Notice Updating Procedural Schedule for Licensing; FirstLight Hydro Generating Company, City of Norwich Department of Public Utilities, 35886 [2011-15261]
Download as PDF
35886
Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
PF11–5). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15253 Filed 6–17–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11068–014—California]
Orange Cove Irrigation District, and
Friant Power Authority; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR part 380), the Office
of Energy Projects has prepared an
Environmental Assessment (EA)
regarding Orange Cove Irrigation
District’s and Friant Power Authority’s
request for a capacity-related
amendment of the license for the
Fishwater Release Hydroelectric Project.
The project is located at the Bureau of
Reclamation’s Friant Dam on the San
Joaquin River in Fresno County,
California. This EA concludes that the
proposed action would not constitute a
major federal action significantly
affecting the quality of the human
environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number (P–11068) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
Any comments on the EA should be
filed by July 21, 2011, and should be
addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1–A,
Washington, DC 20426. Please reference
the project name and project number
(P–11068) on all comments. Comments
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. FOR FURTHER
INFORMATION CONTACT Andrea Claros at
(202) 502–8171.
Dated: June 6, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–15192 Filed 6–17–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–012; Project No. 12968–
001]
Notice Updating Procedural Schedule
for Licensing; FirstLight Hydro
Generating Company, City of Norwich
Department of Public Utilities
Take notice that the Hydropower
Licensing Schedule for the Scotland
Hydroelectric Project No. 2662 and
Scotland Hydroelectric Project No.
12968 has been updated. Subsequent
revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of Additional Information ................................................................................................................................................
Issuance of the Better Adapted Statement Request ...............................................................................................................
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Filing of the Better Adapted Statement ...................................................................................................................................
Commission issues EA ............................................................................................................................................................
Comments on EA ....................................................................................................................................................................
Modified terms and conditions .................................................................................................................................................
July 7, 2011.
July 15, 2011.
July 15, 2011.
September 13, 2011.
September 13, 2011.
January 11, 2012.
February 10, 2012.
April 10, 2012.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2011–0505; FRL–8877–3]
sroberts on DSK5SPTVN1PROD with NOTICES
[FR Doc. 2011–15261 Filed 6–17–11; 8:45 am]
Certain New Chemicals; Receipt and
Status Information
BILLING CODE 6717–01–P
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
Section 5 of the Toxic
Substances Control Act (TSCA) requires
SUMMARY:
VerDate Mar<15>2010
16:50 Jun 17, 2011
Jkt 223001
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
any person who intends to manufacture
(defined by statute to include import) a
new chemical (i.e., a chemical not on
the TSCA Chemical Substances
Inventory (TSCA Inventory)) to notify
EPA and comply with the statutory
provisions pertaining to the
manufacture of new chemicals. Under
TSCA sections 5(d)(2) and 5(d)(3), EPA
is required to publish in the Federal
Register a notice of receipt of a
premanufacture notice (PMN) or an
E:\FR\FM\20JNN1.SGM
20JNN1
Agencies
[Federal Register Volume 76, Number 118 (Monday, June 20, 2011)]
[Notices]
[Page 35886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2662-012; Project No. 12968-001]
Notice Updating Procedural Schedule for Licensing; FirstLight
Hydro Generating Company, City of Norwich Department of Public
Utilities
Take notice that the Hydropower Licensing Schedule for the Scotland
Hydroelectric Project No. 2662 and Scotland Hydroelectric Project No.
12968 has been updated. Subsequent revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of Additional Information.... July 7, 2011.
Issuance of the Better Adapted July 15, 2011.
Statement Request.
Notice of Acceptance/Notice of Ready July 15, 2011.
for Environmental Analysis.
Filing of recommendations, September 13, 2011.
preliminary terms and conditions,
and fishway prescriptions.
Filing of the Better Adapted September 13, 2011.
Statement.
Commission issues EA................ January 11, 2012.
Comments on EA...................... February 10, 2012.
Modified terms and conditions....... April 10, 2012.
------------------------------------------------------------------------
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15261 Filed 6-17-11; 8:45 am]
BILLING CODE 6717-01-P