Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Carty Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting, 35884-35886 [2011-15253]
Download as PDF
35884
Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP11–485). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15254 Filed 6–17–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF11–5–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Gas Transmission Northwest LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Planned Carty Lateral Project, Request
for Comments on Environmental
Issues, and Notice of Public Scoping
Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Carty Lateral Project involving
construction and operation of facilities
by Gas Transmission Northwest LLC
(GTN) in Morrow County, Oregon. This
EA will be used by the Commission in
its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
VerDate Mar<15>2010
16:50 Jun 17, 2011
Jkt 223001
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on July 14,
2011.
Comments may be submitted in
written form or verbally. Further details
on how to submit written comments are
provided in the Public Participation
section of this notice. In lieu of or in
addition to sending written comments,
the Commission invites you to attend
the public scoping meeting scheduled as
follows: FERC Public Scoping Meeting,
Carty Lateral Project, June 28, 2011, 7
p.m. (PST), Ione Community School,
445 Spring Street, Ione, Oregon 97843.
GTN staff will hold and open house
meeting from 5–7 p.m., prior to the
public scoping meeting at the location
listed above.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
planned project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (https://
www.ferc.gov). This fact sheet addresses
a number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Summary of the Planned Project
GTN plans to construct and operate a
natural gas pipeline off its existing
mainline system in Morrow County,
Oregon. The Carty Lateral Project would
provide about 219,085 dekatherms per
day of natural gas to the Carty
Generating Station proposed by
Portland General Electric Company.
The Carty Lateral Project would
consist of the following facilities:
• Approximately 25 miles of 20-inchdiameter natural gas pipeline;
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
• One meter station;
• One pig launcher/receiver; and
• One mainline valve.
The planned pipeline begins at GTN’s
existing Ione Compressor Station and
terminates at the Carty Generating
Station site. GTN currently plans to
route the pipeline to avoid the
Boardman Conservation Area, but is
also considering a more direct option
through the conservation area.
The general location of the project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Construction of the planned facilities
would disturb about 370 acres of land.
Following construction, about 150 acres
would be maintained for permanent
operation of the project’s facilities; the
remaining acreage would be restored
and allowed to revert to former uses.
About 35 percent of the planned
pipeline route parallels an existing
electrical transmission right-of-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• Water resources, fisheries, and
wetlands;
• Vegetation and wildlife;
• Endangered and threatened species;
• Cultural resources;
• Land use;
• Air quality and noise; and
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
E:\FR\FM\20JNN1.SGM
20JNN1
Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices
• Public safety.
We will also evaluate possible
alternatives to the planned project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Although no formal application has
been filed, we have already initiated our
NEPA review under the Commission’s
pre-filing process. A flow chart
illustrating the pre-filing process is
included with this notice (Appendix 2).
The purpose of the pre-filing process is
to encourage early involvement of
interested stakeholders and to identify
and resolve issues before an application
is filed with the FERC. As part of our
pre-filing review, we have begun to
contact some Federal and State agencies
to discuss their involvement in the
scoping process and the preparation of
the EA.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section beginning on page 5.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
sroberts on DSK5SPTVN1PROD with NOTICES
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
Oregon State Historic Preservation
Office, and to solicit the views of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.3
3 The
Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Historic properties are
VerDate Mar<15>2010
16:50 Jun 17, 2011
Jkt 223001
We will define the project-specific Area
of Potential Effects (APE) in
consultation with the SHPO as the
project is further developed. On natural
gas projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (including the construction
right-of-way, contractor/pipe storage
yards, compressor stations, and access
roads). Our EA for this project will
document our findings on the impacts
on historic properties and summarize
the status of consultations under section
106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before July 14,
2011.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (PF11–5–000) with your
submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register for Historic Places.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
35885
(3) You may mail a paper copy of your
comments to the Commission at the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Indian tribes; other interested
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(Appendix 3).
