Environmental Impacts Statements; Notice of Availability, 40354-40355 [2011-17199]
Download as PDF
40354
Federal Register / Vol. 76, No. 131 / Friday, July 8, 2011 / Notices
Issued in Washington, DC, on June 27,
2011.
Thomas P. D’Agostino,
Administrator, National Nuclear Security
Administration.
[FR Doc. 2011–17161 Filed 7–7–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
[DOE/EIS–0462]
Notice of Cancellation of
Environmental Impact Statement for
the Proposed Crowned Ridge Wind
Energy Center Project, Codington and
Grant Counties, SD
Western Area Power
Administration, DOE.
ACTION: Notice of Cancellation of
Environmental Impact Statement.
AGENCY:
The U.S. Department of
Energy (DOE), Western Area Power
Administration (Western) is issuing this
notice to advise the public that it is
cancelling the preparation of an
environmental impact statement (EIS)
under the National Environmental
Policy Act (NEPA) on an
interconnection request by NextEra
Energy Resources (NextEra).
DATES: This cancellation is effective on
July 8, 2011.
FOR FURTHER INFORMATION CONTACT: For
additional information on the
cancellation of this EIS process, contact
Matt Marsh, NEPA Document Manager,
Upper Great Plains Regional Office,
Western Area Power Administration,
P.O. Box 35800, Billings, MT 59107–
5800, e-mail MMarsh@wapa.gov,
telephone (800) 358–3415. For general
information on DOE’s NEPA review
process, contact Carol M. Borgstrom,
Director of NEPA Policy and
Compliance, GC–54, Department of
Energy, 1000 Independence Avenue
SW., Washington, DC 20585–0119,
telephone (202) 586–4600 or (800) 472–
2756, facsimile (202) 586–7031.
SUPPLEMENTARY INFORMATION: NextEra
proposed to design, construct, operate,
and maintain a 150-megawatt Crowned
Ridge Wind Energy Center Project
(Project) in Codington and Grant
counties, South Dakota, and
interconnect that Project with Western’s
transmission system. NextEra’s
interconnection request caused Western
to initiate a NEPA review of its action
to allow the interconnection. Western
published a Notice of Intent for the EIS
in the Federal Register on November 30,
2010 (75 FR 74040), and started the EIS
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:52 Jul 07, 2011
Jkt 223001
process. A public scoping meeting was
held subsequent to the Notice of Intent,
but a Draft EIS was not produced
because NextEra decided to suspend
further action on its proposed Project.
NextEra notified Western of the
decision, and Western is now
terminating the NEPA review process on
its interconnection decision and
NextEra’s proposed Project. NextEra
could decide to reinitiate the proposed
Project at some future date. In that event
Western would issue a new Notice of
Intent, and would start an entirely new
NEPA process.
The Assistant Secretary, Environment,
Safety and Health granted approval
authority to Western’s Administrator for
EISs related to integrating major new
sources of generation in a October 4,
1999, memorandum. Under the
authority granted by that memorandum,
I have terminated the NEPA process for
NextEra’s proposed Crowned Ridge
Wind Energy Center Project with the
publication of this notice.
Dated: June 29, 2011.
Timothy J. Meeks,
Administrator.
[FR Doc. 2011–17157 Filed 7–7–11; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8997–8]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 06/27/2011 Through 07/01/2011
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110210, Final EIS, USFS, NM,
McKinley County Easement—Forest
Roads 191 and 191D, Implementation,
Cibola National Forest, McKinley
County, NM, Review Period Ends:
08/08/2011, Contact: Keith Baker
505–346–3820.
EIS No. 20110211, Draft EIS, USFS, AK,
Ketchikan—Misty Fiords Outfitter
and Guide Management Plan,
Authorizes Outfitter and Guide
Operations through the Issuance of
Special-Use-Permits, Tongass
National Forest, Ketchikan-Misty
Ranger District, Ketchikan, AK,
Comment Period Ends: 08/22/2011,
Contact: Susan Jennings 907–723–
0477.
EIS No. 20110212, Draft EIS, BLM, CA,
Ocotillo Express Wind Energy Project,
Proposing to Develop a 465–Megawatt
Wind Energy Facility,
Implementation, Imperial County, CA,
Comment Period Ends: 10/05/2011,
Contact: Cedric Perry 951–697–5388.
EIS No. 20110213, Final EIS, FAA, RI,
Theodore Francis Green Airport
Improvement Program, Proposing
Improvements to Enhance Safety and
the Efficiency of the Airport and the
New England Regional Airport
System, City of Warwick, Kent
County, RI, Review Period Ends: 08/
08/2011, Contact: Richard Doucette
781–238–7613.
EIS No. 20110214, Draft Supplement,
USFS, ND, North Billings County
Allotment Management Plan
Revisions, Updated Information,
Proposes to Continue to Permit
Livestock Grazing on 43 Allotments,
Medora Ranger District, Dakota Prairie
Grasslands, Billings County, ND,
Comment Period Ends: 08/22/2011,
Contact: Nickole Dahl 701–227–7800.
