Arizona Public Service Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, 37853-37856 [2011-16149]
Download as PDF
Federal Register / Vol. 76, No. 124 / Tuesday, June 28, 2011 / Notices
available through the NRC Public
Document Room at
pdr.resource@nrc.gov, or by calling the
PDR at 1–800–397–4209, or from the
Publicly Available Records System
(PARS) component of NRC’s document
system (ADAMS) which is accessible
from the NRC Web site at https://
www.nrc.gov/reading-rm/adams.html or
https://www.nrc.gov/reading-rm/doccollections/ACRS/.
Video teleconferencing service is
available for observing open sessions of
ACRS meetings. Those wishing to use
this service for observing ACRS
meetings should contact Mr. Theron
Brown, ACRS Audio Visual Technician
(301–415–8066), between 7:30 a.m. and
3:45 p.m. (ET), at least 10 days before
the meeting to ensure the availability of
this service.
Individuals or organizations
requesting this service will be
responsible for telephone line charges
and for providing the equipment and
facilities that they use to establish the
video teleconferencing link. The
availability of video teleconferencing
services is not guaranteed.
If attending this meeting please
contact Ms. Jessie Delgado (Telephone
301–415–7360) to be escorted to the
meeting.
Dated: June 22, 2011.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. 2011–16151 Filed 6–27–11; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Federal Register Notice
Nuclear
Regulatory Commission [NRC–2011–
0006].
DATE: Weeks of June 27, July 4, 11, 18,
25, August 1, 2011.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
AGENCY HOLDING THE MEETINGS:
mstockstill on DSK4VPTVN1PROD with NOTICES
Week of June 27, 2011
There are no meetings scheduled for
the week of June 27, 2011.
Week of July 4, 2011—Tentative
There are no meetings scheduled for
the week of July 4, 2011.
Week of July 11, 2011—Tentative
Tuesday, July 12, 2011
9:30 a.m. Briefing on the NRC Actions
for Addressing the Integrated
Regulatory Review Service (IRRS)
VerDate Mar<15>2010
16:46 Jun 27, 2011
Jkt 223001
37853
Report (Public Meeting). (Contact:
Jon Hopkins, 301–415–3027.)
This meeting will be webcast live at
the Web address—https://www.nrc.gov.
Dated: June 23, 2011.
Rochelle C. Bavol,
Policy Coordinator, Office of the Secretary.
Week of July 18, 2011—Tentative
BILLING CODE 7590–01–P
Tuesday, July 19, 2011
9:30 a.m. Briefing on the Task Force
Review of NRC Processes and
Regulations Following Events in
Japan (Public Meeting). (Contact:
Nathan Sanfilippo, 301–415–3951.)
This meeting will be webcast live at
the Web address—https://www.nrc.gov.
Week of July 25, 2011—Tentative
Thursday, July 28, 2011
9 a.m. Briefing on Severe Accidents
and Options for Proceeding with
Level 3 Probabilistic Risk
Assessment Activities (Public
Meeting). (Contact: Daniel Hudson,
301–251–7919.)
This meeting will be webcast live at
the Web address—https://www.nrc.gov.
Week of August 1, 2011—Tentative
There are no meetings scheduled for
the week of August 1, 2011.
*
*
*
*
*
* The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
call (recording)—(301) 415–1292.
Contact person for more information:
Rochelle Bavol, (301) 415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify Bill
Dosch, Chief, Work Life and Benefits
Branch, at 301–415–6200, TDD: 301–
415–2100, or by e-mail at
william.dosch@nrc.gov. Determinations
on requests for reasonable
accommodation will be made on a caseby-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555, (301–415–1969),
or send an e-mail to
darlene.wright@nrc.gov.
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
[FR Doc. 2011–16257 Filed 6–24–11; 11:15 am]
NUCLEAR REGULATORY
COMMISSION
[ Docket Nos. STN–50–528, STN–50–529,
and STN 50–530; NRC–2011–0142]
Arizona Public Service Company;
Notice of Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
Nuclear Regulatory
Commission.
ACTION: Notice of license amendment
request, opportunity to comment,
opportunity to request a hearing.
