Download as PDF 35876 Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. Dated: June 13, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–15170 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sroberts on DSK5SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER97–3359–018. Applicants: Florida Power & Light Company. Description: Florida Power & Light Company’s Errata to the Notice in Change in Status. Filed Date: 06/13/2011. Accession Number: 20110613–5131. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Docket Numbers: ER11–2700–004. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. VerDate Mar<15>2010 16:50 Jun 17, 2011 Jkt 223001 submits tariff filing per 35: 06–13–11 CMMPA Compliance Filing to be effective 3/21/2011. Filed Date: 06/13/2011. Accession Number: 20110613–5113. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Docket Numbers: ER11–2815–001. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35: Compliance filing per Order in ER11– 2815–000 to correct Attachment J to be effective 6/1/2011. Filed Date: 06/13/2011. Accession Number: 20110613–5066. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Docket Numbers: ER11–3787–000. Applicants: Exelon Generation Company, LLC. Description: Exelon Generation Company, LLC submits tariff filing per 35: Electric Rate Schedule FERC No. 20 to be effective 6/1/2011. Filed Date: 06/13/2011. Accession Number: 20110613–5077. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Docket Numbers: ER11–3788–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: SGIA Among NYISO, National Grid and Chautauqua County to be effective 6/1/2011. Filed Date: 06/13/2011. Accession Number: 20110613–5093. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Docket Numbers: ER11–3789–000. Applicants: Consolidated Edison Company of New York, Inc. Description: Consolidated Edison Company of New York, Inc. submits tariff filing per 35.13(a)(1): Amendment to PASNY and EDDS for Targeted DSM Program June 2011 to be effective 6/14/ 2011 under ER11–3789 Filing Type: 320. Filed Date: 06/13/2011. Accession Number: 20110613–5099. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES11–37–000. Applicants: Duquesne Light Company. Description: Application of Duquesne Light Company Pursuant to Section 204 of the Federal Power Act for an Order Authorizing the Issuance of Short-Term Indebtedness. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Filed Date: 06/13/2011. Accession Number: 20110613–5133. Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR11–5–000. Applicants: North American Electric Reliability Corp. Description: Petition of the North American Electric Reliability Corp. for Approval of Appendices 3B and 3D to NERC Rules of Procedure Regarding the Election Procedure for Members of NERC Standards Committee and Registered Ballot Body Criteria. Filed Date: 06/13/2011. Accession Number: 20110613–5163. Comment Date: 5 p.m. Eastern Time on Tuesday, July 5, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the E:\FR\FM\20JNN1.SGM 20JNN1 Federal Register / Vol. 76, No. 118 / Monday, June 20, 2011 / Notices FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 14, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–15191 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission sroberts on DSK5SPTVN1PROD with NOTICES Combined Notice of Filings #3 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3499–001. Applicants: Florida Power Corporation. Description: Florida Power Corporation submits tariff filing per 35.17(b): Revised Rate Schedule No. 139 of Florida Power Corp. in Docket ER11– 3499 to be effective 5/1/2011. Filed Date: 06/10/2011. Accession Number: 20110610–5189. Comment Date: 5 p.m. Eastern Time on Friday, June 24, 2011. Docket Numbers: ER11–3614–001. Applicants: Glacial Energy Holdings. Description: Glacial Energy Holdings submits tariff filing per 35: Substitute Market-based Tariff of Glacial Energy Holdings to be effective 5/23/2011. Filed Date: 06/10/2011. Accession Number: 20110610–5196. VerDate Mar<15>2010 16:50 Jun 17, 2011 Jkt 223001 Comment Date: 5 p.m. Eastern Time on Friday, July 01, 2011. Docket Numbers: ER11–3782–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2011–06– 10 CAISO Revised IBAAO with WALC DSR to be effective 6/15/2011. Filed Date: 06/10/2011. Accession Number: 20110610–5150. Comment Date: 5 p.m. Eastern Time on Friday, July 01, 201.1 Docket Numbers: ER11–3783–000. Applicants: Kentucky Utilities Company. Description: Kentucky Utilities Company submits tariff filing per 35.13(a)(2)(iii: 06_10_11 Nicholasville Amendment to be effective 6/10/2011. Filed Date: 06/10/2011. Accession Number: 20110610–5155. Comment Date: 5 p.m. Eastern Time on Friday, July 01, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 35877 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: June 10, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–15158 Filed 6–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3643–001. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.17(b): OATT Formula Rate Revised Schedules 3, 3A, 5 and 6 to be effective 7/25/2011. Filed Date: 06/09/2011. Accession Number: 20110609–5096. Comment Date: 5 p.m. Eastern Time on Thursday, June 30, 2011. Docket Numbers: ER11–3766–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: E:\FR\FM\20JNN1.SGM 20JNN1

