Download as PDF Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: June 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14966 Filed 6–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2984–042] srobinson on DSK4SPTVN1PROD with NOTICES S. D. Warren Company; Notice of Supplement to the License Application And Soliciting Comments Take notice that the following supplement to the license application has been filed with the Commission and is available for public inspection. a. Type of Filing: Supplement to the licensing application for the Eel Weir Project. b. Project No.: P–2984–042. c. Date Filed: June 6, 2011 (The version of the supplement filed on May 26, 2011, was superseded by the revised version filed on June 6, 2011). d. Applicant: S. D. Warren Company. e. Location: The existing project is located at the outlet of Sebago Lake on the Presumpscot River, in Cumberland County, Maine. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Nancy J. Skancke, GKRSE, 1500 K Street, NW., Suite 330, Washington, DC 20005; (202) 408–5400. i. FERC Contact: Tom Dean (202) 502– 6041. j. Deadline for filing comments on the supplement: 30 days from the issuance date of this notice. All reply comments must be filed with the Commission VerDate Mar<15>2010 17:18 Jun 15, 2011 Jkt 223001 within 45 days from the date of this notice. All comments and reply comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of the supplement: S. D. Warren (Warren) requests the Commission adopt modifications to the existing Sebago Lake Level Management Plan (LLMP) that would include changing project operation from requiring seasonal target lake water surface elevations to a seasonal flowbased regime. Under the modified LLMP, Warren would first direct flows into the bypassed reach as required by the license, and would then direct flows that are above the required minimum bypassed reach flow into the power canal. Warren also requests confirmation that no further wetland studies at Sebago Lake are necessary, that no shoreline permitting program is needed under a new license, and that no new shallow boat launch near the project facilities is necessary. l. A copy of the supplement is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 35213 m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support Dated: June 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14898 Filed 6–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115–000] AJT Mining Properties, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 21, 2011, AJT Mining Properties, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Yeldagalga Creek Hydroelectric Project (project) to be located on the Yeldagalga Creek, near Haines, in the boroughs of Haines and Juneau, Alaska. The project would be located on lands within the Tongass National Forest, which is owned and managed by the U.S.D.A. Forest Service. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 10-foot-high, 50foot-wide diversion dam; (2) an overflow spillway; (3) a 42-inchdiameter, 2,500-foot-long penstock; (4) a powerhouse containing a generating unit rated at 8 megawatts; (5) a short tailrace; (6) living quarters for personnel; (7) a dock and barge landing facility; (8) a 34.5-kilovolt, 16-mile-long overhead transmission line; and (9) appurtenant facilities. The estimated annual generation of the project would be 31,000 megawatt-hours. Applicant Contact: Mr. Scott Willis, AJT Mining Properties, Inc., 5601 Tonsgard Court, Juneau, Alaska 99801; phone: (907) 463–6396. FERC Contact: Kelly Wolcott; phone: (202) 502–6480. E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 76, Number 116 (Thursday, June 16, 2011)]
[Notices]
[Page 35213]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14898]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2984-042]


S. D. Warren Company; Notice of Supplement to the License 
Application And Soliciting Comments

    Take notice that the following supplement to the license 
application has been filed with the Commission and is available for 
public inspection.
    a. Type of Filing: Supplement to the licensing application for the 
Eel Weir Project.
    b. Project No.: P-2984-042.
    c. Date Filed: June 6, 2011 (The version of the supplement filed on 
May 26, 2011, was superseded by the revised version filed on June 6, 
2011).
    d. Applicant: S. D. Warren Company.
    e. Location: The existing project is located at the outlet of 
Sebago Lake on the Presumpscot River, in Cumberland County, Maine. The 
project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Nancy J. Skancke, GKRSE, 1500 K Street, NW., 
Suite 330, Washington, DC 20005; (202) 408-5400.
    i. FERC Contact: Tom Dean (202) 502-6041.
    j. Deadline for filing comments on the supplement: 30 days from the 
issuance date of this notice. All reply comments must be filed with the 
Commission within 45 days from the date of this notice.
    All comments and reply comments may be filed electronically via the 
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. Description of the supplement: S. D. Warren (Warren) requests 
the Commission adopt modifications to the existing Sebago Lake Level 
Management Plan (LLMP) that would include changing project operation 
from requiring seasonal target lake water surface elevations to a 
seasonal flow-based regime. Under the modified LLMP, Warren would first 
direct flows into the bypassed reach as required by the license, and 
would then direct flows that are above the required minimum bypassed 
reach flow into the power canal. Warren also requests confirmation that 
no further wetland studies at Sebago Lake are necessary, that no 
shoreline permitting program is needed under a new license, and that no 
new shallow boat launch near the project facilities is necessary.
    l. A copy of the supplement is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support.
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support

    Dated: June 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14898 Filed 6-15-11; 8:45 am]
BILLING CODE 6717-01-P