Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices
electronic file formats are acceptable:
Microsoft Word (.doc), Corel Word
Perfect (.wpd), Adobe Acrobat (.pdf),
Rich Text Format (.rtf), plain text (.txt),
Microsoft Excel (.xls), and Microsoft
PowerPoint (.ppt). If you submit
information that you believe to be
exempt by law from public disclosure,
you must submit one complete copy, as
well as one copy from which the
information claimed to be exempt by
law from public disclosure has been
deleted. DOE is responsible for the final
determination concerning disclosure or
nondisclosure of the information and for
treating it in accordance with the DOE’s
Freedom of Information Act regulations
(10 CFR 1004.11). The DFO is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business.
Note: Delivery of the U.S. Postal Service
mail to DOE continues to be delayed by
several weeks due to security screening. The
DOE, therefore, encourages those wishing to
comment to submit comments electronically
by e-mail. If comments are submitted by
regular mail, the Department requests that
they be accompanied by a CD or diskette
containing electronic files of the submission.
Minutes: The minutes of the meeting
will be available for public review and
copying within 60 days and will be
posted on the Committee Web site at
https://www.oe.energy.gov/eac.htm or by
contacting Mr. David Meyer at (202)
586–3118 or by e-mail at:
david.meyer@hq.doe.gov .
Issued at Washington, DC, on June 20,
2011.
LaTanya R. Butler,
Acting Deputy Committee Management
Officer.
[FR Doc. 2011–15841 Filed 6–23–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–497–000]
srobinson on DSK4SPTVN1PROD with NOTICES
ANR Pipeline Company; Notice of
Application for Abandonment
Take notice that on June 9, 2011, ANR
Pipeline Company (ANR), 717 Texas
Street, Houston, Texas 77002–2761,
filed in Docket No. CP11–497–000, an
application under section 7(b) of the
Natural Gas Act (NGA) and section
157.7 and 157.18 of the Federal Energy
Regulatory Commission (Commission),
requesting authorization to abandon its
obligation to provide transportation
service through approximately 1.1 miles
of 20-inch diameter pipeline from High
Island Block A–563 to High Island Block
VerDate Mar<15>2010
19:06 Jun 23, 2011
Jkt 223001
A–582 platform (Line 787L), located in
federal waters, offshore Texas. The
application is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Rene
Staeb, Manager, Project Determinations
& Regulatory Administration, ANR
Pipeline Company, 717 Texas Street,
Houston, Texas 77002–2761, at (832)
320–5215 or fax (832) 320–6215 or
Rene_Staeb@transcanada.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\24JNN1.SGM
24JNN1
Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices
Comment Date: July 11, 2011.
Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15858 Filed 6–23–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2784–004]
srobinson on DSK4SPTVN1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, and Preliminary
Terms and Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License—Transmission Line Only.
b. Project No.: P–2784–004.
c. Date filed: April 18, 2011.
d. Applicant: Pacific Gas and Electric
Company.
e. Name of Project: Rollins
Transmission Line Project.
f. Location: The Rollins Transmission
Line Project is located in Placer and
Nevada counties, California.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Forrest
Sullivan, Senior Project Manager,
Pacific Gas and Electric Company, 5555
Florin Perkins Road, Sacramento, CA
95826. Tel: (916) 386–5580.
i. FERC Contact: Mary Greene, (202)
502–8865 or mary.greene@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions: 60 days from the
issuance date of this notice; reply
comments are due 105 days from the
issuance date of this notice.
Motions to intervene, protests,
comments, recommendations,
preliminary terms and conditions may
be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
VerDate Mar<15>2010
19:06 Jun 23, 2011
Jkt 223001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now is ready for
environmental analysis.
l. The Project is connected with the
Yuba-Bear Hydroelectric Project, FERC
project No. 2266, owned and operated
by the Nevada Irrigation District (NID).
Project facilities include a 3,851-ft long,
three-phase, 60-kilovolt (kV), wood-pole
transmission line extending from the
existing Rollins Powerhouse switchyard
to the junction with PG&E’s Drum-Gras
Valley-Weimer 60-kV transmission line.
The current project also includes a
single access road. The transmission
line right-of-way (ROW) is 40-ft in
width.
PG&E is not proposing to modify the
existing project and does not plan any
changes to the operation or maintenance
of the transmission line.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
37105
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ or
‘‘PRELIMINARY TERMS AND
CONDITIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, or terms
and conditions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Filing of recommendations, and preliminary terms and conditions.
Commission issues
EA.
Comments on EA or
EIS.
Modified terms and
conditions.
Target date
August 16, 2011.
December 14, 2011.
January 30, 2012.
March 28, 2012.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in § 5.22: (1) A copy of the
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 76, Number 122 (Friday, June 24, 2011)]
[Notices]
[Pages 37104-37105]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15858]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-497-000]
ANR Pipeline Company; Notice of Application for Abandonment
Take notice that on June 9, 2011, ANR Pipeline Company (ANR), 717
Texas Street, Houston, Texas 77002-2761, filed in Docket No. CP11-497-
000, an application under section 7(b) of the Natural Gas Act (NGA) and
section 157.7 and 157.18 of the Federal Energy Regulatory Commission
(Commission), requesting authorization to abandon its obligation to
provide transportation service through approximately 1.1 miles of 20-
inch diameter pipeline from High Island Block A-563 to High Island
Block A-582 platform (Line 787L), located in federal waters, offshore
Texas. The application is on file with the Commission and open to
public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to Rene
Staeb, Manager, Project Determinations & Regulatory Administration, ANR
Pipeline Company, 717 Texas Street, Houston, Texas 77002-2761, at (832)
320-5215 or fax (832) 320-6215 or Rene_Staeb@transcanada.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all Federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 7 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
[[Page 37105]]
Comment Date: July 11, 2011.
Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15858 Filed 6-23-11; 8:45 am]