Kodiak Electric Association, Inc.; Notice of Application Accepted for Filing, Ready for Environmental Analysis, Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions, 36911-36912 [2011-15697]

Download as PDF Federal Register / Vol. 76, No. 121 / Thursday, June 23, 2011 / Notices LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, and TC Ravenswood, LLC (collectively Complainants) filed an amendment to its June 3, 2011, Complaint against New York Independent System Operator, Inc. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on July 5, 2011. Dated: June 17, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–15716 Filed 6–22–11; 8:45 am] erowe on DSK5CLS3C1PROD with NOTICES BILLING CODE 6717–01–P VerDate Mar<15>2010 15:02 Jun 22, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2743–071] Kodiak Electric Association, Inc.; Notice of Application Accepted for Filing, Ready for Environmental Analysis, Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of License. b. Project No.: 2743–071. c. Date Filed: May 20, 2011. d. Applicant: Kodiak Electric Association, Inc. e. Name of Project: Terror Lake Project. f. Location: The project is located on the Terror and Kizhuyak Rivers in Kodiak Island Borough, Alaska. The project occupies federal lands managed by the U.S. Fish and Wildlife Service within the Kodiak National Wildlife Refuge and on lands managed by the U.S. Coast Guard. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Darron Scott, President/CEO, Kodiak Electric Association, Inc. P.O. Box 787, Kodiak, AK 99615–0787, (907) 486–7707. i. FERC Contact: Mr. Steven Sachs (202) 502–8666 or Steven.Sachs@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, terms and conditions, and fishway prescriptions is 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 36911 name and contact information at the end of your comments. Please include the project number (P– 2743–071) on any comments, motions, recommendations, or terms and conditions filed. k. Description of Request: The applicant proposes to install a third turbine-generator unit at the project. The new unit would have an installed capacity of 11.25 megawatts (MW) and be contained entirely within the project’s powerhouse. The proposal would increase the hydraulic capacity of the project from 300 to 435 cubic feet per second and the authorized installed capacity from 22.5 to 33.75 MW. Because the project was constructed with provisions for the third unit, no significant modifications to conduits, structures, or electrical equipment would be required. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) Bear in all capital letters the title E:\FR\FM\23JNN1.SGM 23JNN1 36912 Federal Register / Vol. 76, No. 121 / Thursday, June 23, 2011 / Notices ‘‘COMMENTS’’, ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘TERMS AND CONDITIONS’’ or ‘‘FISHWAY PRESCRIPTIONS’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. p. As provided for in 18 CFR 4.34(b)(5)(i), a license applicant must file, no later than 60 days following the date of issuance of this notice of acceptance and ready for environmental analysis: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: June 16, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15697 Filed 6–22–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY erowe on DSK5CLS3C1PROD with NOTICES Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER09–1400–004. Applicants: Milford Wind Corridor Phase I, LLC. VerDate Mar<15>2010 15:02 Jun 22, 2011 Jkt 223001 Description: Milford Wind Corridor Phase I, LLC submits Change in Status Notice. Filed Date: 05/13/2011. Accession Number: 20110513–5175. Comment Date: 5 p.m. Eastern Time on Friday, July 08, 2011. Docket Numbers: ER10–2651–001. Applicants: Lockhart Power Company. Description: Lockhart Power Company submits its Triennial Market Power Analysis. Filed Date: 06/16/2011. Accession Number: 20110616–5131. Comment Date: 5 p.m. Eastern Time on Monday, August 15, 2011. Docket Numbers: ER11–2544–002. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc. submits tariff filing per 35: NYISO Compliance Filing to Revise Specified Effective Date to be effective 6/30/2011. Filed Date: 06/16/2011. Accession Number: 20110616–5088. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3460–001. Applicants: Bayonne Energy Center, LLC. Description: Bayonne Energy Center, LLC submits tariff filing per 35.17(b): Amendment to MBR Application to be effective 4/28/2011. Filed Date: 06/17/2011. Accession Number: 20110617–5097. Comment Date: 5 p.m. Eastern Time on Monday, June 27, 2011. Docket Numbers: ER11–3810–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii: Amendment to Attachment V of the Tariff to be effective 8/16/2011. Filed Date: 06/16/2011. Accession Number: 20110616–5059. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3811–000. Applicants: Public Service Company of Colorado. Description: Public Service Company of Colorado submits tariff filing per 35: 20110616_Compliance Filing Redesignating Rate Schedule No. 6 to be effective N/A. Filed Date: 06/16/2011. Accession Number: 20110616–5068. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3812–000. Applicants: LSP Energy Limited Partnership. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 Description: LSP Energy Limited Partnership submits tariff filing per 35.1: Baseline Filing of Market-Based Rate Tariff to be effective 6/16/2011. Filed Date: 06/16/2011. Accession Number: 20110616–5072. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3813–000. Applicants: Allegheny Energy Supply Company, LLC. Description: Allegheny Energy Supply Company, LLC submits tariff filing per 35: AE Supply Compliance ER11–2942 to be effective 6/1/2011. Filed Date: 06/16/2011. Accession Number: 20110616–5089. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3814–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 205 Filing of NYISO PJM JOA Schedules A and B to be effective 8/16/2011. Filed Date: 06/16/2011. Accession Number: 20110616–5110. Comment Date: 5 p.m. Eastern Time on Thursday, July 07, 2011. Docket Numbers: ER11–3815–000. Applicants: FirstEnergy Solutions Corp. Description: FirstEnergy Solutions Corp. submits tariff filing per 35.15: Cancellation of Tariff for Sales to be effective 6/18/2011. Filed Date: 06/17/2011. Accession Number: 20110617–5039. Comment Date: 5 p.m. Eastern Time on Friday, July 08, 2011. Docket Numbers: ER11–3816–000. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.13(a)(2)(iii: Nevada Power Transmission Facilities Agreement to be effective 6/17/2011. Filed Date: 06/17/2011. Accession Number: 20110617–5083. Comment Date: 5 p.m. Eastern Time on Friday, July 08, 2011. Docket Numbers: ER11–3818–000. Applicants: LSP Energy Limited Partnership. Description: LSP Energy Limited Partnership submits tariff filing per 35.13(a)(2)(iii: Tariff Amendment to be effective 8/16/2011. Filed Date: 06/17/2011. Accession Number: 20110617–5100. Comment Date: 5 p.m. Eastern Time on Friday, July 08, 2011. Docket Numbers: ER11–3819–000. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits tariff filing per 35.13(a)(2)(iii: E:\FR\FM\23JNN1.SGM 23JNN1