Agencies

[Federal Register Volume 76, Number 118 (Monday, June 20, 2011)]
[Notices]
[Pages 35876-35877]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-15191]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER97-3359-018.
    Applicants: Florida Power & Light Company.
    Description: Florida Power & Light Company's Errata to the Notice 
in Change in Status.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5131.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Docket Numbers: ER11-2700-004.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc. 
submits tariff filing per 35: 06-13-11 CMMPA Compliance Filing to be 
effective 3/21/2011.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5113.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Docket Numbers: ER11-2815-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: PJM Interconnection, L.L.C. submits tariff filing per 
35: Compliance filing per Order in ER11-2815-000 to correct Attachment 
J to be effective 6/1/2011.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5066.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Docket Numbers: ER11-3787-000.
    Applicants: Exelon Generation Company, LLC.
    Description: Exelon Generation Company, LLC submits tariff filing 
per 35: Electric Rate Schedule FERC No. 20 to be effective 6/1/2011.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5077.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Docket Numbers: ER11-3788-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: New York Independent System Operator, Inc. submits 
tariff filing per 35.13(a)(2)(iii: SGIA Among NYISO, National Grid and 
Chautauqua County to be effective 6/1/2011.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5093.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Docket Numbers: ER11-3789-000.
    Applicants: Consolidated Edison Company of New York, Inc.
    Description: Consolidated Edison Company of New York, Inc. submits 
tariff filing per 35.13(a)(1): Amendment to PASNY and EDDS for Targeted 
DSM Program June 2011 to be effective 6/14/2011 under ER11-3789 Filing 
Type: 320.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5099.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES11-37-000.
    Applicants: Duquesne Light Company.
    Description: Application of Duquesne Light Company Pursuant to 
Section 204 of the Federal Power Act for an Order Authorizing the 
Issuance of Short-Term Indebtedness.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5133.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 05, 2011.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR11-5-000.
    Applicants: North American Electric Reliability Corp.
    Description: Petition of the North American Electric Reliability 
Corp. for Approval of Appendices 3B and 3D to NERC Rules of Procedure 
Regarding the Election Procedure for Members of NERC Standards 
Committee and Registered Ballot Body Criteria.
    Filed Date: 06/13/2011.
    Accession Number: 20110613-5163.
    Comment Date: 5 p.m. Eastern Time on Tuesday, July 5, 2011.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    As it relates to any qualifying facility filings, the notices of 
self-certification [or self-recertification] listed above, do not 
institute a proceeding regarding qualifying facility status. A notice 
of self-certification [or self-recertification] simply provides 
notification that the entity making the filing has determined the 
facility named in the notice meets the applicable criteria to be a 
qualifying facility. Intervention and/or protest do not lie in dockets 
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying 
facility status may do so by filing a motion pursuant to 18 CFR 
292.207(d)(iii). Intervention and protests may be filed in response to 
notices of qualifying facility dockets other than self-certifications 
and self-recertifications.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the

[[Page 35877]]

FERC Online links at https://www.ferc.gov. To facilitate electronic 
service, persons with Internet access who will eFile a document and/or 
be listed as a contact for an intervenor must create and validate an 
eRegistration account using the eRegistration link. Select the eFiling 
link to log on and submit the intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: June 14, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-15191 Filed 6-17-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.