Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Carty Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting, 35884-35886 [2011-15253]

Download as PDF 35884 Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP11–485). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: June 14, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15254 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11–5–000] sroberts on DSK5SPTVN1PROD with NOTICES Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Carty Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Carty Lateral Project involving construction and operation of facilities by Gas Transmission Northwest LLC (GTN) in Morrow County, Oregon. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. VerDate Mar<15>2010 16:50 Jun 17, 2011 Jkt 223001 Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on July 14, 2011. Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the Public Participation section of this notice. In lieu of or in addition to sending written comments, the Commission invites you to attend the public scoping meeting scheduled as follows: FERC Public Scoping Meeting, Carty Lateral Project, June 28, 2011, 7 p.m. (PST), Ione Community School, 445 Spring Street, Ione, Oregon 97843. GTN staff will hold and open house meeting from 5–7 p.m., prior to the public scoping meeting at the location listed above. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives are asked to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a pipeline company representative about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ is available for viewing on the FERC Web site (https:// www.ferc.gov). This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Summary of the Planned Project GTN plans to construct and operate a natural gas pipeline off its existing mainline system in Morrow County, Oregon. The Carty Lateral Project would provide about 219,085 dekatherms per day of natural gas to the Carty Generating Station proposed by Portland General Electric Company. The Carty Lateral Project would consist of the following facilities: • Approximately 25 miles of 20-inchdiameter natural gas pipeline; PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 • One meter station; • One pig launcher/receiver; and • One mainline valve. The planned pipeline begins at GTN’s existing Ione Compressor Station and terminates at the Carty Generating Station site. GTN currently plans to route the pipeline to avoid the Boardman Conservation Area, but is also considering a more direct option through the conservation area. The general location of the project facilities is shown in Appendix 1.1 Land Requirements for Construction Construction of the planned facilities would disturb about 370 acres of land. Following construction, about 150 acres would be maintained for permanent operation of the project’s facilities; the remaining acreage would be restored and allowed to revert to former uses. About 35 percent of the planned pipeline route parallels an existing electrical transmission right-of-way. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as scoping. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the planned project under these general headings: • Geology and soils; • Water resources, fisheries, and wetlands; • Vegetation and wildlife; • Endangered and threatened species; • Cultural resources; • Land use; • Air quality and noise; and 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. E:\FR\FM\20JNN1.SGM 20JNN1 Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices • Public safety. We will also evaluate possible alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Although no formal application has been filed, we have already initiated our NEPA review under the Commission’s pre-filing process. A flow chart illustrating the pre-filing process is included with this notice (Appendix 2). The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before an application is filed with the FERC. As part of our pre-filing review, we have begun to contact some Federal and State agencies to discuss their involvement in the scoping process and the preparation of the EA. Our independent analysis of the issues will be presented in the EA. The EA will be placed in the public record and, depending on the comments received during the scoping process, may be published and distributed to the public. A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section beginning on page 5. With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. sroberts on DSK5SPTVN1PROD with NOTICES Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the Oregon State Historic Preservation Office, and to solicit the views of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.3 3 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Historic properties are VerDate Mar<15>2010 16:50 Jun 17, 2011 Jkt 223001 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project is further developed. On natural gas projects, the APE at a minimum encompasses all areas subject to ground disturbance (including the construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that they will be received in Washington, DC on or before July 14, 2011. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number (PF11–5–000) with your submission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or defined in those regulations as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register for Historic Places. PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 35885 (3) You may mail a paper copy of your comments to the Commission at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Indian tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (Appendix 3). Becoming an Intervenor Once GTN files its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until a formal application for the project is filed with the Commission. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (https://www.ferc.gov) using the E:\FR\FM\20JNN1.SGM 20JNN1 35886 Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF11–5). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: June 14, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15253 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11068–014—California] Orange Cove Irrigation District, and Friant Power Authority; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s (Commission) regulations (18 CFR part 380), the Office of Energy Projects has prepared an Environmental Assessment (EA) regarding Orange Cove Irrigation District’s and Friant Power Authority’s request for a capacity-related amendment of the license for the Fishwater Release Hydroelectric Project. The project is located at the Bureau of Reclamation’s Friant Dam on the San Joaquin River in Fresno County, California. This EA concludes that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number (P–11068) in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. Any comments on the EA should be filed by July 21, 2011, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please reference the project name and project number (P–11068) on all comments. Comments may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. FOR FURTHER INFORMATION CONTACT Andrea Claros at (202) 502–8171. Dated: June 6, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–15192 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662–012; Project No. 12968– 001] Notice Updating Procedural Schedule for Licensing; FirstLight Hydro Generating Company, City of Norwich Department of Public Utilities Take notice that the Hydropower Licensing Schedule for the Scotland Hydroelectric Project No. 2662 and Scotland Hydroelectric Project No. 12968 has been updated. Subsequent revisions to the schedule may be made as appropriate. Milestone Target date Filing of Additional Information ................................................................................................................................................ Issuance of the Better Adapted Statement Request ............................................................................................................... Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..................................................... Filing of the Better Adapted Statement ................................................................................................................................... Commission issues EA ............................................................................................................................................................ Comments on EA .................................................................................................................................................................... Modified terms and conditions ................................................................................................................................................. July 7, 2011. July 15, 2011. July 15, 2011. September 13, 2011. September 13, 2011. January 11, 2012. February 10, 2012. April 10, 2012. Dated: June 14, 2011. Kimberly D. Bose, Secretary. ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2011–0505; FRL–8877–3] sroberts on DSK5SPTVN1PROD with NOTICES [FR Doc. 2011–15261 Filed 6–17–11; 8:45 am] Certain New Chemicals; Receipt and Status Information BILLING CODE 6717–01–P Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: Section 5 of the Toxic Substances Control Act (TSCA) requires SUMMARY: VerDate Mar<15>2010 16:50 Jun 17, 2011 Jkt 223001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 any person who intends to manufacture (defined by statute to include import) a new chemical (i.e., a chemical not on the TSCA Chemical Substances Inventory (TSCA Inventory)) to notify EPA and comply with the statutory provisions pertaining to the manufacture of new chemicals. Under TSCA sections 5(d)(2) and 5(d)(3), EPA is required to publish in the Federal Register a notice of receipt of a premanufacture notice (PMN) or an E:\FR\FM\20JNN1.SGM 20JNN1

