Transcontinental Gas Pipe Line Company, LLC; Notice of Request Under Blanket Authorization, 36533 [2011-15547]

Download as PDF Federal Register / Vol. 76, No. 120 / Wednesday, June 22, 2011 / Notices Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on June 27, 2011. Dated: June 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15524 Filed 6–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–491–000] mstockstill on DSK4VPTVN1PROD with NOTICES Transcontinental Gas Pipe Line Company, LLC; Notice of Request Under Blanket Authorization Take notice that on May 23, 2011 Transcontinental Gas Pipe Line Company, LLC (Transco), Post Office Box 1396, Houston, TX 77251, filed in the above Docket, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and Transco’s authorization in Docket No. CP82–426–000, for authorization to abandon in place: (i) Approximately 8.45 mile, 12-inch pipeline extending VerDate Mar<15>2010 16:40 Jun 21, 2011 Jkt 223001 from South Marsh Island Block 38 to South Marsh Island Block 23, (ii) approximately 0.455 mile, 12-inch pipeline extending from production platform B in South Marsh Island Block 33 to South Marsh Island Block 38, (iii) and related metering facilities at South Marsh Island Block 33 and appurtenant facilities, collectively referred as the SMI Facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Nan Miksovsky, Transcontinental Gas Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas, 77251 at (713) 215– 3422. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: June 6, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–15547 Filed 6–21–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 36533 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11–5–000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission’s regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor Hydro) requests a limited waiver of Part 358 of the Commission’s Regulations, Standards of Conduct for Transmission Providers (Standards of Conduct) adopted by the Commission in Order No. 717.1 Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. 1 Standards of Conduct for Transmission Providers, FERC Stats. & Regs. ¶ 31,280 (2008) (Order No. 717), order on reh’g, FERC Stats. & Regs. ¶ 31,297 (2009) (Order No. 717–A), order on reh’g, 129 FERC ¶61,123 (Order No. 717–B), order on reh’g, 131 FERC ¶ 61,045 (2010) (Order No. 717– C) , order on reh’g, 135 FERC ¶ 61,017 (2011) (Order No. 717–D). E:\FR\FM\22JNN1.SGM 22JNN1

Agencies

[Federal Register Volume 76, Number 120 (Wednesday, June 22, 2011)]
[Notices]
[Page 36533]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15547]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-491-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Request 
Under Blanket Authorization

    Take notice that on May 23, 2011 Transcontinental Gas Pipe Line 
Company, LLC (Transco), Post Office Box 1396, Houston, TX 77251, filed 
in the above Docket, a prior notice request pursuant to sections 
157.205 and 157.216 of the Commission's regulations under the Natural 
Gas Act (NGA) and Transco's authorization in Docket No. CP82-426-000, 
for authorization to abandon in place: (i) Approximately 8.45 mile, 12-
inch pipeline extending from South Marsh Island Block 38 to South Marsh 
Island Block 23, (ii) approximately 0.455 mile, 12-inch pipeline 
extending from production platform B in South Marsh Island Block 33 to 
South Marsh Island Block 38, (iii) and related metering facilities at 
South Marsh Island Block 33 and appurtenant facilities, collectively 
referred as the SMI Facilities, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Nan 
Miksovsky, Transcontinental Gas Pipe Line Company, LLC, P.O. Box 1396, 
Houston, Texas, 77251 at (713) 215-3422.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link.

    Dated: June 6, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-15547 Filed 6-21-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.