AGENCY:
Comments must be filed by July
28, 2011. A request for a hearing must
be filed by August 29, 2011.
ADDRESSES: Please include Docket ID
NRC–2011–0142 in the subject line of
your comments. Comments submitted in
writing or in electronic form will be
posted on the NRC Web site and on the
Federal rulemaking Web site https://
www.regulations.gov. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed.
The NRC requests that any party
soliciting or aggregating comments
received from other persons for
submission to the NRC inform those
persons that the NRC will not edit their
comments to remove any identifying or
contact information, and therefore, they
should not include any information in
their comments that they do not want
publicly disclosed.
You may submit comments by any
one of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for documents filed under Docket ID
NRC–2011–0142. Address questions
about the NRC dockets to Carol
Gallagher, telephone: 301–492–3668;
e-mail: Carol.Gallagher@nrc.gov.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
• Fax comments to: RADB at 301–
492–3446.
DATES:
E:\FR\FM\28JNN1.SGM
28JNN1
37854
Federal Register / Vol. 76, No. 124 / Tuesday, June 28, 2011 / Notices
FOR FURTHER INFORMATION CONTACT:
would revise the feedwater line break
with loss of offsite power and single
failure (FWLB/LOP/SF) analysis
summarized in the Palo Verde Nuclear
Generating Station Updated Safety
Analysis Report. The revision would
change the credited operator action to
20 minutes from 30 minutes to control
the pressurizer level. The revision
would also revise the rate of reactor
coolant pump (RCP) bleed-off to the
reactor drain tank from three gallons per
minute to zero.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) Involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
Lauren K. Gibson, Project Manager,
Plant Licensing Branch IV, Division of
Operating Reactor Licensing, Office of
Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555. Telephone:
301–415–1056; fax number: 301–415–
2102; e-mail: Lauren.Gibson@nrc.gov.
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of an amendment
to Renewed Facility Operating License
No. NPF–41, Renewed Facility
Operating License No. NPF–51, and
Renewed Facility Operating License No.
NPF–74 for the Palo Verde Nuclear
Generating Station, Units 1, 2, and 3,
respectively issued to Arizona Public
Service (the licensee) for operation of
the Palo Verde Nuclear Generating
Station located in Wintersburg, Arizona.
The license amendment request was
originally noticed in the Federal
Register on October 19, 2010 (75 FR
64361). This notice is being reissued in
its entirety due to a missing statement
from the description of the amendment
request. The proposed amendment
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change in the credited
operator action time to 20 minutes from 30
minutes does not change the probability of a
FWLB/LOP/SF event as the operator actions
are credited after the start of the event.
This change in operator action time does
not adversely affect accident initiators or
precursors, the ability of structures, systems,
and components (SSCs) to perform their
intended functions to mitigate the
consequences of an initiating event within
the assumed acceptance limits, or
radiological release assumptions used in
evaluating the consequences of an accident
previously evaluated.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change in the credited
operator action time to 20 minutes from 30
mstockstill on DSK4VPTVN1PROD with NOTICES
You can access publicly available
documents related to this notice using
the following methods:
• NRC’s Public Document Room
(PDR): The public may examine and
have copied, for a fee, publicly available
documents at the NRC’s PDR, Room O1–
F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland
20852.
NRC’s Agencywide Documents Access
and Management System (ADAMS):
Publicly available documents created or
received at the NRC are available online
in the NRC Library at https://
www.nrc.gov/reading-rm/adams.html.
From this page, the public can gain
entry into ADAMS, which provides text
and image files of the NRC’s public
documents. If you do not have access to
ADAMS or if there are problems in
accessing the documents located in
ADAMS, contact the NRC’s PDR
reference staff at 1–800–397–4209, 301–
415–4737, or by e-mail to
pdr.resource@nrc.gov. The application
for amendment, dated August 27, 2010,
and supplemented by letters dated
February 11 and May 25, 2011, is
available electronically under ADAMS
Accession Nos. ML102510161,
ML110550323, and ML11159A029,
respectively.