Agencies

[Federal Register Volume 76, Number 118 (Monday, June 20, 2011)]
[Notices]
[Pages 35884-35886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15253]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF11-5-000]


Gas Transmission Northwest LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Planned Carty Lateral Project, Request 
for Comments on Environmental Issues, and Notice of Public Scoping 
Meeting

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Carty Lateral Project 
involving construction and operation of facilities by Gas Transmission 
Northwest LLC (GTN) in Morrow County, Oregon. This EA will be used by 
the Commission in its decision-making process to determine whether the 
project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues need to be evaluated in the EA. Please note that 
the scoping period will close on July 14, 2011.
    Comments may be submitted in written form or verbally. Further 
details on how to submit written comments are provided in the Public 
Participation section of this notice. In lieu of or in addition to 
sending written comments, the Commission invites you to attend the 
public scoping meeting scheduled as follows: FERC Public Scoping 
Meeting, Carty Lateral Project, June 28, 2011, 7 p.m. (PST), Ione 
Community School, 445 Spring Street, Ione, Oregon 97843.
    GTN staff will hold and open house meeting from 5-7 p.m., prior to 
the public scoping meeting at the location listed above.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives are asked to notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the planned facilities. 
The company would seek to negotiate a mutually acceptable agreement. 
However, if the project is approved by the Commission, that approval 
conveys with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings where compensation would be 
determined in accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet 
addresses a number of typically-asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings.