Becoming an Intervenor
Once GTN files its application with
the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until a formal application for
the project is filed with the
Commission.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (https://www.ferc.gov) using the
E:\FR\FM\20JNN1.SGM
20JNN1
35886
Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
PF11–5). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–15253 Filed 6–17–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11068–014—California]
Orange Cove Irrigation District, and
Friant Power Authority; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR part 380), the Office
of Energy Projects has prepared an
Environmental Assessment (EA)
regarding Orange Cove Irrigation
District’s and Friant Power Authority’s
request for a capacity-related
amendment of the license for the
Fishwater Release Hydroelectric Project.
The project is located at the Bureau of
Reclamation’s Friant Dam on the San
Joaquin River in Fresno County,
California. This EA concludes that the
proposed action would not constitute a
major federal action significantly
affecting the quality of the human
environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number (P–11068) in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
Any comments on the EA should be
filed by July 21, 2011, and should be
addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1–A,
Washington, DC 20426. Please reference
the project name and project number
(P–11068) on all comments. Comments
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. FOR FURTHER
INFORMATION CONTACT Andrea Claros at
(202) 502–8171.
Dated: June 6, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–15192 Filed 6–17–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2662–012; Project No. 12968–
001]
Notice Updating Procedural Schedule
for Licensing; FirstLight Hydro
Generating Company, City of Norwich
Department of Public Utilities
Take notice that the Hydropower
Licensing Schedule for the Scotland
Hydroelectric Project No. 2662 and
Scotland Hydroelectric Project No.
12968 has been updated. Subsequent
revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of Additional Information ................................................................................................................................................
Issuance of the Better Adapted Statement Request ...............................................................................................................
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Filing of the Better Adapted Statement ...................................................................................................................................
Commission issues EA ............................................................................................................................................................
Comments on EA ....................................................................................................................................................................
Modified terms and conditions .................................................................................................................................................
July 7, 2011.
July 15, 2011.
July 15, 2011.
September 13, 2011.
September 13, 2011.
January 11, 2012.
February 10, 2012.
April 10, 2012.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2011–0505; FRL–8877–3]
sroberts on DSK5SPTVN1PROD with NOTICES
[FR Doc. 2011–15261 Filed 6–17–11; 8:45 am]
Certain New Chemicals; Receipt and
Status Information
BILLING CODE 6717–01–P
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
Section 5 of the Toxic
Substances Control Act (TSCA) requires
SUMMARY:
VerDate Mar<15>2010
16:50 Jun 17, 2011
Jkt 223001
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
any person who intends to manufacture
(defined by statute to include import) a
new chemical (i.e., a chemical not on
the TSCA Chemical Substances
Inventory (TSCA Inventory)) to notify
EPA and comply with the statutory
provisions pertaining to the
manufacture of new chemicals. Under
TSCA sections 5(d)(2) and 5(d)(3), EPA
is required to publish in the Federal
Register a notice of receipt of a
premanufacture notice (PMN) or an
E:\FR\FM\20JNN1.SGM
20JNN1
Agencies
[Federal Register Volume 76, Number 118 (Monday, June 20, 2011)]
[Notices]
[Pages 35884-35886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15253]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF11-5-000]
Gas Transmission Northwest LLC; Notice of Intent To Prepare an
Environmental Assessment for the Planned Carty Lateral Project, Request
for Comments on Environmental Issues, and Notice of Public Scoping
Meeting
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Carty Lateral Project
involving construction and operation of facilities by Gas Transmission
Northwest LLC (GTN) in Morrow County, Oregon. This EA will be used by
the Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on July 14, 2011.
Comments may be submitted in written form or verbally. Further
details on how to submit written comments are provided in the Public
Participation section of this notice. In lieu of or in addition to
sending written comments, the Commission invites you to attend the
public scoping meeting scheduled as follows: FERC Public Scoping
Meeting, Carty Lateral Project, June 28, 2011, 7 p.m. (PST), Ione
Community School, 445 Spring Street, Ione, Oregon 97843.
