Download as PDF Federal Register / Vol. 76, No. 136 / Friday, July 15, 2011 / Notices SECURITIES AND EXCHANGE COMMISSION By the Commission. Jill M. Peterson, Assistant Secretary. [File No. 500–1] [FR Doc. 2011–17971 Filed 7–13–11; 4:15 pm] BILLING CODE 8011–01–P In the Matter of Maxicare Health Plans, Inc., MetroConnect Inc., Microislet, Inc., Mobicom Corp., MTI Technology Corp., and North American Scientific, Inc.; Order of Suspension of Trading mstockstill on DSK4VPTVN1PROD with NOTICES July 13, 2011. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of Maxicare Health Plans, Inc. because it has not filed any periodic reports since the period ended September 30, 2006. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of MetroConnect Inc. because it has not filed any periodic reports since the period ended December 31, 2008. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of Microislet, Inc. because it has not filed any periodic reports since the period ended June 30, 2008. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities Mobicom Corp. because it has not filed any periodic reports since the period ended September 30, 2008. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of MTI Technology Corp. because it has not filed any periodic reports since it filed a registration statement on July 7, 2007. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of North American Scientific, Inc. because it has not filed any periodic reports since it filed a registration statement on January 31, 2009. The Commission is of the opinion that the public interest and the protection of investors require a suspension of trading in the securities of the above-listed companies. Therefore, it is ordered, pursuant to Section 12(k) of the Securities Exchange Act of 1934, that trading in the securities of the above-listed companies is suspended for the period from 9:30 a.m. EDT on July 13, 2011, through 11:59 p.m. EDT on July 26, 2011. VerDate Mar<15>2010 16:55 Jul 14, 2011 Jkt 223001 SECURITIES AND EXCHANGE COMMISSION [File No. 500–1] Columbus Geographic Systems (GIS) Ltd.; Order of Suspension of Trading July 13, 2011. It appears to the Securities and Exchange Commission that there is a lack of current and accurate information concerning the securities of Columbus Geographic Systems (GIS) Ltd. because it has not filed any periodic reports since the period ended June 30, 2008. The Commission is of the opinion that the public interest and the protection of investors require a suspension of trading in the securities of the above-listed company. Therefore, it is ordered, pursuant to Section 12(k) of the Securities Exchange Act of 1934, that trading in the securities of the abovelisted company is suspended for the period from 9:30 a.m. EDT on July 13, 2011 through 11:59 p.m. EDT on July 26, 2011. By the Commission. Jill M. Peterson, Assistant Secretary. [FR Doc. 2011–17970 Filed 7–13–11; 4:15 pm] BILLING CODE 8011–01–P 41855 are required to register with the Selective Service System. Frequency: Registration with the Selective Service System is a one-time occurrence. Burden: A burden of two minutes or less on the individual respondent. Copies of the above identified form can be obtained upon written request to the Selective Service System, Reports Clearance Officer, 1515 Wilson Boulevard, Arlington, Virginia 22209– 2425. Written comments and recommendations for the proposed extension of clearance of the form should be sent within 30 days of the publication of this notice to the Selective Service System, Reports Clearance Officer, 1515 Wilson Boulevard, Arlington, Virginia 22209– 2425. A copy of the comments should be sent to the Office of Information and Regulatory Affairs, Attention: Desk Officer, Selective Service System, Office of Management and Budget, New Executive Office Building, Room 3235, Washington, DC 20503. Dated: July 6, 2011. Lawrence G. Romo, Director. [FR Doc. 2011–17673 Filed 7–14–11; 8:45 am] BILLING CODE 8015–01–M SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at June 23, 2011, Meeting SELECTIVE SERVICE SYSTEM AGENCY: Forms Submitted to the Office of Management and Budget for Extension of Clearance SUMMARY: Selective Service System. Notice. AGENCY: ACTION: The following form has been submitted to the Office of Management and Budget (OMB) for extension of clearance in compliance with the Paperwork Reduction Act (44 U.S.C. Chapter 35): SSS Form 1 Title: The Selective Service System Registration Form. Purpose: Is used to register men and establish a data base for use in identifying manpower to the military services during a national emergency. Respondents: All 18-year-old males who are United States citizens and those male immigrants residing in the United States at the