Drawbridge Operation Regulation; Old River Channel of the Cuyahoga River, Cleveland, OH, 40616 [2011-17257]

Download as PDF 40616 Federal Register / Vol. 76, No. 132 / Monday, July 11, 2011 / Rules and Regulations rate may change. When the interest rate is later locked, a revised GFE must be provided showing the revised interest rate-dependent charges and terms. The loan originator must provide the revised GFE within 3 business days of the interest rate being locked or, for an expired interest rate, re-locked. All other charges and terms must remain the same as on the original GFE, except as otherwise provided in paragraph (f) of this section. (6) New construction home purchases. In transactions involving new construction home purchases, where settlement is anticipated to occur more than 60 calendar days from the time a GFE is provided, the loan originator may provide the GFE to the borrower with a clear and conspicuous disclosure stating that at any time up until 60 calendar days prior to closing, the loan originator may issue a revised GFE. If no such separate disclosure is provided, the loan originator cannot issue a revised GFE, except as otherwise provided in paragraph (f) of this section. * * * * * ■ 4. In § 3500.8, the paragraph heading of paragraph (c) is corrected to read as follows: amount for that service, and the estimate on the GFE of the charge for the service should not be included in any amounts shown on the comparison chart on Page 3 of the HUD– 1. The comparison chart is comprised of three sections: ‘‘Charges That Cannot Increase’’, ‘‘Charges That Cannot Increase More Than 10%’’, and ‘‘Charges That Can Change’’. § 3500.8 Use of HUD–1 or HUD–1A settlement statements. ACTION: * * * * * (c) Violations of section 4 of RESPA (12 U.S.C. 2603). * * * * * * * * ■ 5. Appendix A to Part 3500 is amended as follows: ■ a. Revise the Instructions for Lines 601 and 602. ■ b. Revise the first paragraph of the Instructions for Page 3. The revisions read as follows: Appendix A to Part 3500—Instructions for Completing HUD–1 and HUD–1a Settlement Statements; Sample HUD–1 and HUD–1a Statements * * * * * Lines 601 and 602 are summary lines for the Seller. Enter the total in Line 420 on Line 601. Enter the total in Line 520 on Line 602. * * * * * erowe on DSK5CLS3C1PROD with RULES Page 3 Comparison of Good Faith Estimate (GFE) and HUD–1/1A Charges The HUD–1/1–A is a statement of actual charges and adjustments. The comparison chart on page 3 of the HUD–1 must be prepared using the exact information and amounts for the services that were purchased or provided as part of the transaction, as that information and those amounts are shown on the GFE and in the HUD–1. If a service that was listed on the GFE was not obtained in connection with the transaction, pages 1 and 2 of the HUD–1 should not include any VerDate Mar<15>2010 15:08 Jul 08, 2011 Jkt 223001 * * * * * Dated: July 1, 2011. Robert C. Ryan, Acting Assistant Secretary for HousingFederal Housing Commissioner. [FR Doc. 2011–17230 Filed 7–8–11; 8:45 am] BILLING CODE 4210–67–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2011–0626] RIN 1625–AA09 Drawbridge Operation Regulation; Old River Channel of the Cuyahoga River, Cleveland, OH Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: The Commander, Ninth Coast Guard District, has issued a temporary deviation from the regulations governing the operation of the Willow Street Bridge at mile 1.02 across the Old River Channel of the Cuyahoga River in Cleveland, OH. The deviation is necessary to facilitate replacement of machinery that operates the bridge. This deviation allows the bridge to remain secured to masted navigation during the maintenance period. DATES: This temporary deviation is effective from January 31, 2012 through February 21, 2012. ADDRESSES: Documents mentioned in this preamble as being available in the docket, are part of docket USCG–2011– 0626 and are available online by going to https://www.regulations.gov, inserting USCG–2011–0626 in the ‘‘Keyword’’ box, and then clicking ‘‘Search.’’ They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or e-mail Mr. Lee D. SUMMARY: PO 00000 Frm 00024 Fmt 4700 Sfmt 9990 Soule, Bridge Management Specialist, U.S. Coast Guard; telephone 216–902– 6085, e-mail lee.d.soule@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. The Willow Street Bridge, at mile 1.02 across the Old River Channel of the Cuyahoga River, at Cleveland, Ohio, has a vertical clearance in the closed position of 12 feet and a horizontal clearance of 150 feet. There are no specific requirements for this bridge in Subpart B of 33 CFR 117 and is therefore required to open on signal at all times. The bridge owner requested a temporary deviation from the regulations to facilitate the replacement of the bridge operating machinery. The work requires the bridge to be kept in the closed position. The Old River Channel of the Cuyahoga River serves a tug company, salt mine, road improvement, and construction facilities that import or export materials and services. One yacht club and two marinas are also located on this waterway. The Coast Guard coordinated with the bridge owner and the facilities on and adjacent to the waterway to establish the dates of this temporary deviation to be the least disruptive to their operations. Under this temporary deviation, the Willow Street Bridge will remain secured to masted navigation and will not be required to open for any vessel from January 31, 2012 through February 21, 2012. Vessels able to pass under the bridge without an opening may do so at anytime. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: June 28, 2011. Scot M. Striffler, Bridge Program Manager, Ninth Coast Guard District. [FR Doc. 2011–17257 Filed 7–8–11; 8:45 am] BILLING CODE 9110–04–P E:\FR\FM\11JYR1.SGM 11JYR1