GTN staff will hold and open house meeting from 5-7 p.m., prior to
the public scoping meeting at the location listed above.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this planned
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the planned facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings where compensation would be
determined in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' is available for
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet
addresses a number of typically-asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
Summary of the Planned Project
GTN plans to construct and operate a natural gas pipeline off its
existing mainline system in Morrow County, Oregon. The Carty Lateral
Project would provide about 219,085 dekatherms per day of natural gas
to the Carty Generating Station proposed by Portland General Electric
Company.
The Carty Lateral Project would consist of the following
facilities:
Approximately 25 miles of 20-inch-diameter natural gas
pipeline;
One meter station;
One pig launcher/receiver; and
One mainline valve.
The planned pipeline begins at GTN's existing Ione Compressor
Station and terminates at the Carty Generating Station site. GTN
currently plans to route the pipeline to avoid the Boardman
Conservation Area, but is also considering a more direct option through
the conservation area.
The general location of the project facilities is shown in Appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the planned facilities would disturb about 370
acres of land. Following construction, about 150 acres would be
maintained for permanent operation of the project's facilities; the
remaining acreage would be restored and allowed to revert to former
uses. About 35 percent of the planned pipeline route parallels an
existing electrical transmission right-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as scoping. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. All comments
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the planned project under these
general headings:
Geology and soils;
Water resources, fisheries, and wetlands;
Vegetation and wildlife;
Endangered and threatened species;
Cultural resources;
Land use;
Air quality and noise; and
[[Page 35885]]
Public safety.
We will also evaluate possible alternatives to the planned project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Although no formal application has been filed, we have already
initiated our NEPA review under the Commission's pre-filing process. A
flow chart illustrating the pre-filing process is included with this
notice (Appendix 2). The purpose of the pre-filing process is to
encourage early involvement of interested stakeholders and to identify
and resolve issues before an application is filed with the FERC. As
part of our pre-filing review, we have begun to contact some Federal
and State agencies to discuss their involvement in the scoping process
and the preparation of the EA.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section beginning on page 5.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the Oregon State Historic Preservation Office, and to solicit the
views of other government agencies, interested Indian tribes, and the
public on the project's potential effects on historic properties.\3\ We
will define the project-specific Area of Potential Effects (APE) in
consultation with the SHPO as the project is further developed. On
natural gas projects, the APE at a minimum encompasses all areas
subject to ground disturbance (including the construction right-of-way,
contractor/pipe storage yards, compressor stations, and access roads).
Our EA for this project will document our findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\3\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Historic
properties are defined in those regulations as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register for Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before July 14,
2011.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances, please reference the
project docket number (PF11-5-000) with your submission. The Commission
encourages electronic filing of comments and has expert eFiling staff
available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you
can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may mail a paper copy of your comments to the Commission at
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Indian tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
planned project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (Appendix 3).
Becoming an Intervenor
Once GTN files its application with the Commission, you may want to
become an ``intervenor'' which is an official party to the Commission's
proceeding. Intervenors play a more formal role in the process and are
able to file briefs, appear at hearings, and be heard by the courts if
they choose to appeal the Commission's final ruling. An intervenor
formally participates in the proceeding by filing a request to
intervene. Instructions for becoming an intervenor are included in the
User's Guide under the ``e-filing'' link on the Commission's Web site.
Please note that the Commission will not accept requests for intervenor
status at this time. You must wait until a formal application for the
project is filed with the Commission.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site (https://www.ferc.gov) using the
[[Page 35886]]
eLibrary link. Click on the eLibrary link, click on ``General Search''
and enter the docket number, excluding the last three digits in the
Docket Number field (i.e., PF11-5). Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676,
or for TTY, contact (202) 502-8659. The eLibrary link also provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15253 Filed 6-17-11; 8:45 am]
BILLING CODE 6717-01-P