Piedmont Natural Gas Company, Inc.; Notice of Application, 35202-35203 [2011-14964]

Download as PDF 35202 Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions .................................. Commission issues Single EA ................................................................................................................................................. Comments on EA .................................................................................................................................................................... Modified terms and conditions ................................................................................................................................................. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: June 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14967 Filed 6–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–495–000] srobinson on DSK4SPTVN1PROD with NOTICES Piedmont Natural Gas Company, Inc.; Notice of Application On June 3, 2011, Piedmont Natural Gas Company, Inc. (Piedmont) filed with the Federal Energy Regulatory Commission (Commission) an application pursuant to section 7(f) of the Natural Gas Act (NGA), as amended, and section 157 of the Commission’s Regulations, for service area determination for their Charlotte, North Carolina and Fort Mill, South Carolina service areas, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For VerDate Mar<15>2010 17:18 Jun 15, 2011 Jkt 223001 assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Questions regarding this application should be directed to Michelle R. Mendoza, Piedmont Natural Gas Company, Inc., Post Office Box 33068, Charlotte, NC 28233 or by e-mailing michelle.mendoza@piedmontng.com or to James H. Jeffries IV, Moore & Van Allen PLLC, 100 North Tryon Street, Suite 4700, Charlotte, NC 28202–4003 or by calling 704–331–1079 or by e-mailing mvaferc@mvalaw.com. Pursuant to section 157.9 of the Commission’s rules, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 August 9, 2011. December 7, 2011. January 6, 2011. March 5, 2012. CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. E:\FR\FM\16JNN1.SGM 16JNN1 Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comment Date: July 1, 2011. Dated: June 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14964 Filed 6–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–493–000] srobinson on DSK4SPTVN1PROD with NOTICES Dominion Transmission, Inc.; Notice Application Take notice that on May 27, 2011, Dominion Transmission, Inc. (Dominion), filed an application in Docket No. CP11–493–000 pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s Regulations, for a certificate of public convenience and necessity to: (1) Revise the active storage boundary; and (2) establish a protective boundary for the Woodhull Storage Pool located in Steuben County, New York, all as more fully set forth in the applications which is on file with the Commission and open for public inspection. Any questions regarding this application should be directed to Amanda K. Prestage, Regulatory and Certificates Analyst III, Dominion Transmission, Inc., 701 East Cary Street, Richmond, Virginia 23219, or call at (804) 771–4416. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and VerDate Mar<15>2010 17:18 Jun 15, 2011 Jkt 223001 State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 35203 Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: July 1, 2011. Dated: June 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14963 Filed 6–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER05–644–013. Applicants: PSEG Energy Resources & Trade LLC. Description: Informational Filing with a list of planned Additional Project Investments of the PSEG Companies. Filed Date: 06/03/2011. Accession Number: 20110603–5417. Comment Date: 5 p.m. Eastern Time on Friday, June 24, 2011. Docket Numbers: ER11–2617–002. Applicants: ISO New England Inc., Vermont Electric Power Company, Inc. Description: ISO New England Inc. submits tariff filing per 35: PTO Compliance Filing—ER11–2617, to be effective 4/1/2011. Filed Date: 06/09/2011. Accession Number: 20110609–5014. Comment Date: 5 p.m. Eastern Time on Thursday, June 30, 2011. Docket Numbers: ER11–2999–003. E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 76, Number 116 (Thursday, June 16, 2011)]
[Notices]
[Pages 35202-35203]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14964]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-495-000]


Piedmont Natural Gas Company, Inc.; Notice of Application

    On June 3, 2011, Piedmont Natural Gas Company, Inc. (Piedmont) 
filed with the Federal Energy Regulatory Commission (Commission) an 
application pursuant to section 7(f) of the Natural Gas Act (NGA), as 
amended, and section 157 of the Commission's Regulations, for service 
area determination for their Charlotte, North Carolina and Fort Mill, 
South Carolina service areas, all as more fully set forth in the 
application, which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. There is an ``eSubscription'' link on the Web site that 
enables subscribers to receive e-mail notification when a document is 
added to a subscribed docket(s). For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TTY, 
(202) 502-8659.
    Questions regarding this application should be directed to Michelle 
R. Mendoza, Piedmont Natural Gas Company, Inc., Post Office Box 33068, 
Charlotte, NC 28233 or by e-mailing michelle.mendoza@piedmontng.com or 
to James H. Jeffries IV, Moore & Van Allen PLLC, 100 North Tryon 
Street, Suite 4700, Charlotte, NC 28202-4003 or by calling 704-331-1079 
or by e-mailing mvaferc@mvalaw.com.
    Pursuant to section 157.9 of the Commission's rules, within 90 days 
of this Notice the Commission staff will either: complete its 
environmental assessment (EA) and place it into the Commission's public 
record (eLibrary) for this proceeding; or issue a Notice of Schedule 
for Environmental Review. If a Notice of Schedule for Environmental 
Review is issued, it will indicate, among other milestones, the 
anticipated date for the Commission staff's issuance of the final 
environmental impact statement (FEIS) or EA for this proposal. The 
filing of the EA in the Commission's public record for this proceeding 
or the issuance of a Notice of Schedule for Environmental Review will 
serve to notify Federal and state agencies of the timing for the 
completion of all necessary reviews, and the subsequent need to 
complete all Federal authorizations within 90 days of the date of 
issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.

[[Page 35203]]

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit original and seven copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    Comment Date: July 1, 2011.

    Dated: June 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14964 Filed 6-15-11; 8:45 am]
BILLING CODE 6717-01-P