• Federal Rulemaking Web site:
Public comments and supporting
materials related to this notice can be
found at https://www.regulations.gov by
searching on Docket ID NRC–2011–
0142.
VerDate Mar<15>2010
16:46 Jun 27, 2011
Jkt 223001
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
minutes does not involve any design or
physical changes to the facility or any SSC
of that facility. The proposed change does not
create any new failure modes or adversely
affect the interaction between any structure,
system or component.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change in the credited
operator action time to 20 minutes from 30
minutes does not alter the manner in which
safety limits or limiting safety system settings
are determined. No changes to instrument/
system actuation setpoints are involved. The
safety analysis acceptance criteria are not
impacted by this change and the proposed
change will not permit plant operation in a
configuration outside the design basis. The
assumed 20 minutes for operator action is
consistent with Industry and NRC guidance.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
E:\FR\FM\28JNN1.SGM
28JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 124 / Tuesday, June 28, 2011 / Notices
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR Part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the NRC’s PDR, located at
One White Flint North, Room O1–F21,
11555 Rockville Pike (first floor),
Rockville, Maryland 20852. The NRC
regulations are accessible electronically
from the NRC Library on the NRC Web
site at https://www.nrc.gov/reading-rm/
doc-collections/cfr/. If a request for a
hearing or petition for leave to intervene
is filed by the above date, the
Commission or a presiding officer
designated by the Commission or by the
Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
VerDate Mar<15>2010
16:46 Jun 27, 2011
Jkt 223001
hearing. The requestor/petitioner must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
requestor/petitioner who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E–Filing rule
(72 FR 49139, August 28, 2007). The E–
Filing process requires participants to
submit and serve all adjudicatory
documents over the Internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E–Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
37855
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E–Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the E–
Submittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E–Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E–Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC Web site.
Further information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with the NRC
guidance available on the NRC public
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. A filing is
considered complete at the time the
documents are submitted through the
NRC’s E–Filing system. To be timely, an
electronic filing must be submitted to
the E–Filing system no later than 11:59
E:\FR\FM\28JNN1.SGM
28JNN1
mstockstill on DSK4VPTVN1PROD with NOTICES
37856
Federal Register / Vol. 76, No. 124 / Tuesday, June 28, 2011 / Notices
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the E–
Filing system time-stamps the document
and sends the submitter an e-mail notice
confirming receipt of the document. The
E–Filing system also distributes an email notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E–Filing system.
A person filing electronically using
the agency’s adjudicatory E–Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E–Filing, may require a
participant or party to use E–Filing if
the presiding officer subsequently
determines that the reason for granting
VerDate Mar<15>2010
16:46 Jun 27, 2011
Jkt 223001
the exemption from use of E–Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/EHD/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice. Nontimely filings will not be entertained
absent a determination by the presiding
officer that the petition or request
should be granted or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
For further details with respect to this
license amendment application, see the
application for amendment dated
August 27, 2010, and supplemented by
letters dated February 11 and May 25,
2011, which is available for public
inspection at the NRC’s PDR, located at
One White Flint North, Room O1–F21,
11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly
available documents created or received
at the NRC are accessible electronically
through ADAMS in the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, 301–415–4737, or
by e-mail to pdr.resource@nrc.gov.
Attorney for licensee: Michael G.
Green, Senior Regulatory Counsel,
Pinnacle West Capital Corporation, P.O.
Box 52034, Mail Station 8695, Phoenix,
Arizona 85072–2034.
Dated at Rockville, Maryland, this 21st day
of June 2011.
For the Nuclear Regulatory Commission.
Lauren K. Gibson,
Project Manager, Plant Licensing Branch IV,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2011–16149 Filed 6–27–11; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
PENSION BENEFIT GUARANTY
CORPORATION
Submission of Information Collection
for OMB Review; Comment Request;
Disclosure of Termination Information
Pension Benefit Guaranty
Corporation.
ACTION: Notice of request for OMB
approval.
