FPL Energy Maine Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, 41236 [2011-17589]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
41236
Federal Register / Vol. 76, No. 134 / Wednesday, July 13, 2011 / Notices
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
VerDate Mar<15>2010
17:36 Jul 12, 2011
Jkt 223001
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: July 28, 2011.
Dated: July 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–17595 Filed 7–12–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2283–064]
FPL Energy Maine Hydro, LLC; Notice
of Application Accepted for Filing and
Soliciting Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Supplement to
recreation and land/trail management
plan.
b. Project No.: 2283–064.
c. Date Filed: March 25, 2011.
d. Applicant: FPL Energy Maine
Hydro, LLC.
e. Name of Project: Gulf Island-Deer
Rips Hydroelectric Project.
f. Location: Androscoggin River in
Androscoggin County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ernest Deluca,
(800) 371–7774,
ernest.m.deluca@nexteraenergy.com.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments:
August 8, 2011.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
PO 00000
Frm 00051
Fmt 4703
Sfmt 9990
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2283–064) on any
comments filed.
k. Description of Application:
Pursuant to the Commission’s Order
Modifying and Approving Recreation
Plan and Land/Trail Management Plan
issued March 25, 2010, FPL Energy
Maine Hydro, LLC (licensee) filed an
assessment of lands within 200 feet of
the project impoundments with the goal
of identifying additional lands needed
for project purposes. As a result of its
assessment, the licensee found that no
additional lands are needed for project
purposes and proposes no changes to
the project boundary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–2283) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments: In determining the
appropriate action to take, the
Commission will consider all comments
filed. Any comments must be received
on or before the specified comment date
for the particular application.
Dated: July 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–17589 Filed 7–12–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
[Federal Register Volume 76, Number 134 (Wednesday, July 13, 2011)]
[Notices]
[Page 41236]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-17589]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2283-064]
FPL Energy Maine Hydro, LLC; Notice of Application Accepted for
Filing and Soliciting Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Supplement to recreation and land/trail
management plan.
b. Project No.: 2283-064.
c. Date Filed: March 25, 2011.
d. Applicant: FPL Energy Maine Hydro, LLC.
e. Name of Project: Gulf Island-Deer Rips Hydroelectric Project.
f. Location: Androscoggin River in Androscoggin County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Ernest Deluca, (800) 371-7774,
ernest.m.deluca@nexteraenergy.com.
i. FERC Contact: Mark Carter, (678) 245-3083, mark.carter@ferc.gov.
j. Deadline for filing comments: August 8, 2011.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-2283-064) on any comments filed.
k. Description of Application: Pursuant to the Commission's Order
Modifying and Approving Recreation Plan and Land/Trail Management Plan
issued March 25, 2010, FPL Energy Maine Hydro, LLC (licensee) filed an
assessment of lands within 200 feet of the project impoundments with
the goal of identifying additional lands needed for project purposes.
As a result of its assessment, the licensee found that no additional
lands are needed for project purposes and proposes no changes to the
project boundary.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-2283) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments: In determining the appropriate action to take, the
Commission will consider all comments filed. Any comments must be
received on or before the specified comment date for the particular
application.
Dated: July 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-17589 Filed 7-12-11; 8:45 am]