time of their 18th birthday PO 00000 Frm 00103 Fmt 4703 Sfmt 4703 Susquehanna River Basin Commission. ACTION: Notice. As part of its regular business meeting held on June 23, 2011, in North East, Maryland, the Commission convened a public hearing, at which it took the following actions: (1) Approved settlement involving one water resources project; (2) approved and tabled the applications of certain water resources projects, including six involving diversions of water into the Susquehanna River Basin; (3) rescinded approval for two water resources projects; (4) denied an administrative appeal by Allegheny Defense Project on three diversions into the Susquehanna River Basin from the Ohio River Basin approved by the Commission at its March 2011 meeting; (5) amended its Regulatory Program Fee Schedule to take effect on July 1, 2011; and (6) amended its comprehensive plan. DATES: June 23, 2011. E:\FR\FM\15JYN1.SGM 15JYN1 41856 Federal Register / Vol. 76, No. 136 / Friday, July 15, 2011 / Notices Susquehanna River Basin Commission, 1721 N. Front Street, Harrisburg, PA 17102–2391. FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, telephone: (717) 238–0423, ext. 306; fax: (717) 238–2436; e-mail: rcairo@srbc.net; or Stephanie L. Richardson, Secretary to the Commission, telephone: (717) 238– 0423, ext. 304; fax: (717) 238–2436; email: srichardson@srbc.net. Regular mail inquiries may be sent to the above address. See also Commission Web site at https://www.srbc.net. SUPPLEMENTARY INFORMATION: In addition to the public hearing and its related actions on projects identified in the summary above and the listings below, the following items were also presented or acted on at the business meeting: (1) Adoption of the proposed Water Resources Program for FY 2012– 2013 and an accompanying presentation on the Commission’s Chesapeake Bay related activities; (2) a report on hydrologic conditions in the basin; (3) approval of proposed rulemaking to revise the Commission’s project review regulations, including the establishment of an August 23, 2011, comment period and the scheduling of public hearings in Harrisburg, Pennsylvania and Binghamton, New York; (4) a preliminary introduction to dockets; (5) a presentation on a pooled assets concept by PPL, Inc.; (6) a report on acquisition of a new SRBC headquarters facility; (7) adoption of a FY–2013 budget commencing July 1, 2012; (8) support of additional FY–2012 funding of U.S. Geological Survey’s National Streamflow Information Program; (9) election of the member representing the Commonwealth of Pennsylvania as the new Chair and the member representing the State of Maryland as the new Vice Chair of the Commission to serve in the next fiscal year; and (10) ratification/ approval of grants/contracts. The Commission heard counsel’s report on legal matters affecting the Commission. The Commission also convened a public hearing and took the following actions: ADDRESSES: mstockstill on DSK4VPTVN1PROD with NOTICES Public Hearing—Compliance Matter The Commission approved a settlement in lieu of civil penalties for the following project: 1. Nature’s Way Purewater Systems, Inc.; Pittston Facility; Pittston Township, Luzerne County, Pa.— $15,000. Public Hearing—Rescissions of Project Approvals 1. Project Sponsor and Facility: Anadarko E&P Company LP (West Branch Susquehanna River-2) (Docket VerDate Mar<15>2010 16:55 Jul 14, 2011 Jkt 223001 No. 20090306), Renovo Borough, Clinton County, Pa. 2. Project Sponsor and Facility: Pennsylvania Food Group, LLC (Docket No. 20030411), West Donegal Township, Lancaster County, Pa. Public Hearing—Projects Approved 1. Project Sponsor and Facility: Anadarko E&P Company LP (Pine Creek—Jersey Mills), McHenry Township, Lycoming County, Pa. Surface water withdrawal of up to 1.500 mgd. 2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Monroe Manor Water System, Monroe Township, Snyder County, Pa. Groundwater withdrawal of up to 0.302 mgd from Well 7. 3. Project Sponsor and Facility: Carrizo Marcellus, LLC (Meshoppen Creek), Washington Township, Wyoming County, Pa. Surface water withdrawal of up to 2.160 mgd. 4. Project Sponsor and Facility: Carrizo Marcellus, LLC (Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa. Surface water withdrawal of up to 0.432 mgd. 5. Project Sponsor and Facility: Carrizo Marcellus, LLC (Unnamed Tributary of Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa. Surface water withdrawal of up to 0.720 mgd. 6. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Wappasening Creek), Windham Township, Bradford County, Pa. Surface water withdrawal of up to 0.900 mgd. 7. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Wyalusing Creek), Rush Township, Susquehanna County, Pa. Surface water withdrawal of up to 0.715 mgd, subject to rescission of Docket Nos. 20081227 and 20090610. 8. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Wysox Creek), Rome Township, Bradford County, Pa. Surface water withdrawal of up to 0.504 mgd. 9. Project Sponsor: Exelon Generation Company, LLC. Project Facility: Peach Bottom Atomic Power Station, Peach Bottom Township, York County, Pa. Modification to increase consumptive water use from 32.490 mgd up to 49.000 mgd (Docket No. 20061209). 10. Project Sponsor: Exelon Generation Company, LLC. Project Facility: Three Mile Island Generating Station, Londonderry Township, Dauphin County, Pa. Surface water withdrawal of up to 122.800 mgd and consumptive water use of up to 19.200 mgd. PO 00000 Frm 00104 Fmt 4703 Sfmt 4703 11. Project Sponsor and Facility: Fox Road Waterworks, LLC (South Branch Tunkhannock Creek), Tunkhannock Township, Wyoming County, Pa. Surface water withdrawal of up to 0.157 mgd. 12. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg Borough, Tioga County, Pa. Groundwater withdrawal of up to 0.216 mgd from Well HR–1 and consumptive water use of up to 0.316 mgd from Well HR–1 and public water supply. 13. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Driftwood Branch Sinnemahoning Creek), Emporium Borough, Cameron County, Pa. Surface water withdrawal of up to 0.999 mgd. 14. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Surface water withdrawal of up to 1.292 mgd. 15. Project Sponsor and Facility: LHP Management, LLC (Fishing Creek— Clinton Country Club), Bald Eagle Township, Clinton County, Pa. Modification to conditions of the withdrawal approval (Docket No. 20090906). 16. Project Sponsor and Facility: Mount Joy Borough Authority, Mount Joy Borough, Lancaster County, Pa. Groundwater withdrawals of up to 1.227 mgd from Well 1 and 1.165 mgd from Well 2. 17. Project Sponsor and Facility: Nature’s Way Purewater Systems, Inc., Dupont Borough, Luzerne County, Pa. Groundwater withdrawal of up to 0.057 mgd from Covington Springs Borehole 1 (BH–1) and consumptive water use of up to 0.257 mgd from BH–1 and public water supply. 18. Project Sponsor: New Morgan Landfill Company, Inc. Project Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa. Groundwater withdrawal of up to 0.008 mgd from Well SW–3. 19. Project Sponsor and Facility: Seneca Resources Corporation (Genesee Forks), Pike Township, Potter County, Pa. Surface water withdrawal of up to 0.500 mgd. 20. Project Sponsor and Facility: Talisman Energy USA Inc. (Wappasening Creek), Windham Township, Bradford County, Pa. Surface water withdrawal of up to 1.000 mgd. 21. Project Sponsor and Facility: Tennessee Gas Pipeline Company (Meshoppen Creek—Loop 319), Springville Township, Susquehanna County, Pa. Surface water withdrawal of up to 1.090 mgd. 22. Project Sponsor and Facility: Tennessee Gas Pipeline Company E:\FR\FM\15JYN1.SGM 15JYN1 Federal Register / Vol. 76, No. 136 / Friday, July 15, 2011 / Notices (Susquehanna River—Loop 317), Asylum Township, Bradford County, Pa. Surface water withdrawal of up to 4.032 mgd. 23. Project Sponsor and Facility: Tennessee Gas Pipeline Company (Tioga River—Loop 315), Richmond Township, Tioga County, Pa. Surface water withdrawal of up to 3.140 mgd. 24. Project Sponsor and Facility: Tennessee Gas Pipeline Company (Unnamed Tributary of North Elk Run), Richmond Township, Tioga County, Pa. Surface water withdrawal of up to 0.144 mgd. 25. Project Sponsor and Facility: Tennessee Gas Pipeline Company (Towanda Creek—Loop 317), Monroe Township, Bradford County, Pa. Surface water withdrawal of up to 4.032 mgd. 26. Project Sponsor and Facility: Tennessee Gas Pipeline Company (White Creek—Loop 319), Springville Township, Susquehanna County, Pa. Surface water withdrawal of up to 0.384 mgd. 27. Project Sponsor and Facility: Williamsport Municipal Water Authority, Williamsport City, Lycoming County, Pa. Groundwater withdrawals of up to 1.300 mgd from Well 10 and 0.700 mgd from Well 11. mstockstill on DSK4VPTVN1PROD with NOTICES Public Hearing—Projects Approved Involving a Diversion 1. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Borough of Ebensburg, Cambria Township, Cambria County, Pa. Into-basin diversion of up to 0.249 mgd from the Ohio River Basin. 2. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Cambria Somerset Authority, Summerhill Township, Cambria County, Pa. Into-basin diversion of up to 0.249 mgd from the Ohio River Basin. 3. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Highland Sewer and Water Authority, Portage Township, Cambria County, Pa. Into-basin diversion of up to 0.249 mgd from the Ohio River Basin. 4. Project Sponsor: Nature’s Way Purewater Systems, Inc. Project Facility: Nature’s Way Springs Borehole 1 (BH– 1), Foster Township, Luzerne County, Pa. Into-basin diversion of up to 0.099 mgd from the Delaware River Basin. 