S. D. Warren Company; Notice of Supplement to the License Application And Soliciting Comments, 35213 [2011-14898]
Download as PDF
Federal Register / Vol. 76, No. 116 / Thursday, June 16, 2011 / Notices
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: June 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14966 Filed 6–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2984–042]
srobinson on DSK4SPTVN1PROD with NOTICES
S. D. Warren Company; Notice of
Supplement to the License Application
And Soliciting Comments
Take notice that the following
supplement to the license application
has been filed with the Commission and
is available for public inspection.
a. Type of Filing: Supplement to the
licensing application for the Eel Weir
Project.
b. Project No.: P–2984–042.
c. Date Filed: June 6, 2011 (The
version of the supplement filed on May
26, 2011, was superseded by the revised
version filed on June 6, 2011).
d. Applicant: S. D. Warren Company.
e. Location: The existing project is
located at the outlet of Sebago Lake on
the Presumpscot River, in Cumberland
County, Maine. The project does not
affect federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nancy J.
Skancke, GKRSE, 1500 K Street, NW.,
Suite 330, Washington, DC 20005; (202)
408–5400.
i. FERC Contact: Tom Dean (202) 502–
6041.
j. Deadline for filing comments on the
supplement: 30 days from the issuance
date of this notice. All reply comments
must be filed with the Commission
VerDate Mar<15>2010
17:18 Jun 15, 2011
Jkt 223001
within 45 days from the date of this
notice.
All comments and reply comments
may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of the supplement: S.
D. Warren (Warren) requests the
Commission adopt modifications to the
existing Sebago Lake Level Management
Plan (LLMP) that would include
changing project operation from
requiring seasonal target lake water
surface elevations to a seasonal flowbased regime. Under the modified
LLMP, Warren would first direct flows
into the bypassed reach as required by
the license, and would then direct flows
that are above the required minimum
bypassed reach flow into the power
canal. Warren also requests
confirmation that no further wetland
studies at Sebago Lake are necessary,
that no shoreline permitting program is
needed under a new license, and that no
new shallow boat launch near the
project facilities is necessary.
l. A copy of the supplement is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
35213
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support
Dated: June 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14898 Filed 6–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14115–000]
AJT Mining Properties, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 21, 2011, AJT Mining
Properties, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Yeldagalga Creek Hydroelectric
Project (project) to be located on the
Yeldagalga Creek, near Haines, in the
boroughs of Haines and Juneau, Alaska.
The project would be located on lands
within the Tongass National Forest,
which is owned and managed by the
U.S.D.A. Forest Service. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 10-foot-high, 50foot-wide diversion dam; (2) an
overflow spillway; (3) a 42-inchdiameter, 2,500-foot-long penstock; (4) a
powerhouse containing a generating
unit rated at 8 megawatts; (5) a short
tailrace; (6) living quarters for
personnel; (7) a dock and barge landing
facility; (8) a 34.5-kilovolt, 16-mile-long
overhead transmission line; and (9)
appurtenant facilities. The estimated
annual generation of the project would
be 31,000 megawatt-hours.
Applicant Contact: Mr. Scott Willis,
AJT Mining Properties, Inc., 5601
Tonsgard Court, Juneau, Alaska 99801;
phone: (907) 463–6396.
FERC Contact: Kelly Wolcott; phone:
(202) 502–6480.
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 76, Number 116 (Thursday, June 16, 2011)]
[Notices]
[Page 35213]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14898]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2984-042]
S. D. Warren Company; Notice of Supplement to the License
Application And Soliciting Comments
Take notice that the following supplement to the license
application has been filed with the Commission and is available for
public inspection.
a. Type of Filing: Supplement to the licensing application for the
Eel Weir Project.
b. Project No.: P-2984-042.
c. Date Filed: June 6, 2011 (The version of the supplement filed on
May 26, 2011, was superseded by the revised version filed on June 6,
2011).
d. Applicant: S. D. Warren Company.
e. Location: The existing project is located at the outlet of
Sebago Lake on the Presumpscot River, in Cumberland County, Maine. The
project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Nancy J. Skancke, GKRSE, 1500 K Street, NW.,
Suite 330, Washington, DC 20005; (202) 408-5400.
i. FERC Contact: Tom Dean (202) 502-6041.
j. Deadline for filing comments on the supplement: 30 days from the
issuance date of this notice. All reply comments must be filed with the
Commission within 45 days from the date of this notice.
All comments and reply comments may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. Description of the supplement: S. D. Warren (Warren) requests
the Commission adopt modifications to the existing Sebago Lake Level
Management Plan (LLMP) that would include changing project operation
from requiring seasonal target lake water surface elevations to a
seasonal flow-based regime. Under the modified LLMP, Warren would first
direct flows into the bypassed reach as required by the license, and
would then direct flows that are above the required minimum bypassed
reach flow into the power canal. Warren also requests confirmation that
no further wetland studies at Sebago Lake are necessary, that no
shoreline permitting program is needed under a new license, and that no
new shallow boat launch near the project facilities is necessary.
l. A copy of the supplement is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support
Dated: June 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14898 Filed 6-15-11; 8:45 am]
BILLING CODE 6717-01-P