Revised Public Utility Filing; Requirements for Electric Quarterly Reports; Notice of Electric Quarterly Reports Users Group Meeting, 38383 [2011-16471]

Download as PDF Federal Register / Vol. 76, No. 126 / Thursday, June 30, 2011 / Notices or 202–502–8659 (TTY), or send a fax to 202–208–2106 with the required accommodations. [Docket No.: ER02–2001–000] srobinson on DSK4SPTVN1PROD with NOTICES Revised Public Utility Filing; Requirements for Electric Quarterly Reports; Notice of Electric Quarterly Reports Users Group Meeting This notice announces a meeting of the Electric Quarterly Reports (EQR) Users Group to be held Wednesday, July 13, 2011, in the Commission Meeting Room at 888 First Street, NE., Washington, DC and via teleconference. The meeting will run from 9 a.m. to 12 p.m. (EDT). During the meeting, Commission staff and EQR users will discuss staff plans for the EQR redesign with software implementation now adopting an XML technical approach. A tentative agenda for the conference is attached. All interested persons are invited to attend or call in for the meeting. Those interested in attending either in person or by phone hook-up are asked to register no later than July 6, 2011, on the FERC Web site at https://www.ferc.gov/ whats-new/registration/eqr-brief-07-1311-form.asp. There is no registration fee. Information for the meeting will be sent to registered attendees. Registration will help staff to determine the proper accommodations needed for this meeting. Documents to be discussed at the meeting will be posted on the EQR Users Group and Workshops page on FERC.gov at https://www.ferc.gov/docsfiling/eqr/groups-workshops.asp. Interested persons wishing to file comments may do so under the abovecaptioned Docket Number. Those filings will be available at the Commission or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance accessing document on eLibrary, contact FERC Online Support at FERCOnlineSupport@ferc.gov or via phone at (866) 208–3676 (toll-free). For TTY, contact (202) 502–8659. For additional information about the meeting, please contact Mark Blazejowski of FERC’s Office of Enforcement at (202) 502–6055 or by email at eqr@ferc.gov. FERC conferences and meetings are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) 16:24 Jun 29, 2011 Jkt 223001 [FR Doc. 2011–16473 Filed 6–29–11; 8:45 am] Attachment: Meeting Agenda Federal Energy Regulatory Commission Dated: June 23, 2011. Kimberly D. Bose, Secretary. Dated: June 24, 2011. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY VerDate Mar<15>2010 38383 DEPARTMENT OF ENERGY Tentative Agenda EQR Users Group Meeting; Commission Meeting Room, Wednesday, July 13, 2011 Federal Energy Regulatory Commission 9–9:15 a.m. Welcome, Introductions, Logistics. 9:15–10:15 a.m. Discussion of Reasons for EQR Redesign. • Performance and Scalability. • Modernization and Support. • Stability. • Links to Other FERC Software Systems. • Out of Software Supplying/Support Business. 10:15–10:30 a.m. Break. 10:30–11:30 a.m. • Xsd. • Xml. • Xsd Sample. • Xml Sample. • What is schema validation. • How is schema validation done. • EQR schema validation diagram. 11:30 a.m.–12 p.m. Review and Wrapup. [Project No. 14153–000] BILLING CODE 6717–01–P [FR Doc. 2011–16471 Filed 6–29–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2696–033] Albany Engineering Corporation, Town of Stuyvesant, NY; Notice of Site Visit and Technical Meeting On July 12, 2011, Office of Energy Projects staff will participate in a site visit and technical meeting for the Stuyvesant Falls Hydroelectric Project (FERC No. 2696–033). The purpose of the site visit and technical meeting is to discuss the parameters of an Instream Flow Incremental Methodology study to be conducted for the Stuyvesant Falls Hydroelectric Project relicensing. The site visit will begin at 9 a.m. E.S.T at Stuyvesant Falls Town Park (Sandbar Park) below Stuyvesant Falls dam. The technical meeting will begin at 12 p.m. E.S.T at the Town of Stuyvesant Town Hall, 5 Sunset Drive, Stuyvesant, NY 12173. Interested parties wishing to attend should contact Andy Bernick at (202) 502–8660, or via e-mail at andrew.bernick@ferc.gov. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Ballville Hydroelectric Group, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications. On April 22, 2011, Ballville Hydroelectric Group, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ballville Dam Hydroelectric Project No. 14153, to be located at the existing Ballville Dam on the Sandusky River, in the City of Freemont, in Sandusky County, Ohio. The Ballville Dam is owned by the City of Freemont. The proposed project would consist of: (1) The existing concrete gravity dam which is 34 feet in height with an overall length of 423 feet; (2) a new concrete powerhouse, 40 feet wide by 50 feet long by 30 feet deep; (3) the existing 50-foot-long by 20-foot-wide by 30-foot-deep intake structure; (4) two new 500-kilowatt Kaplan turbinegenerator units with a combined capacity of 1.0 megawatt; (5) a new 1,200-foot-long, 12.6-kilovolt transmission line; and (6) appurtenant facilities. The project would have an estimated annual generation of 5,256 megawatt-hours. Applicant Contact: Mark Chudzinski, 2502 Old Plank Road, Fremont, OH 43420, (419) 680–5858. FERC Contact: Tyrone A. Williams, (202) 502–6331. Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance date of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at E:\FR\FM\30JNN1.SGM 30JNN1