Summary of the Planned Project

    GTN plans to construct and operate a natural gas pipeline off its 
existing mainline system in Morrow County, Oregon. The Carty Lateral 
Project would provide about 219,085 dekatherms per day of natural gas 
to the Carty Generating Station proposed by Portland General Electric 
Company.
    The Carty Lateral Project would consist of the following 
facilities:
     Approximately 25 miles of 20-inch-diameter natural gas 
pipeline;
     One meter station;
     One pig launcher/receiver; and
     One mainline valve.
    The planned pipeline begins at GTN's existing Ione Compressor 
Station and terminates at the Carty Generating Station site. GTN 
currently plans to route the pipeline to avoid the Boardman 
Conservation Area, but is also considering a more direct option through 
the conservation area.
    The general location of the project facilities is shown in Appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
https://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would disturb about 370 
acres of land. Following construction, about 150 acres would be 
maintained for permanent operation of the project's facilities; the 
remaining acreage would be restored and allowed to revert to former 
uses. About 35 percent of the planned pipeline route parallels an 
existing electrical transmission right-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as scoping. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned project under these 
general headings:
     Geology and soils;
     Water resources, fisheries, and wetlands;
     Vegetation and wildlife;
     Endangered and threatened species;
     Cultural resources;
     Land use;
     Air quality and noise; and

[[Page 35885]]

     Public safety.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Although no formal application has been filed, we have already 
initiated our NEPA review under the Commission's pre-filing process. A 
flow chart illustrating the pre-filing process is included with this 
notice (Appendix 2). The purpose of the pre-filing process is to 
encourage early involvement of interested stakeholders and to identify 
and resolve issues before an application is filed with the FERC. As 
part of our pre-filing review, we have begun to contact some Federal 
and State agencies to discuss their involvement in the scoping process 
and the preparation of the EA.
    Our independent analysis of the issues will be presented in the EA. 
The EA will be placed in the public record and, depending on the 
comments received during the scoping process, may be published and 
distributed to the public. A comment period will be allotted if the EA 
is published for review. We will consider all comments on the EA before 
we make our recommendations to the Commission. To ensure your comments 
are considered, please carefully follow the instructions in the Public 
Participation section beginning on page 5.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice.

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the Oregon State Historic Preservation Office, and to solicit the 
views of other government agencies, interested Indian tribes, and the 
public on the project's potential effects on historic properties.\3\ We 
will define the project-specific Area of Potential Effects (APE) in 
consultation with the SHPO as the project is further developed. On 
natural gas projects, the APE at a minimum encompasses all areas 
subject to ground disturbance (including the construction right-of-way, 
contractor/pipe storage yards, compressor stations, and access roads). 
Our EA for this project will document our findings on the impacts on 
historic properties and summarize the status of consultations under 
section 106.
---------------------------------------------------------------------------

    \3\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Historic 
properties are defined in those regulations as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register for Historic 
Places.
---------------------------------------------------------------------------

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that they will be received in Washington, DC on or before July 14, 
2011.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number (PF11-5-000) with your submission. The Commission 
encourages electronic filing of comments and has expert eFiling staff 
available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an 
easy method for interested persons to submit brief, text-only comments 
on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you 
can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may mail a paper copy of your comments to the Commission at 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Indian tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
planned project.
    If the EA is published for distribution, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (Appendix 3).

Becoming an Intervenor

    Once GTN files its application with the Commission, you may want to 
become an ``intervenor'' which is an official party to the Commission's 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are included in the 
User's Guide under the ``e-filing'' link on the Commission's Web site. 
Please note that the Commission will not accept requests for intervenor 
status at this time. You must wait until a formal application for the 
project is filed with the Commission.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (https://www.ferc.gov) using the

[[Page 35886]]

eLibrary link. Click on the eLibrary link, click on ``General Search'' 
and enter the docket number, excluding the last three digits in the 
Docket Number field (i.e., PF11-5). Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, 
or for TTY, contact (202) 502-8659. The eLibrary link also provides 
access to the texts of formal documents issued by the Commission, such 
as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: June 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15253 Filed 6-17-11; 8:45 am]
BILLING CODE 6717-01-P