AGENCY:
Pension Benefit Guaranty
Corporation (PBGC) is requesting that
the Office of Management and Budget
(OMB) approve, under the Paperwork
Reduction Act, a collection of
information on the disclosure of
termination information under its
regulations for distress terminations, 29
CFR part 4041, subpart C, and for PBGCinitiated terminations under 29 CFR
part 4042 (OMB control number 1212–
0065; expires October 31, 2011). This
notice informs the public of PBGC’s
request and solicits public comment on
the collection of information that must
be provided by plan administrators and
plan sponsors to affected parties upon
request.
DATES: Comments should be submitted
by July 28, 2011.
ADDRESSES: Comments should be sent to
the Office of Information and Regulatory
Affairs, Office of Management and
Budget, Attention: Desk Officer for
Pension Benefit Guaranty Corporation,
via electronic mail at
OIRA_DOCKET@omb.eop.gov or by fax
to (202) 395–6974.
Copies of the request (including the
collection of information) may be
obtained without charge by writing to
the Disclosure Division of the Office of
the General Counsel of PBGC at the
above address, visiting the Disclosure
Division, faxing a request to 202–326–
4042, or calling 202–326–4040 during
normal business hours. (TTY and TDD
users may call the Federal relay service
toll-free at 1–800–877–8339 and ask to
be connected to 202–326–4040). The
Disclosure Division will e-mail, fax, or
mail the request to you, as you request.
The regulations and instructions
relating to this collection of information
may be accessed on PBGC’s Web site at
https://www.pbgc.gov.
FOR FURTHER INFORMATION CONTACT: Jo
Amato Burns, Attorney, or Catherine B.
Klion, Manager, Legislative and
Regulatory Department, Pension Benefit
Guaranty Corporation, 1200 K Street,
NW., Washington, DC 20005, 202–326–
4024. (For TTY and TDD, call 800–877–
8339 and ask to be connected to 202–
326–4024.)
SUPPLEMENTARY INFORMATION: Sections
4041 and 4042 of the Employee
SUMMARY:
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 76, Number 124 (Tuesday, June 28, 2011)]
[Notices]
[Pages 37853-37856]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-16149]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[ Docket Nos. STN-50-528, STN-50-529, and STN 50-530; NRC-2011-0142]
Arizona Public Service Company; Notice of Consideration of
Issuance of Amendment to Facility Operating License, Proposed No
Significant Hazards Consideration Determination, and Opportunity for a
Hearing
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of license amendment request, opportunity to comment,
opportunity to request a hearing.
-----------------------------------------------------------------------
DATES: Comments must be filed by July 28, 2011. A request for a hearing
must be filed by August 29, 2011.
ADDRESSES: Please include Docket ID NRC-2011-0142 in the subject line
of your comments. Comments submitted in writing or in electronic form
will be posted on the NRC Web site and on the Federal rulemaking Web
site https://www.regulations.gov. Because your comments will not be
edited to remove any identifying or contact information, the NRC
cautions you against including any information in your submission that
you do not want to be publicly disclosed.
The NRC requests that any party soliciting or aggregating comments
received from other persons for submission to the NRC inform those
persons that the NRC will not edit their comments to remove any
identifying or contact information, and therefore, they should not
include any information in their comments that they do not want
publicly disclosed.
You may submit comments by any one of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0142. Address questions about the NRC dockets to Carol Gallagher,
telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
[[Page 37854]]
You can access publicly available documents related to this notice
using the following methods:
NRC's Public Document Room (PDR): The public may examine
and have copied, for a fee, publicly available documents at the NRC's
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852.
NRC's Agencywide Documents Access and Management System (ADAMS):
Publicly available documents created or received at the NRC are
available online in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, which
provides text and image files of the NRC's public documents. If you do
not have access to ADAMS or if there are problems in accessing the
documents located in ADAMS, contact the NRC's PDR reference staff at 1-
800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The
application for amendment, dated August 27, 2010, and supplemented by
letters dated February 11 and May 25, 2011, is available electronically
under ADAMS Accession Nos. ML102510161, ML110550323, and ML11159A029,
respectively.
Federal Rulemaking Web site: Public comments and
supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC-2011-0142.
FOR FURTHER INFORMATION CONTACT: Lauren K. Gibson, Project Manager,
Plant Licensing Branch IV, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555. Telephone: 301-415-1056; fax number:
301-415-2102; e-mail: Lauren.Gibson@nrc.gov.