5. Project Sponsor: Penn Virginia Oil & Gas Corporation. Project Facility: Port Allegany Borough, McKean County, Pa. Into-basin diversion of up to 0.100 mgd from the Ohio River Basin. 6. Project Sponsor: Triana Energy, LLC. Project Facility: Johnson Quarry, Roulette Township, Potter County, Pa. Into-basin diversion of up to 0.500 mgd from the Ohio River Basin. VerDate Mar<15>2010 16:55 Jul 14, 2011 Jkt 223001 Public Hearing—Projects Tabled 1. Project Sponsor and Facility: Dunn Lake LLC (Dunn Lake), Ararat Township, Susquehanna County, Pa. Application for surface water withdrawal of up to 0.999 mgd. 2. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC (Babb Creek), Morris Township, Tioga County, Pa. Application for surface water withdrawal of up to 0.950 mgd. 3. Project Sponsor: SWEPI, LP. Project Facility: Pennsylvania American Water Company—Warren District, Warren City, Warren County, Pa. Application for an into-basin diversion of up to 3.000 mgd from the Ohio River Basin. Public Hearing—Projects Withdrawn 1. Project Sponsor and Facility: Anadarko E&P Company LP (West Branch Susquehanna River–4), Burnside Township, Centre County, Pa. Application for surface water withdrawal of up to 0.720 mgd. 2. Project Sponsor and Facility: Anadarko E&P Company LP (Wolf Run), Snow Shoe Township, Centre County, Pa. Application for surface water withdrawal of up to 0.499 mgd. Public Hearing—Administrative Appeal The Commission denied an administrative appeal by the Allegheny Defense Project of the March 10, 2011, Commission action approving the following projects: 1. Docket No. 20110316. Project Sponsor: Pennsylvania General Energy Company, L.L.C. Project Facility: Scaffold Lick Pond—1, Liberty Township, McKean County, Pa., authorizing an existing into-basin diversion of up to 0.500 mgd from the Ohio River Basin. 2. Docket No. 20110317. Project Sponsor: Pennsylvania General Energy Company, L.L.C. Project Facility: Scaffold Lick Pond—2, Liberty Township, McKean County, Pa., authorizing an existing into-basin diversion of up to 0.500 mgd from the Ohio River Basin. 3. Docket No. 20110318. Project Sponsor: Ultra Resources, Inc. Project Facility: Wayne Gravel Products, Ceres Township, McKean County, Pa., authorizing an existing into-basin diversion of up to 1.170 mgd from the Ohio River Basin. Public Hearing—Amendments to Regulatory Program Fee Schedule The Commission approved amendments to its Regulatory Program Fee Schedule intended to help defray the cost of its Regulatory Program for water resource projects as well as to establish a special rate for multiple PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 41857 transfer of approvals in a single transaction and to make clarifications regarding the application of compliance monitoring fees to administratively approved projects, refunds on withdrawn or terminated applications, and the interest rate on installment payments. The amended fee schedule, which can be accessed at the Commission’s web site www.srbc.net, became effective on July 1, 2011. Public Hearing—Comprehensive Plan Amendments The Commission amended its comprehensive plan to include the newly adopted Water Resources Program (FY 2012/2013), the Migratory Fish Management and Restoration Plan for the Susquehanna River Basin, and all projects approved by the Commission since the last revision of the Comprehensive Plan. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: July 6, 2011. Thomas W. Beauduy, Deputy Executive Director. [FR Doc. 2011–17922 Filed 7–14–11; 8:45 am] BILLING CODE 7040–01–P OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE Petition Under Section 302 on Alleged Expropriations by the Dominican Republic; Decision Not To Initiate Investigation Office of the United States Trade Representative. ACTION: Decision not to initiate investigation. AGENCY: On May 24, 2011, the Office of the United States Trade Representative (USTR) received a petition under Section 302 of the Trade Act of 1974, as amended (‘‘Trade Act’’), requesting that the United States Trade Representative (‘‘Trade Representative’’) initiate an investigation under sections 301–309 of the Trade Act (‘‘Section 301’’) with respect to alleged expropriations without adequate compensation by the Government of the Dominican Republic, resulting in an alleged breach of the Dominican Republic’s obligations under the Dominican Republic-Central AmericaUnited States Free Trade Agreement (CAFTA–DR), as well as being otherwise unreasonable and discriminatory. In accordance with the advice of the interagency Section 301 Committee, the Trade Representative has determined SUMMARY: E:\FR\FM\15JYN1.SGM 15JYN1

