Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Mid-South Expansion Project, 37109-37110 [2011-15857]

Download as PDF srobinson on DSK4SPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI11–9–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot-high, 60-footwide diversion structure with a concrete core wall and grouted riprap embankments; (2) a proposed 20-footwide, 20-foot-long concrete intake structure, with a low-level outlet to release flows into the bypass reach of Water Supply Creek; (3) a 20-inch diameter, 5,100-foot-long steel penstock, with the final 3,300 feet of the penstock buried with a minimum of 4-foot of cover; (4) a 36-foot-long, 24-foot-wide, 15-foot-high powerhouse, containing a single horizontal axis Turgo turbine and induction generation with a rated capacity of 400 kW; (5) a 15-foot-long tailrace returning flows into Water Supply Creek; (6) a proposed 4.25-milelong 12.5-kV transmission line; and (7) appurtenant facilities. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket VerDate Mar<15>2010 19:06 Jun 23, 2011 Jkt 223001 number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: June 20, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15856 Filed 6–23–11; 8:45 am] 37109 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–18–000] Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Mid-South Expansion Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Mid-South Expansion Project proposed by Transcontinental Gas Pipe Line Company, LLC (Transco) in the abovereferenced docket. Transco requests authorization to construct and operate five new pipeline loops,1 construct one new compressor station, add compression at two existing compressor stations, and perform other modifications to five compressor stations. The MSEP would provide about 451 million standard cubic feet of natural gas per day to Transco’s existing mainline system from the Clean Energy LNG import terminal currently under construction in Pascagoula, Mississippi, with existing capacity on Transco’s Mobile Bay Lateral, down to existing Compressor Station 85. According to Transco, its project would expand delivery capacity on its existing pipeline system to growing markets in the east as far downstream as Rockingham County, North Carolina. The EA assesses the potential environmental effects of the construction and operation of the MidSouth Expansion Project in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The proposed Mid-South Expansion Project includes the following facilities: • Five pipeline loops located in Coosa and Randolph Counties, Alabama, and Gaston, Rowan and Davidson Counties, North Carolina; • One new compressor station, Station 95, to be located in Dallas County, Alabama; • Additional new compression at two existing compressor stations: Æ Station 90 in Marengo County, Alabama; and Æ Station 125 in Walton County, Georgia; BILLING CODE 6717–01–P PO 00000 1 A pipeline loop is constructed parallel to an existing pipeline to increase capacity. Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\24JNN1.SGM 24JNN1 srobinson on DSK4SPTVN1PROD with NOTICES 37110 Federal Register / Vol. 76, No. 122 / Friday, June 24, 2011 / Notices • Modifications at the following existing compressor stations: Æ Station 105 in Coosa County, Alabama; Æ Station 115 in Coweta County, Georgia; Æ Station 120 in Henry County, Georgia; Æ Station 140 in Spartanburg County, South Carolina; and Æ Station 145 in Cleveland County, North Carolina. The planned loops would be constructed with 42-inch-diameter steel pipe and would have a combined total length of about 22.6 miles. The EA has been placed in the public files of the FERC and is available for public viewing on the FERC’s Web site at https://www.ferc.gov using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are properly recorded and considered prior to a Commission decision on the proposal, it is important that the FERC receives your comments in Washington, DC on or before July 20, 2011. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number (CP11–18–000) with your submission. The Commission encourages electronic filing of comments and has dedicated eFiling expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project; VerDate Mar<15>2010 19:06 Jun 23, 2011 Jkt 223001 (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Although your comments will be considered by the Commission, simply filing comments will not serve to make the commenter a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214).2 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP11–18–000). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific 2 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Dated: June 20, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15857 Filed 6–23–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11–3808–000] ORNI 39 LLC;Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of ORNI 39 LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 11, 2011. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, E:\FR\FM\24JNN1.SGM 24JNN1

Agencies

[Federal Register Volume 76, Number 122 (Friday, June 24, 2011)]
[Notices]
[Pages 37109-37110]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15857]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-18-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Availability of the Environmental Assessment for the Proposed Mid-South 
Expansion Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the Mid-
South Expansion Project proposed by Transcontinental Gas Pipe Line 
Company, LLC (Transco) in the above-referenced docket. Transco requests 
authorization to construct and operate five new pipeline loops,\1\ 
construct one new compressor station, add compression at two existing 
compressor stations, and perform other modifications to five compressor 
stations. The MSEP would provide about 451 million standard cubic feet 
of natural gas per day to Transco's existing mainline system from the 
Clean Energy LNG import terminal currently under construction in 
Pascagoula, Mississippi, with existing capacity on Transco's Mobile Bay 
Lateral, down to existing Compressor Station 85. According to Transco, 
its project would expand delivery capacity on its existing pipeline 
system to growing markets in the east as far downstream as Rockingham 
County, North Carolina.
---------------------------------------------------------------------------

    \1\ A pipeline loop is constructed parallel to an existing 
pipeline to increase capacity.
---------------------------------------------------------------------------

    The EA assesses the potential environmental effects of the 
construction and operation of the Mid-South Expansion Project in 
accordance with the requirements of the National Environmental Policy 
Act of 1969 (NEPA). The FERC staff concludes that approval of the 
proposed project, with appropriate mitigating measures, would not 
constitute a major Federal action significantly affecting the quality 
of the human environment.
    The proposed Mid-South Expansion Project includes the following 
facilities:
     Five pipeline loops located in Coosa and Randolph 
Counties, Alabama, and Gaston, Rowan and Davidson Counties, North 
Carolina;
     One new compressor station, Station 95, to be located in 
Dallas County, Alabama;
     Additional new compression at two existing compressor 
stations:
    [cir] Station 90 in Marengo County, Alabama; and
    [cir] Station 125 in Walton County, Georgia;

[[Page 37110]]

     Modifications at the following existing compressor 
stations:
    [cir] Station 105 in Coosa County, Alabama;
    [cir] Station 115 in Coweta County, Georgia;
    [cir] Station 120 in Henry County, Georgia;
    [cir] Station 140 in Spartanburg County, South Carolina; and
    [cir] Station 145 in Cleveland County, North Carolina.
    The planned loops would be constructed with 42-inch-diameter steel 
pipe and would have a combined total length of about 22.6 miles.
    The EA has been placed in the public files of the FERC and is 
available for public viewing on the FERC's Web site at https://www.ferc.gov using the eLibrary link. A limited number of copies of the 
EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street, 
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    Copies of the EA have been mailed to Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; newspapers and libraries in the project area; and parties to 
this proceeding.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that your comments are properly recorded and considered prior to 
a Commission decision on the proposal, it is important that the FERC 
receives your comments in Washington, DC on or before July 20, 2011.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number (CP11-18-000) with your submission. The 
Commission encourages electronic filing of comments and has dedicated 
eFiling expert staff available to assist you at (202) 502-8258 or 
efiling@ferc.gov.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an 
easy method for interested persons to submit brief, text-only comments 
on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you 
can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
    Although your comments will be considered by the Commission, simply 
filing comments will not serve to make the commenter a party to the 
proceeding. Any person seeking to become a party to the proceeding must 
file a motion to intervene pursuant to Rule 214 of the Commission's 
Rules of Practice and Procedures (18 CFR 385.214).\2\ Only intervenors 
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------

    \2\ Interventions may also be filed electronically via the 
Internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC or on the 
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number excluding the last three digits in the Docket Number field 
(i.e., CP11-18-000). Be sure you have selected an appropriate date 
range. For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.

    Dated: June 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15857 Filed 6-23-11; 8:45 am]
BILLING CODE 6717-01-P