Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Mid-South Expansion Project, 37109-37110 [2011-15857]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be filed with:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. Please include the
docket number (DI11–9–000) on any
comments, protests, and/or motions
filed.
k. Description of Project: The
proposed run-of-river Water Supply
Creek Hydroelectric Project will consist
of: (1) A proposed 8-foot-high, 60-footwide diversion structure with a concrete
core wall and grouted riprap
embankments; (2) a proposed 20-footwide, 20-foot-long concrete intake
structure, with a low-level outlet to
release flows into the bypass reach of
Water Supply Creek; (3) a 20-inch
diameter, 5,100-foot-long steel penstock,
with the final 3,300 feet of the penstock
buried with a minimum of 4-foot of
cover; (4) a 36-foot-long, 24-foot-wide,
15-foot-high powerhouse, containing a
single horizontal axis Turgo turbine and
induction generation with a rated
capacity of 400 kW; (5) a 15-foot-long
tailrace returning flows into Water
Supply Creek; (6) a proposed 4.25-milelong 12.5-kV transmission line; and (7)
appurtenant facilities.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the proposed project. The
Commission also determines whether or
not the project: (1) Would be located on
a navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
VerDate Mar<15>2010
19:06 Jun 23, 2011
Jkt 223001
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15856 Filed 6–23–11; 8:45 am]
37109
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–18–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Availability
of the Environmental Assessment for
the Proposed Mid-South Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Mid-South Expansion Project proposed
by Transcontinental Gas Pipe Line
Company, LLC (Transco) in the abovereferenced docket. Transco requests
authorization to construct and operate
five new pipeline loops,1 construct one
new compressor station, add
compression at two existing compressor
stations, and perform other
modifications to five compressor
stations. The MSEP would provide
about 451 million standard cubic feet of
natural gas per day to Transco’s existing
mainline system from the Clean Energy
LNG import terminal currently under
construction in Pascagoula, Mississippi,
with existing capacity on Transco’s
Mobile Bay Lateral, down to existing
Compressor Station 85. According to
Transco, its project would expand
delivery capacity on its existing
pipeline system to growing markets in
the east as far downstream as
Rockingham County, North Carolina.
The EA assesses the potential
environmental effects of the
construction and operation of the MidSouth Expansion Project in accordance
with the requirements of the National
Environmental Policy Act of 1969
(NEPA). The FERC staff concludes that
approval of the proposed project, with
appropriate mitigating measures, would
not constitute a major Federal action
significantly affecting the quality of the
human environment.
The proposed Mid-South Expansion
Project includes the following facilities:
• Five pipeline loops located in
Coosa and Randolph Counties,
Alabama, and Gaston, Rowan and
Davidson Counties, North Carolina;
• One new compressor station,
Station 95, to be located in Dallas
County, Alabama;
• Additional new compression at two
existing compressor stations:
Æ Station 90 in Marengo County,
Alabama; and
Æ Station 125 in Walton County,
Georgia;
BILLING CODE 6717–01–P
PO 00000
1 A pipeline loop is constructed parallel to an
existing pipeline to increase capacity.
Frm 00057
Fmt 4703
Sfmt 4703
E:\FR\FM\24JNN1.SGM
24JNN1
srobinson on DSK4SPTVN1PROD with NOTICES
37110
Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices
• Modifications at the following
existing compressor stations:
Æ Station 105 in Coosa County,
Alabama;
Æ Station 115 in Coweta County,
Georgia;
Æ Station 120 in Henry County,
Georgia;
Æ Station 140 in Spartanburg County,
South Carolina; and
Æ Station 145 in Cleveland County,
North Carolina.
The planned loops would be
constructed with 42-inch-diameter steel
pipe and would have a combined total
length of about 22.6 miles.
The EA has been placed in the public
files of the FERC and is available for
public viewing on the FERC’s Web site
at https://www.ferc.gov using the
eLibrary link. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
Federal, State, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the project
area; and parties to this proceeding.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that your
comments are properly recorded and
considered prior to a Commission
decision on the proposal, it is important
that the FERC receives your comments
in Washington, DC on or before July 20,
2011.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (CP11–18–000) with
your submission. The Commission
encourages electronic filing of
comments and has dedicated eFiling
expert staff available to assist you at
(202) 502–8258 or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
VerDate Mar<15>2010
19:06 Jun 23, 2011
Jkt 223001
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426.