Agencies

[Federal Register Volume 76, Number 136 (Friday, July 15, 2011)]
[Notices]
[Pages 41855-41857]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-17922]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Actions Taken at June 23, 2011, Meeting

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: As part of its regular business meeting held on June 23, 2011, 
in North East, Maryland, the Commission convened a public hearing, at 
which it took the following actions: (1) Approved settlement involving 
one water resources project; (2) approved and tabled the applications 
of certain water resources projects, including six involving diversions 
of water into the Susquehanna River Basin; (3) rescinded approval for 
two water resources projects; (4) denied an administrative appeal by 
Allegheny Defense Project on three diversions into the Susquehanna 
River Basin from the Ohio River Basin approved by the Commission at its 
March 2011 meeting; (5) amended its Regulatory Program Fee Schedule to 
take effect on July 1, 2011; and (6) amended its comprehensive plan.

DATES: June 23, 2011.

[[Page 41856]]


ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street, 
Harrisburg, PA 17102-2391.

FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel, 
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; e-mail: 
rcairo@srbc.net; or Stephanie L. Richardson, Secretary to the 
Commission, telephone: (717) 238-0423, ext. 304; fax: (717) 238-2436; 
e-mail: srichardson@srbc.net. Regular mail inquiries may be sent to the 
above address. See also Commission Web site at https://www.srbc.net.