Agencies

[Federal Register Volume 76, Number 132 (Monday, July 11, 2011)]
[Rules and Regulations]
[Page 40616]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-17257]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2011-0626]
RIN 1625-AA09


Drawbridge Operation Regulation; Old River Channel of the 
Cuyahoga River, Cleveland, OH

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Ninth Coast Guard District, has issued a 
temporary deviation from the regulations governing the operation of the 
Willow Street Bridge at mile 1.02 across the Old River Channel of the 
Cuyahoga River in Cleveland, OH. The deviation is necessary to 
facilitate replacement of machinery that operates the bridge. This 
deviation allows the bridge to remain secured to masted navigation 
during the maintenance period.

DATES: This temporary deviation is effective from January 31, 2012 
through February 21, 2012.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket, are part of docket USCG-2011-0626 and are available online 
by going to https://www.regulations.gov, inserting USCG-2011-0626 in the 
``Keyword'' box, and then clicking ``Search.'' They are also available 
for inspection or copying at the Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or e-mail Mr. Lee D. Soule, Bridge Management 
Specialist, U.S. Coast Guard; telephone 216-902-6085, e-mail 
lee.d.soule@uscg.mil. If you have questions on viewing the docket, call 
Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-
9826.

SUPPLEMENTARY INFORMATION: The Willow Street Bridge, at mile 1.02 
across the Old River Channel of the Cuyahoga River, at Cleveland, Ohio, 
has a vertical clearance in the closed position of 12 feet and a 
horizontal clearance of 150 feet. There are no specific requirements 
for this bridge in Subpart B of 33 CFR 117 and is therefore required to 
open on signal at all times.
    The bridge owner requested a temporary deviation from the 
regulations to facilitate the replacement of the bridge operating 
machinery. The work requires the bridge to be kept in the closed 
position.
    The Old River Channel of the Cuyahoga River serves a tug company, 
salt mine, road improvement, and construction facilities that import or 
export materials and services. One yacht club and two marinas are also 
located on this waterway. The Coast Guard coordinated with the bridge 
owner and the facilities on and adjacent to the waterway to establish 
the dates of this temporary deviation to be the least disruptive to 
their operations.
    Under this temporary deviation, the Willow Street Bridge will 
remain secured to masted navigation and will not be required to open 
for any vessel from January 31, 2012 through February 21, 2012. Vessels 
able to pass under the bridge without an opening may do so at anytime.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: June 28, 2011.
Scot M. Striffler,
Bridge Program Manager, Ninth Coast Guard District.
[FR Doc. 2011-17257 Filed 7-8-11; 8:45 am]