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Renewed Facility Operating
License No. NPF-41, Renewed Facility Operating License No. NPF-51, and
Renewed Facility Operating License No. NPF-74 for the Palo Verde
Nuclear Generating Station, Units 1, 2, and 3, respectively issued to
Arizona Public Service (the licensee) for operation of the Palo Verde
Nuclear Generating Station located in Wintersburg, Arizona.
The license amendment request was originally noticed in the Federal
Register on October 19, 2010 (75 FR 64361). This notice is being
reissued in its entirety due to a missing statement from the
description of the amendment request. The proposed amendment would
revise the feedwater line break with loss of offsite power and single
failure (FWLB/LOP/SF) analysis summarized in the Palo Verde Nuclear
Generating Station Updated Safety Analysis Report. The revision would
change the credited operator action to 20 minutes from 30 minutes to
control the pressurizer level. The revision would also revise the rate
of reactor coolant pump (RCP) bleed-off to the reactor drain tank from
three gallons per minute to zero.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change in the credited operator action time to 20
minutes from 30 minutes does not change the probability of a FWLB/
LOP/SF event as the operator actions are credited after the start of
the event.
This change in operator action time does not adversely affect
accident initiators or precursors, the ability of structures,
systems, and components (SSCs) to perform their intended functions
to mitigate the consequences of an initiating event within the
assumed acceptance limits, or radiological release assumptions used
in evaluating the consequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change in the credited operator action time to 20
minutes from 30 minutes does not involve any design or physical
changes to the facility or any SSC of that facility. The proposed
change does not create any new failure modes or adversely affect the
interaction between any structure, system or component.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change in the credited operator action time to 20
minutes from 30 minutes does not alter the manner in which safety
limits or limiting safety system settings are determined. No changes
to instrument/system actuation setpoints are involved. The safety
analysis acceptance criteria are not impacted by this change and the
proposed change will not permit plant operation in a configuration
outside the design basis. The assumed 20 minutes for operator action
is consistent with Industry and NRC guidance.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
[[Page 37855]]
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the NRC's PDR, located at One White Flint North, Room O1-F21, 11555
Rockville Pike (first floor), Rockville, Maryland 20852. The NRC
regulations are accessible electronically from the NRC Library on the
NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If
a request for a hearing or petition for leave to intervene is filed by
the above date, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel, will rule on the request and/or petition;
and the Secretary or the Chief Administrative Judge of the Atomic
Safety and Licensing Board will issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A requestor/petitioner
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the Internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with the NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59
[[Page 37856]]
p.m. Eastern Time on the due date. Upon receipt of a transmission, the
E-Filing system time-stamps the document and sends the submitter an e-
mail notice confirming receipt of the document. The E-Filing system
also distributes an e-mail notice that provides access to the document
to the NRC Office of the General Counsel and any others who have
advised the Office of the Secretary that they wish to participate in
the proceeding, so that the filer need not serve the documents on those
participants separately. Therefore, applicants and other participants
(or their counsel or representative) must apply for and receive a
digital ID certificate before a hearing request/petition to intervene
is filed so that they can obtain access to the document via the E-
Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this license amendment
application, see the application for amendment dated August 27, 2010,
and supplemented by letters dated February 11 and May 25, 2011, which
is available for public inspection at the NRC's PDR, located at One
White Flint North, Room O1-F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852. Publicly available documents created or
received at the NRC are accessible electronically through ADAMS in the
NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do
not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS, should contact the NRC PDR Reference staff
by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to
pdr.resource@nrc.gov.
Attorney for licensee: Michael G. Green, Senior Regulatory Counsel,
Pinnacle West Capital Corporation, P.O. Box 52034, Mail Station 8695,
Phoenix, Arizona 85072-2034.
Dated at Rockville, Maryland, this 21st day of June 2011.
For the Nuclear Regulatory Commission.
Lauren K. Gibson,
Project Manager, Plant Licensing Branch IV, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 2011-16149 Filed 6-27-11; 8:45 am]
BILLING CODE 7590-01-P