SUPPLEMENTARY INFORMATION: In addition to the public hearing and its 
related actions on projects identified in the summary above and the 
listings below, the following items were also presented or acted on at 
the business meeting: (1) Adoption of the proposed Water Resources 
Program for FY 2012-2013 and an accompanying presentation on the 
Commission's Chesapeake Bay related activities; (2) a report on 
hydrologic conditions in the basin; (3) approval of proposed rulemaking 
to revise the Commission's project review regulations, including the 
establishment of an August 23, 2011, comment period and the scheduling 
of public hearings in Harrisburg, Pennsylvania and Binghamton, New 
York; (4) a preliminary introduction to dockets; (5) a presentation on 
a pooled assets concept by PPL, Inc.; (6) a report on acquisition of a 
new SRBC headquarters facility; (7) adoption of a FY-2013 budget 
commencing July 1, 2012; (8) support of additional FY-2012 funding of 
U.S. Geological Survey's National Streamflow Information Program; (9) 
election of the member representing the Commonwealth of Pennsylvania as 
the new Chair and the member representing the State of Maryland as the 
new Vice Chair of the Commission to serve in the next fiscal year; and 
(10) ratification/approval of grants/contracts. The Commission heard 
counsel's report on legal matters affecting the Commission. The 
Commission also convened a public hearing and took the following 
actions:

Public Hearing--Compliance Matter

    The Commission approved a settlement in lieu of civil penalties for 
the following project:
    1. Nature's Way Purewater Systems, Inc.; Pittston Facility; 
Pittston Township, Luzerne County, Pa.--$15,000.

Public Hearing--Rescissions of Project Approvals

    1. Project Sponsor and Facility: Anadarko E&P Company LP (West 
Branch Susquehanna River-2) (Docket No. 20090306), Renovo Borough, 
Clinton County, Pa.
    2. Project Sponsor and Facility: Pennsylvania Food Group, LLC 
(Docket No. 20030411), West Donegal Township, Lancaster County, Pa.

Public Hearing--Projects Approved

    1. Project Sponsor and Facility: Anadarko E&P Company LP (Pine 
Creek--Jersey Mills), McHenry Township, Lycoming County, Pa. Surface 
water withdrawal of up to 1.500 mgd.
    2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: 
Monroe Manor Water System, Monroe Township, Snyder County, Pa. 
Groundwater withdrawal of up to 0.302 mgd from Well 7.
    3. Project Sponsor and Facility: Carrizo Marcellus, LLC (Meshoppen 
Creek), Washington Township, Wyoming County, Pa. Surface water 
withdrawal of up to 2.160 mgd.
    4. Project Sponsor and Facility: Carrizo Marcellus, LLC (Middle 
Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa. 
Surface water withdrawal of up to 0.432 mgd.
    5. Project Sponsor and Facility: Carrizo Marcellus, LLC (Unnamed 
Tributary of Middle Branch Wyalusing Creek), Forest Lake Township, 
Susquehanna County, Pa. Surface water withdrawal of up to 0.720 mgd.
    6. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Wappasening Creek), Windham Township, Bradford County, Pa. Surface 
water withdrawal of up to 0.900 mgd.
    7. Project Sponsor and Facility: Chesapeake Appalachia, LLC 
(Wyalusing Creek), Rush Township, Susquehanna County, Pa. Surface water 
withdrawal of up to 0.715 mgd, subject to rescission of Docket Nos. 
20081227 and 20090610.
    8. Project Sponsor and Facility: Chesapeake Appalachia, LLC (Wysox 
Creek), Rome Township, Bradford County, Pa. Surface water withdrawal of 
up to 0.504 mgd.
    9. Project Sponsor: Exelon Generation Company, LLC. Project 
Facility: Peach Bottom Atomic Power Station, Peach Bottom Township, 
York County, Pa. Modification to increase consumptive water use from 
32.490 mgd up to 49.000 mgd (Docket No. 20061209).
    10. Project Sponsor: Exelon Generation Company, LLC. Project 
Facility: Three Mile Island Generating Station, Londonderry Township, 
Dauphin County, Pa. Surface water withdrawal of up to 122.800 mgd and 
consumptive water use of up to 19.200 mgd.
    11. Project Sponsor and Facility: Fox Road Waterworks, LLC (South 
Branch Tunkhannock Creek), Tunkhannock Township, Wyoming County, Pa. 
Surface water withdrawal of up to 0.157 mgd.
    12. Project Sponsor and Facility: Hydro Recovery, LP, Blossburg 
Borough, Tioga County, Pa. Groundwater withdrawal of up to 0.216 mgd 
from Well HR-1 and consumptive water use of up to 0.316 mgd from Well 
HR-1 and public water supply.
    13. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Driftwood Branch Sinnemahoning Creek), Emporium Borough, Cameron 
County, Pa. Surface water withdrawal of up to 0.999 mgd.
    14. Project Sponsor and Facility: Keystone Clearwater Solutions, 
LLC (Lycoming Creek), Lewis Township, Lycoming County, Pa. Surface 
water withdrawal of up to 1.292 mgd.
    15. Project Sponsor and Facility: LHP Management, LLC (Fishing 
Creek--Clinton Country Club), Bald Eagle Township, Clinton County, Pa. 
Modification to conditions of the withdrawal approval (Docket No. 
20090906).
    16. Project Sponsor and Facility: Mount Joy Borough Authority, 
Mount Joy Borough, Lancaster County, Pa. Groundwater withdrawals of up 
to 1.227 mgd from Well 1 and 1.165 mgd from Well 2.
    17. Project Sponsor and Facility: Nature's Way Purewater Systems, 
Inc., Dupont Borough, Luzerne County, Pa. Groundwater withdrawal of up 
to 0.057 mgd from Covington Springs Borehole 1 (BH-1) and consumptive 
water use of up to 0.257 mgd from BH-1 and public water supply.
    18. Project Sponsor: New Morgan Landfill Company, Inc. Project 
Facility: Conestoga Landfill, New Morgan Borough, Berks County, Pa. 
Groundwater withdrawal of up to 0.008 mgd from Well SW-3.
    19. Project Sponsor and Facility: Seneca Resources Corporation 
(Genesee Forks), Pike Township, Potter County, Pa. Surface water 
withdrawal of up to 0.500 mgd.
    20. Project Sponsor and Facility: Talisman Energy USA Inc. 
(Wappasening Creek), Windham Township, Bradford County, Pa. Surface 
water withdrawal of up to 1.000 mgd.
    21. Project Sponsor and Facility: Tennessee Gas Pipeline Company 
(Meshoppen Creek--Loop 319), Springville Township, Susquehanna County, 
Pa. Surface water withdrawal of up to 1.090 mgd.
    22. Project Sponsor and Facility: Tennessee Gas Pipeline Company