Although your comments will be
considered by the Commission, simply
filing comments will not serve to make
the commenter a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).2 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC or on the FERC Web
site (https://www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number excluding the last three
digits in the Docket Number field (i.e.,
CP11–18–000). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
2 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15857 Filed 6–23–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–3808–000]
ORNI 39 LLC;Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of ORNI 39
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 11,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
E:\FR\FM\24JNN1.SGM
24JNN1
Agencies
[Federal Register Volume 76, Number 122 (Friday, June 24, 2011)]
[Notices]
[Pages 37109-37110]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15857]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-18-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Availability of the Environmental Assessment for the Proposed Mid-South
Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Mid-
South Expansion Project proposed by Transcontinental Gas Pipe Line
Company, LLC (Transco) in the above-referenced docket. Transco requests
authorization to construct and operate five new pipeline loops,\1\
construct one new compressor station, add compression at two existing
compressor stations, and perform other modifications to five compressor
stations. The MSEP would provide about 451 million standard cubic feet
of natural gas per day to Transco's existing mainline system from the
Clean Energy LNG import terminal currently under construction in
Pascagoula, Mississippi, with existing capacity on Transco's Mobile Bay
Lateral, down to existing Compressor Station 85. According to Transco,
its project would expand delivery capacity on its existing pipeline
system to growing markets in the east as far downstream as Rockingham
County, North Carolina.
---------------------------------------------------------------------------
\1\ A pipeline loop is constructed parallel to an existing
pipeline to increase capacity.
---------------------------------------------------------------------------
The EA assesses the potential environmental effects of the
construction and operation of the Mid-South Expansion Project in
accordance with the requirements of the National Environmental Policy
Act of 1969 (NEPA). The FERC staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major Federal action significantly affecting the quality
of the human environment.
The proposed Mid-South Expansion Project includes the following
facilities:
Five pipeline loops located in Coosa and Randolph
Counties, Alabama, and Gaston, Rowan and Davidson Counties, North
Carolina;
One new compressor station, Station 95, to be located in
Dallas County, Alabama;
Additional new compression at two existing compressor
stations:
[cir] Station 90 in Marengo County, Alabama; and
[cir] Station 125 in Walton County, Georgia;
[[Page 37110]]
Modifications at the following existing compressor
stations:
[cir] Station 105 in Coosa County, Alabama;
[cir] Station 115 in Coweta County, Georgia;
[cir] Station 120 in Henry County, Georgia;
[cir] Station 140 in Spartanburg County, South Carolina; and
[cir] Station 145 in Cleveland County, North Carolina.
The planned loops would be constructed with 42-inch-diameter steel
pipe and would have a combined total length of about 22.6 miles.
The EA has been placed in the public files of the FERC and is
available for public viewing on the FERC's Web site at https://www.ferc.gov using the eLibrary link. A limited number of copies of the
EA are available for distribution and public inspection at: Federal
Energy Regulatory Commission, Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
Copies of the EA have been mailed to Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes;
potentially affected landowners and other interested individuals and
groups; newspapers and libraries in the project area; and parties to
this proceeding.
Any person wishing to comment on the EA may do so. Your comments
should focus on the potential environmental effects, reasonable
alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To
ensure that your comments are properly recorded and considered prior to
a Commission decision on the proposal, it is important that the FERC
receives your comments in Washington, DC on or before July 20, 2011.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket number (CP11-18-000) with your submission. The
Commission encourages electronic filing of comments and has dedicated
eFiling expert staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you
can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Although your comments will be considered by the Commission, simply
filing comments will not serve to make the commenter a party to the
proceeding. Any person seeking to become a party to the proceeding must
file a motion to intervene pursuant to Rule 214 of the Commission's
Rules of Practice and Procedures (18 CFR 385.214).\2\ Only intervenors
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\2\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC or on the
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number excluding the last three digits in the Docket Number field
(i.e., CP11-18-000). Be sure you have selected an appropriate date
range. For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15857 Filed 6-23-11; 8:45 am]
BILLING CODE 6717-01-P