Agencies

[Federal Register Volume 76, Number 126 (Thursday, June 30, 2011)]
[Notices]
[Page 38383]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-16471]



[[Page 38383]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No.: ER02-2001-000]


Revised Public Utility Filing; Requirements for Electric 
Quarterly Reports; Notice of Electric Quarterly Reports Users Group 
Meeting

    This notice announces a meeting of the Electric Quarterly Reports 
(EQR) Users Group to be held Wednesday, July 13, 2011, in the 
Commission Meeting Room at 888 First Street, NE., Washington, DC and 
via teleconference. The meeting will run from 9 a.m. to 12 p.m. (EDT).
    During the meeting, Commission staff and EQR users will discuss 
staff plans for the EQR redesign with software implementation now 
adopting an XML technical approach. A tentative agenda for the 
conference is attached.
    All interested persons are invited to attend or call in for the 
meeting. Those interested in attending either in person or by phone 
hook-up are asked to register no later than July 6, 2011, on the FERC 
Web site at https://www.ferc.gov/whats-new/registration/eqr-brief-07-13-11-form.asp. There is no registration fee. Information for the 
meeting will be sent to registered attendees. Registration will help 
staff to determine the proper accommodations needed for this meeting.
    Documents to be discussed at the meeting will be posted on the EQR 
Users Group and Workshops page on FERC.gov at https://www.ferc.gov/docs-filing/eqr/groups-workshops.asp.
    Interested persons wishing to file comments may do so under the 
above-captioned Docket Number. Those filings will be available at the 
Commission or may be viewed on the Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance accessing document on eLibrary, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or via phone at (866) 
208-3676 (toll-free). For TTY, contact (202) 502-8659.
    For additional information about the meeting, please contact Mark 
Blazejowski of FERC's Office of Enforcement at (202) 502-6055 or by e-
mail at eqr@ferc.gov.
    FERC conferences and meetings are accessible under section 508 of 
the Rehabilitation Act of 1973. For accessibility accommodations please 
send an e-mail to accessibility@ferc.gov or call toll free (866) 208-
3372 (voice) or 202-502-8659 (TTY), or send a fax to 202-208-2106 with 
the required accommodations.

    Dated: June 24, 2011.
Kimberly D. Bose,
Secretary.

Attachment: Meeting Agenda

Tentative Agenda EQR Users Group Meeting; Commission Meeting Room, 
Wednesday, July 13, 2011

9-9:15 a.m. Welcome, Introductions, Logistics.
9:15-10:15 a.m. Discussion of Reasons for EQR Redesign.
     Performance and Scalability.
     Modernization and Support.
     Stability.
     Links to Other FERC Software Systems.
     Out of Software Supplying/Support Business.
10:15-10:30 a.m. Break.
10:30-11:30 a.m.
     Xsd.
     Xml.
     Xsd Sample.
     Xml Sample.
     What is schema validation.
     How is schema validation done.
     EQR schema validation diagram.
11:30 a.m.-12 p.m. Review and Wrap-up.

[FR Doc. 2011-16471 Filed 6-29-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.