[[Page 41857]]

(Susquehanna River--Loop 317), Asylum Township, Bradford County, Pa. 
Surface water withdrawal of up to 4.032 mgd.
    23. Project Sponsor and Facility: Tennessee Gas Pipeline Company 
(Tioga River--Loop 315), Richmond Township, Tioga County, Pa. Surface 
water withdrawal of up to 3.140 mgd.
    24. Project Sponsor and Facility: Tennessee Gas Pipeline Company 
(Unnamed Tributary of North Elk Run), Richmond Township, Tioga County, 
Pa. Surface water withdrawal of up to 0.144 mgd.
    25. Project Sponsor and Facility: Tennessee Gas Pipeline Company 
(Towanda Creek--Loop 317), Monroe Township, Bradford County, Pa. 
Surface water withdrawal of up to 4.032 mgd.
    26. Project Sponsor and Facility: Tennessee Gas Pipeline Company 
(White Creek--Loop 319), Springville Township, Susquehanna County, Pa. 
Surface water withdrawal of up to 0.384 mgd.
    27. Project Sponsor and Facility: Williamsport Municipal Water 
Authority, Williamsport City, Lycoming County, Pa. Groundwater 
withdrawals of up to 1.300 mgd from Well 10 and 0.700 mgd from Well 11.

