Northern States Power Company (Xcel Energy); Notice of Application To Amend License and Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 35212-35213 [2011-14966]
Download as PDF
35212
Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 28,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: June 8, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–14887 Filed 6–15–11; 8:45 am]
srobinson on DSK4SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:18 Jun 15, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2056–052]
Northern States Power Company (Xcel
Energy); Notice of Application To
Amend License and Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
to License.
b. Project No: 2056–052.
c. Date Filed: May 25, 2011.
d. Applicant: Northern States Power
Company (Xcel Energy).
e. Name of Project: St. Anthony Falls
Hydroelectric Project.
f. Location: On the Mississippi River
in the city of Minneapolis in Hennepin
County, Minnesota.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: William P.
Zawacki, Director of Hydro Plants, Xcel
Energy, 1414 W. Hamilton Ave., P.O.
Box 8, Eau Claire, WI 54702–0008; and
Matthew J. Miller, Hydro Licensing
Specialist, Xcel Energy, 1414 W.
Hamilton Ave., P.O. Box 8, Eau Claire,
WI 54702–0008.
i. FERC Contact: Kim Carter at (202)
502–6486; Kim.Carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number
(P–2056–052) on any comments,
motions, or recommendations filed.
k. Description of Request: The
licensee proposes to amend the license
for the St. Anthony Falls Hydroelectric
Project to reflect the rehabilitated units.
The authorized installed capacity would
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
increase by 1,845.25 kW [from 12,400
kW to 14,245.25 kW] and the maximum
hydraulic capacity would increase by
341 cubic feet per second (cfs) [from
4,025 to 4,366 cfs].
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
E:\FR\FM\16JNN1.SGM
16JNN1
Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14966 Filed 6–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2984–042]
srobinson on DSK4SPTVN1PROD with NOTICES
S. D. Warren Company; Notice of
Supplement to the License Application
And Soliciting Comments
Take notice that the following
supplement to the license application
has been filed with the Commission and
is available for public inspection.
a. Type of Filing: Supplement to the
licensing application for the Eel Weir
Project.
b. Project No.: P–2984–042.
c. Date Filed: June 6, 2011 (The
version of the supplement filed on May
26, 2011, was superseded by the revised
version filed on June 6, 2011).
d. Applicant: S. D. Warren Company.
e. Location: The existing project is
located at the outlet of Sebago Lake on
the Presumpscot River, in Cumberland
County, Maine. The project does not
affect federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nancy J.
Skancke, GKRSE, 1500 K Street, NW.,
Suite 330, Washington, DC 20005; (202)
408–5400.
i. FERC Contact: Tom Dean (202) 502–
6041.
j. Deadline for filing comments on the
supplement: 30 days from the issuance
date of this notice. All reply comments
must be filed with the Commission
VerDate Mar<15>2010
17:18 Jun 15, 2011
Jkt 223001
within 45 days from the date of this
notice.
All comments and reply comments
may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of the supplement: S.
D. Warren (Warren) requests the
Commission adopt modifications to the
existing Sebago Lake Level Management
Plan (LLMP) that would include
changing project operation from
requiring seasonal target lake water
surface elevations to a seasonal flowbased regime. Under the modified
LLMP, Warren would first direct flows
into the bypassed reach as required by
the license, and would then direct flows
that are above the required minimum
bypassed reach flow into the power
canal. Warren also requests
confirmation that no further wetland
studies at Sebago Lake are necessary,
that no shoreline permitting program is
needed under a new license, and that no
new shallow boat launch near the
project facilities is necessary.
l. A copy of the supplement is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
35213
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support
Dated: June 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14898 Filed 6–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14115–000]
AJT Mining Properties, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 21, 2011, AJT Mining
Properties, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Yeldagalga Creek Hydroelectric
Project (project) to be located on the
Yeldagalga Creek, near Haines, in the
boroughs of Haines and Juneau, Alaska.
The project would be located on lands
within the Tongass National Forest,
which is owned and managed by the
U.S.D.A. Forest Service. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 10-foot-high, 50foot-wide diversion dam; (2) an
overflow spillway; (3) a 42-inchdiameter, 2,500-foot-long penstock; (4) a
powerhouse containing a generating
unit rated at 8 megawatts; (5) a short
tailrace; (6) living quarters for
personnel; (7) a dock and barge landing
facility; (8) a 34.5-kilovolt, 16-mile-long
overhead transmission line; and (9)
appurtenant facilities. The estimated
annual generation of the project would
be 31,000 megawatt-hours.
Applicant Contact: Mr. Scott Willis,
AJT Mining Properties, Inc., 5601
Tonsgard Court, Juneau, Alaska 99801;
phone: (907) 463–6396.
FERC Contact: Kelly Wolcott; phone:
(202) 502–6480.
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 76, Number 116 (Thursday, June 16, 2011)]
[Notices]
[Pages 35212-35213]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14966]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2056-052]
Northern States Power Company (Xcel Energy); Notice of
Application To Amend License and Accepted for Filing, Soliciting
Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 2056-052.
c. Date Filed: May 25, 2011.
d. Applicant: Northern States Power Company (Xcel Energy).
e. Name of Project: St. Anthony Falls Hydroelectric Project.
f. Location: On the Mississippi River in the city of Minneapolis in
Hennepin County, Minnesota.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: William P. Zawacki, Director of Hydro Plants,
Xcel Energy, 1414 W. Hamilton Ave., P.O. Box 8, Eau Claire, WI 54702-
0008; and Matthew J. Miller, Hydro Licensing Specialist, Xcel Energy,
1414 W. Hamilton Ave., P.O. Box 8, Eau Claire, WI 54702-0008.
i. FERC Contact: Kim Carter at (202) 502-6486; Kim.Carter@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice. All
documents may be filed electronically via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project number (P-2056-052) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee proposes to amend the
license for the St. Anthony Falls Hydroelectric Project to reflect the
rehabilitated units. The authorized installed capacity would increase
by 1,845.25 kW [from 12,400 kW to 14,245.25 kW] and the maximum
hydraulic capacity would increase by 341 cubic feet per second (cfs)
[from 4,025 to 4,366 cfs].
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works
[[Page 35213]]
which are the subject of the license surrender. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: June 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14966 Filed 6-15-11; 8:45 am]
BILLING CODE 6717-01-P