Agencies

[Federal Register Volume 76, Number 121 (Thursday, June 23, 2011)]
[Notices]
[Pages 36911-36912]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15697]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2743-071]


Kodiak Electric Association, Inc.; Notice of Application Accepted 
for Filing, Ready for Environmental Analysis, Soliciting Comments, 
Motions To Intervene, Protests, Recommendations, Terms and Conditions, 
and Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of License.
    b. Project No.: 2743-071.
    c. Date Filed: May 20, 2011.
    d. Applicant: Kodiak Electric Association, Inc.
    e. Name of Project: Terror Lake Project.
    f. Location: The project is located on the Terror and Kizhuyak 
Rivers in Kodiak Island Borough, Alaska. The project occupies federal 
lands managed by the U.S. Fish and Wildlife Service within the Kodiak 
National Wildlife Refuge and on lands managed by the U.S. Coast Guard.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Darron Scott, President/CEO, Kodiak Electric 
Association, Inc. P.O. Box 787, Kodiak, AK 99615-0787, (907) 486-7707.
    i. FERC Contact: Mr. Steven Sachs (202) 502-8666 or 
Steven.Sachs@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and fishway prescriptions is 60 
days from the issuance date of this notice; reply comments are due 105 
days from the issuance date of this notice.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-filed. To paper-file, an 
original and seven copies should be mailed to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and 
contact information at the end of your comments.
    Please include the project number (P-2743-071) on any comments, 
motions, recommendations, or terms and conditions filed.
    k. Description of Request: The applicant proposes to install a 
third turbine-generator unit at the project. The new unit would have an 
installed capacity of 11.25 megawatts (MW) and be contained entirely 
within the project's powerhouse. The proposal would increase the 
hydraulic capacity of the project from 300 to 435 cubic feet per second 
and the authorized installed capacity from 22.5 to 33.75 MW. Because 
the project was constructed with provisions for the third unit, no 
significant modifications to conduits, structures, or electrical 
equipment would be required.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in 
the docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must (1) 
Bear in all capital letters the title

[[Page 36912]]

``COMMENTS'', ``PROTEST'', ``MOTION TO INTERVENE'', ``TERMS AND 
CONDITIONS'' or ``FISHWAY PRESCRIPTIONS'' as applicable; (2) set forth 
in the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. All comments, motions to intervene, or protests must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). All comments, motions to intervene, or 
protests should relate to project works which are the subject of the 
amendment. Agencies may obtain copies of the application directly from 
the applicant. A copy of any protest or motion to intervene must be 
served upon each representative of the applicant specified in the 
particular application. If an intervener files comments or documents 
with the Commission relating to the merits of an issue that may affect 
the responsibilities of a particular resource agency, they must also 
serve a copy of the document on that resource agency. A copy of all 
other filings in reference to this application must be accompanied by 
proof of service on all persons listed in the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.
    p. As provided for in 18 CFR 4.34(b)(5)(i), a license applicant 
must file, no later than 60 days following the date of issuance of this 
notice of acceptance and ready for environmental analysis: (1) A copy 
of the water quality certification; (2) a copy of the request for 
certification, including proof of the date on which the certifying 
agency received the request; or (3) evidence of waiver of water quality 
certification.

    Dated: June 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15697 Filed 6-22-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.