They are also
available for inspection or copying at the Docket Management Facility
(M-30), U.S. Department of Transportation, West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail David H. Sulouff, Chief, Bridge Section, Eleventh Coast
Guard District; telephone 510-437-3516, e-mail
David.H.Sulouff@uscg.mil. If you have questions on viewing the docket,
call Renee V. Wright, Program Manager, Docket Operations, telephone
202-366-9826.
SUPPLEMENTARY INFORMATION: The City of San Francisco requested a
temporary change to the operation of the Third Street Drawbridge, mile
0.0, over China Basin, at San Francisco, CA. The Third Street
Drawbridge navigation span provides a vertical clearance of 7 feet
above Mean High Water in the closed-to-navigation position. The draw
opens on signal if at least one hour notice is given as required by 33
CFR 117.149. Navigation on the waterway is recreational.
The drawspan will be secured in the closed-to-navigation position 7
a.m. to 1 p.m. on July 31, 2011, to allow participants in the San
Francisco Marathon to cross the bridge during the event. This temporary
deviation has been coordinated with the waterway users. No objections
to the proposed temporary deviation were raised. The drawspan can be
operated upon one hour advance notice for emergencies requiring the
passage of waterway traffic.
Vessels that can transit the bridge, while in the closed-to-
navigation position, may continue to do so at any time.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 12, 2011.
D.H. Sulouff,
Bridge Section Chief, Eleventh Coast Guard District.