EIS No. 20110215, Final EIS, FHWA, WI,
Wisconsin Highway Project, Mobility
Motorized and Nonmotorized Travel
Enhancements, Updated Information
on New Alternatives, and Evaluates a
Staged Improvement, US18/151
(Verona Road) and the US 12/14
(Beltine) Corridors, Dane County, WI,
Review Period Ends: 08/08/2011,
Contact: George R. Poirier 608–829–
7500.
EIS No. 20110216, Final EIS, FHWA,
UT, Hyde Park/North Logan Corridor
Project, Proposed 200 East
Transportation Corridor between
North Logan City and Hyde Park,
Funding, Right-of-Way Acquisitions
and US Army COE Section 404
Permit, Cache County, UT, Review
Period Ends: 08/08/2011, Contact:
Paul C. Ziman 801–955–3525.
E:\FR\FM\08JYN1.SGM
08JYN1
40355
Federal Register / Vol. 76, No. 131 / Friday, July 8, 2011 / Notices
Amended Notices
The Panel meeting will be
held at the EPA Region 5 Offices, The
Lake Michigan Room in the Ralph H.
Metcalfe Federal Building, 77 West
Jackson Boulevard, Chicago, IL 60604.
FOR FURTHER INFORMATION CONTACT: Any
member of the public wishing further
information regarding this meeting may
contact Mr. Thomas Carpenter,
Designated Federal Officer (DFO), SAB
Staff Office, by telephone/voice mail at
(202) 564–4885; by fax at (202) 565–
2098 or via e-mail at
carpenter.thomas@epa.gov. General
information concerning the EPA Science
Advisory Board can be found at the EPA
SAB Web site at https://www.epa.gov/
sab.
SUPPLEMENTARY INFORMATION:
Background: The SAB Staff Office
requested public nominations of experts
to serve on a review panel to advise the
Agency on scientific and technical
issues related to the GRLI Action Plan
(75 FR 185 58383–58385). EPA
subsequently announced on June 15,
2011 a public meeting of the panel for
July 12 and 13, 2011. That notice
provided instructions to submit written
comments or provide oral statements
and accommodations for individuals
with disabilities (76 FR 115 34977–
34978). This notice announces a change
in the location of the public meeting.
ADDRESSES:
EIS No. 20110149, Draft EIS, USFS, MT,
Troy Mine Revised Reclamation Plan,
Proposed Revision is to Return Lands
Disturbed by Mining to a Condition
Appropriate for Subsequent Use of the
Area, Kootenai National Forest, MT,
Comment Period Ends: 08/05/2011,
Contact: Bobbie Loaklen 406–283–
7681.
Revision to FR Notice Published 05/
20/2011: Extending Comment Period
from 07/05/2011 to 08/05/2011.
Dated: July 5, 2011.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–17199 Filed 7–7–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9431–7]
Science Advisory Board Staff Office;
Notification of a Public Meeting of the
Science Advisory Board Panel for the
Review of Great Lakes Restoration
Initiative Action Plan
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA or Agency) Science
Advisory Board (SAB) Staff Office
announces a change in meeting location
for a public face-to-face meeting of the
SAB panel to review the interagency
Great Lakes Restoration Initiative (GLRI)
Action Plan (FY 2010–FY 2014) that
describes restoration priorities, goals,
objectives, measurable ecological
targets, and specific actions for the Great
Lakes.
DATES: The meeting will be held on July
12, 2011 from 9 a.m. to 5:30 p.m. and
July 13, 2011 from 8 a.m. to 5 p.m.
(Central Time).
SUMMARY:
Dated: July 1, 2011.
Vanessa T. Vu,
Director, EPA Science Advisory Staff Office.
[FR Doc. 2011–17258 Filed 7–7–11; 8:45 am]
BILLING CODE 6560–50–P
Notice.
EPA Regions 1, 2, 3, 5, 6, 7,
8, 9, and 10 are modifying the 2008
National Pollutant Discharge
Elimination System (NPDES) general
permits for stormwater discharges
associated with construction activity in
order to extend until February 15, 2012
the expiration date of the permit.
Hereinafter, these NPDES general
permits will be referred to as ‘‘permit’’
or ‘‘2008 construction general permit’’
or ‘‘2008 CGP.’’ This modification will
extend the three-year permit so that it
expires on February 15, 2012 instead of
June 30, 2011. Prior to this extension,
EPA modified the 2008 CGP in January
2010 to extend the permit by one year,
thus making it a three-year permit. By
Federal law, no NPDES permit may be
issued for a period that exceeds five
years.
SUMMARY:
EPA is finalizing a modification
to its 2008 CGP that extends the permit
until February 15, 2012. The 2008 CGP
will now expire on midnight, February
15, 2012, instead of June 30, 2011.
