Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT, 35978 [2011-15351]
Download as PDF
35978
Federal Register / Vol. 76, No. 119 / Tuesday, June 21, 2011 / Rules and Regulations
2001–20 through 32, December 11, 2002.
125 Pages.
Department of Labor, Mine Safety and Health
Administration (DOL/MSHA). 2010.
Emergency Temporary Standard—
Maintenance of Incombustible Content of
Rock Dust in Underground Coal Mines
(75 FR 57849), September 23, 2010.
Department of Labor, Mine Safety and Health
Administration (DOL/MSHA). 2010.
Program Information Bulletin No. P10–
18, Accumulation of Combustible
Materials and Rock Dust. September 21,
2010. 3 Pages.
Department of Labor, Mine Safety and Health
Administration (DOL/MSHA). 2010.
Procedure Instruction Letter No. 10–V–
16, Accumulation of Combustible
Materials and Rock Dust. October 14,
2010. 3 Pages.
Dubaniewicz T. 2009. From Scotia to
Brookwood, fatal US underground coal
mine explosions ignited in intake air
courses. J Loss Prev Process Ind
22(1):52–58.
Hintermann B, Alberini A, Markandya A.
2010. Estimating the Value of Safety with
Labor Market Data: Are the Results
Trustworthy? Applied Economics
42(9):1085–1100.
National Institute for Occupational Safety
and Health (NIOSH). 2006. Float Coal
Dust Explosion Hazards. NIOSH
Technology News No. 515, April. DHHS
(NIOSH) Publication No. 2006–125. 2
Pages.
Office of Management and Budget (OMB).
1992. Circular No. A–94, ‘‘Guidelines
and Discount Rates for Benefit-Cost
Analysis of Federal Programs,’’ October
29, 1992. 22 Pages.
Sunstein C. 2004. Valuing Life: A Plea for
Disaggregation. Duke Law Journal, 54
(November 2004): 385–445.
U.S. Bureau of Economic Analysis. 2010.
National Income and Product Accounts
Table: Table 1.1.9. Implicit Price
Deflators for Gross Domestic Product
[Index numbers, 2005 = 100]. Revised
May 27, 2010. 3 Pages. https://
www.bea.gov/national/nipaweb/
TableView.asp?SelectedTable=13&Freq=
Qtr&FirstYear=2006&LastYear=2008
U.S. Department of Energy (DOE). 2010.
Energy Information Administration (EIA,
2010). Annual Coal Report 2009, Table
28. Revised October 1, 2010. 1 Page.
Viscusi W, Aldy J. 2003. The Value of a
Statistical Life: A Critical Review of
Market Estimates Throughout the World.
Journal of Risk and Uncertainty 27:5–76.
wwoods2 on DSK1DXX6B1PROD with RULES_PART 1
IX. Final Rule—Regulatory Text
List of Subjects in 30 CFR Part 75
Mine safety and health, Underground
coal mines, Combustible Materials and
Rock Dusting.
Dated: June 15, 2011.
Joseph A. Main,
Assistant Secretary of Labor for Mine Safety
and Health.
Chapter I of Title 30, part 75 of the
Code of Federal Regulations is amended
as follows:
VerDate Mar<15>2010
13:46 Jun 20, 2011
Jkt 223001
PART 75—SAFETY STANDARDS FOR
UNDERGROUND COAL MINES
1. The authority citation for part 75 is
revised to read as follows:
■
Authority: 30 U.S.C. 811.
2. Section 75.403 is republished to
read as follows:
■
§ 75.403 Maintenance of incombustible
content of rock dust.
Where rock dust is required to be
applied, it shall be distributed upon the
top, floor, and sides of all underground
areas of a coal mine and maintained in
such quantities that the incombustible
content of the combined coal dust, rock
dust, and other dust shall be not less
than 80 percent. Where methane is
present in any ventilating current, the
percent of incombustible content of
such combined dust shall be increased
0.4 percent for each 0.1 percent of
methane.
[FR Doc. 2011–15247 Filed 6–20–11; 8:45 am]
BILLING CODE 4510–43–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0492]
Drawbridge Operation Regulations;
Connecticut River, Old Lyme, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Amtrak Railroad
Bridge at mile 3.4, across the
Connecticut River at Old Lyme,
Connecticut. The deviation is necessary
to facilitate scheduled maintenance at
the bridge. This deviation allows the
bridge to remain in the closed position
during the deviation period.
DATES: This deviation is effective from
12:01 a.m. through 6 a.m. on June 23,
2011.
SUMMARY:
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0492 and are available online at https://
www.regulations.gov, inserting USCG–
2011–0492 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
ADDRESSES:
PO 00000
Frm 00022
Fmt 4700
Sfmt 4700
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Judy Leung-Yee, Project
Officer, First Coast Guard District,
judy.k.leung-yee@uscg.mil, or telephone
(212) 668–7165. If you have questions
on viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Amtrak Railroad Bridge, across the
Connecticut River at mile 3.4, at Old
Lyme, Connecticut, has a vertical
clearance in the closed position of 19
feet at mean high water and 22 feet at
mean low water. The drawbridge
operation regulations are listed at 33
CFR 117.205(b).
The waterway users are commercial
and recreational vessels.
The owner of the bridge, National
Railroad Passenger Company (Amtrak),
requested a temporary deviation from
the regulations to facilitate repair of the
main gear box and secondary reducer at
the bridge.
Under this temporary deviation the
Amtrak Railroad Bridge may remain in
the closed position between 12:01 a.m.
and 6 a.m. on June 23, 2011. Vessels
that can pass under the bridge in the
closed position may do so at any time.
The local marinas and commercial
users were notified. No objections were
received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: June 8, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–15351 Filed 6–20–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0481]
Drawbridge Operation Regulations;
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, Nassau, NY
AGENCY:
E:\FR\FM\21JNR1.SGM
Coast Guard, DHS.
21JNR1
Agencies
[Federal Register Volume 76, Number 119 (Tuesday, June 21, 2011)]
[Rules and Regulations]
[Page 35978]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15351]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0492]
Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Amtrak Railroad Bridge at mile 3.4, across the Connecticut River at Old
Lyme, Connecticut. The deviation is necessary to facilitate scheduled
maintenance at the bridge. This deviation allows the bridge to remain
in the closed position during the deviation period.
DATES: This deviation is effective from 12:01 a.m. through 6 a.m. on
June 23, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0492 and are available online
at http:[sol][sol]www.regulations.gov, inserting USCG-2011-0492 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Judy Leung-Yee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or telephone (212) 668-7165. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Amtrak Railroad Bridge, across the
Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical
clearance in the closed position of 19 feet at mean high water and 22
feet at mean low water. The drawbridge operation regulations are listed
at 33 CFR 117.205(b).
The waterway users are commercial and recreational vessels.
The owner of the bridge, National Railroad Passenger Company
(Amtrak), requested a temporary deviation from the regulations to
facilitate repair of the main gear box and secondary reducer at the
bridge.
Under this temporary deviation the Amtrak Railroad Bridge may
remain in the closed position between 12:01 a.m. and 6 a.m. on June 23,
2011. Vessels that can pass under the bridge in the closed position may
do so at any time.
The local marinas and commercial users were notified. No objections
were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 8, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-15351 Filed 6-20-11; 8:45 am]
BILLING CODE 9110-04-P