Public Hearing--Projects Approved Involving a Diversion

    1. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Borough 
of Ebensburg, Cambria Township, Cambria County, Pa. Into-basin 
diversion of up to 0.249 mgd from the Ohio River Basin.
    2. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Cambria 
Somerset Authority, Summerhill Township, Cambria County, Pa. Into-basin 
diversion of up to 0.249 mgd from the Ohio River Basin.
    3. Project Sponsor: Chief Oil & Gas LLC. Project Facility: Highland 
Sewer and Water Authority, Portage Township, Cambria County, Pa. Into-
basin diversion of up to 0.249 mgd from the Ohio River Basin.
    4. Project Sponsor: Nature's Way Purewater Systems, Inc. Project 
Facility: Nature's Way Springs Borehole 1 (BH-1), Foster Township, 
Luzerne County, Pa. Into-basin diversion of up to 0.099 mgd from the 
Delaware River Basin.
    5. Project Sponsor: Penn Virginia Oil & Gas Corporation. Project 
Facility: Port Allegany Borough, McKean County, Pa. Into-basin 
diversion of up to 0.100 mgd from the Ohio River Basin.
    6. Project Sponsor: Triana Energy, LLC. Project Facility: Johnson 
Quarry, Roulette Township, Potter County, Pa. Into-basin diversion of 
up to 0.500 mgd from the Ohio River Basin.

Public Hearing--Projects Tabled

    1. Project Sponsor and Facility: Dunn Lake LLC (Dunn Lake), Ararat 
Township, Susquehanna County, Pa. Application for surface water 
withdrawal of up to 0.999 mgd.
    2. Project Sponsor and Facility: Keystone Clearwater Solutions, LLC 
(Babb Creek), Morris Township, Tioga County, Pa. Application for 
surface water withdrawal of up to 0.950 mgd.
    3. Project Sponsor: SWEPI, LP. Project Facility: Pennsylvania 
American Water Company--Warren District, Warren City, Warren County, 
Pa. Application for an into-basin diversion of up to 3.000 mgd from the 
Ohio River Basin.

Public Hearing--Projects Withdrawn

    1. Project Sponsor and Facility: Anadarko E&P Company LP (West 
Branch Susquehanna River-4), Burnside Township, Centre County, Pa. 
Application for surface water withdrawal of up to 0.720 mgd.
    2. Project Sponsor and Facility: Anadarko E&P Company LP (Wolf 
Run), Snow Shoe Township, Centre County, Pa. Application for surface 
water withdrawal of up to 0.499 mgd.

Public Hearing--Administrative Appeal

    The Commission denied an administrative appeal by the Allegheny 
Defense Project of the March 10, 2011, Commission action approving the 
following projects:
    1. Docket No. 20110316. Project Sponsor: Pennsylvania General 
Energy Company, L.L.C. Project Facility: Scaffold Lick Pond--1, Liberty 
Township, McKean County, Pa., authorizing an existing into-basin 
diversion of up to 0.500 mgd from the Ohio River Basin.
    2. Docket No. 20110317. Project Sponsor: Pennsylvania General 
Energy Company, L.L.C. Project Facility: Scaffold Lick Pond--2, Liberty 
Township, McKean County, Pa., authorizing an existing into-basin 
diversion of up to 0.500 mgd from the Ohio River Basin.
    3. Docket No. 20110318. Project Sponsor: Ultra Resources, Inc. 
Project Facility: Wayne Gravel Products, Ceres Township, McKean County, 
Pa., authorizing an existing into-basin diversion of up to 1.170 mgd 
from the Ohio River Basin.

Public Hearing--Amendments to Regulatory Program Fee Schedule

    The Commission approved amendments to its Regulatory Program Fee 
Schedule intended to help defray the cost of its Regulatory Program for 
water resource projects as well as to establish a special rate for 
multiple transfer of approvals in a single transaction and to make 
clarifications regarding the application of compliance monitoring fees 
to administratively approved projects, refunds on withdrawn or 
terminated applications, and the interest rate on installment payments. 
The amended fee schedule, which can be accessed at the Commission's web 
site www.srbc.net, became effective on July 1, 2011.

Public Hearing--Comprehensive Plan Amendments

    The Commission amended its comprehensive plan to include the newly 
adopted Water Resources Program (FY 2012/2013), the Migratory Fish 
Management and Restoration Plan for the Susquehanna River Basin, and 
all projects approved by the Commission since the last revision of the 
Comprehensive Plan.

    Authority:  Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: July 6, 2011.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2011-17922 Filed 7-14-11; 8:45 am]