DATES:
Greg
Schaner, Water Permits Division, Office
of Wastewater Management (Mail Code:
4203M), Environmental Protection
Agency, 1200 Pennsylvania Avenue,
NW., EPA East, Washington, DC 20460;
telephone number: (202) 564–0721; fax
number: (202) 564–6431; e-mail address:
schaner.greg@epa.gov.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9431–1; EPA–HQ–OW–2008–0238]
Modification to 2008 National Pollutant
Discharge Elimination System
(NPDES) General Permit for
Stormwater Discharges Associated
With Construction Activities
Environmental Protection
Agency (EPA).
AGENCY:
Category
I. General Information
A. Does this action apply to me?
If a discharger chooses to apply for
coverage under the 2008 CGP, the
permit provides specific requirements
for preventing contamination of
waterbodies from stormwater discharges
from the following construction
activities:
North American
Industry Classification System
(NAICS) Code
Examples of affected entities
Industry ....................................................
mstockstill on DSK4VPTVN1PROD with NOTICES
ACTION:
Construction site operators disturbing 1 or more acres of land, or less than 1 acre but part of a larger
common plan of development or sale if the larger common plan will ultimately disturb 1 acre or more,
and performing the following activities:
Building, Developing and General Contracting .......................................................
Heavy Construction .................................................................................................
EPA does not intend the preceding
table to be exhaustive, but provides it as
VerDate Mar<15>2010
17:52 Jul 07, 2011
Jkt 223001
a guide for readers regarding entities
likely to be regulated by this action.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
This table lists the types of activities
that EPA is now aware of that could
E:\FR\FM\08JYN1.SGM
08JYN1
236
237
Agencies
[Federal Register Volume 76, Number 131 (Friday, July 8, 2011)]
[Notices]
[Pages 40354-40355]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-17199]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8997-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 06/27/2011 Through 07/01/2011
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA met this mandate by publishing weekly notices
of availability of EPA comments, which includes a brief summary of
EPA's comment letters, in the Federal Register. Since February 2008,
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20110210, Final EIS, USFS, NM, McKinley County Easement--Forest
Roads 191 and 191D, Implementation, Cibola National Forest, McKinley
County, NM, Review Period Ends: 08/08/2011, Contact: Keith Baker 505-
346-3820.
EIS No. 20110211, Draft EIS, USFS, AK, Ketchikan--Misty Fiords
Outfitter and Guide Management Plan, Authorizes Outfitter and Guide
Operations through the Issuance of Special-Use-Permits, Tongass
National Forest, Ketchikan-Misty Ranger District, Ketchikan, AK,
Comment Period Ends: 08/22/2011, Contact: Susan Jennings 907-723-0477.
EIS No. 20110212, Draft EIS, BLM, CA, Ocotillo Express Wind Energy
Project, Proposing to Develop a 465-Megawatt Wind Energy Facility,
Implementation, Imperial County, CA, Comment Period Ends: 10/05/2011,
Contact: Cedric Perry 951-697-5388.
EIS No. 20110213, Final EIS, FAA, RI, Theodore Francis Green Airport
Improvement Program, Proposing Improvements to Enhance Safety and the
Efficiency of the Airport and the New England Regional Airport System,
City of Warwick, Kent County, RI, Review Period Ends: 08/08/2011,
Contact: Richard Doucette 781-238-7613.
EIS No. 20110214, Draft Supplement, USFS, ND, North Billings County
Allotment Management Plan Revisions, Updated Information, Proposes to
Continue to Permit Livestock Grazing on 43 Allotments, Medora Ranger
District, Dakota Prairie Grasslands, Billings County, ND, Comment
Period Ends: 08/22/2011, Contact: Nickole Dahl 701-227-7800.
EIS No. 20110215, Final EIS, FHWA, WI, Wisconsin Highway Project,
Mobility Motorized and Nonmotorized Travel Enhancements, Updated
Information on New Alternatives, and Evaluates a Staged Improvement,
US18/151 (Verona Road) and the US 12/14 (Beltine) Corridors, Dane
County, WI, Review Period Ends: 08/08/2011, Contact: George R. Poirier
608-829-7500.
EIS No. 20110216, Final EIS, FHWA, UT, Hyde Park/North Logan Corridor
Project, Proposed 200 East Transportation Corridor between North Logan
City and Hyde Park, Funding, Right-of-Way Acquisitions and US Army COE
Section 404 Permit, Cache County, UT, Review Period Ends: 08/08/2011,
Contact: Paul C. Ziman 801-955-3525.
[[Page 40355]]
Amended Notices
EIS No. 20110149, Draft EIS, USFS, MT, Troy Mine Revised Reclamation
Plan, Proposed Revision is to Return Lands Disturbed by Mining to a
Condition Appropriate for Subsequent Use of the Area, Kootenai National
Forest, MT, Comment Period Ends: 08/05/2011, Contact: Bobbie Loaklen
406-283-7681.
Revision to FR Notice Published 05/20/2011: Extending Comment
Period from 07/05/2011 to 08/05/2011.
Dated: July 5, 2011.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-17199 Filed 7-7-11; 8:45 am]