Regency Intrastate Gas LP; Notice of Filing, 34974-34975 [2011-14759]

Download as PDF 34974 Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157–000] jlentini on DSK4TPTVN1PROD with NOTICES Public Utility District No. 1 of Snohomish County; Notice of Authorization for Continued Project Operation On June 1, 2009 the Public Utility District No. 1 of Snohomish County, licensee for the Henry M. Jackson Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Henry M. Jackson Hydroelectric Project is located on the Sultan River in Snohomish County, Washington. The license for Project No. 2157 was issued for a period ending May 31, 2011. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2157 is issued to the Public Utility District No. 1 of Snohomish County for a period effective June 1, 2011 through May 31, 2012, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before May 31, 2012, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically VerDate Mar<15>2010 16:42 Jun 14, 2011 Jkt 223001 without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the Public Utility District No. 1 of Snohomish County is authorized to continue operation of the Henry M. Jackson Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14753 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11–113–000] Cranberry Pipeline Corporation; Notice of Filing Take notice that on June 6, 2011, Cranberry Pipeline Corporation (Cranberry) filed to request a casespecific waiver of section 284.126(b)(1)(iv) of the Commission’s regulations which was promulgated in Order No. 735.1 Order No. 735 requires all section 311 and Hinshaw pipelines to file quarterly reports containing transportation transaction information including receipt points for each transaction. Cranberry requests waiver so that it can identify ‘‘production pool’’ as the receipt point for its transactions instead of a specific receipt point as more fully described in the filing. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. 1 Contract Reporting Requirements of Intrastate Natural Gas Companies, Order No. 735, 131 FERC ¶ 61,150 (May 20, 2010). PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DATES: Comment Date: 5 p.m. Eastern time on Friday, June 17, 2011. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14758 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11–114–000] Regency Intrastate Gas LP; Notice of Filing Take notice that on June 7, 2011, Regency Intrastate Gas LP, (Regency) filed to revise its Operating Statement. Regency states the modifications are to remove the anchor shipper provisions, which are no longer applicable, and to add provisions related to the collection of information from its shippers, as more fully described in the filing. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. E:\FR\FM\15JNN1.SGM 15JNN1 Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Friday, June 17, 2011. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14759 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Friday, June 17, 2011. Dated: June 8, 2011. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2011–14756 Filed 6–14–11; 8:45 am] 34975 Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Friday, June 17, 2011. BILLING CODE 6717–01–P Kinder Morgan Texas Pipeline, LLC; Notice of Petition for Rate Approval jlentini on DSK4TPTVN1PROD with NOTICES [Docket No. PR10–139–000] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14757 Filed 6–14–11; 8:45 am] Take notice that on March 24, 2010, Kinder Morgan Texas Pipeline, LLC, (KMTP) filed a petition pursuant to section 284.123(b)(1) of the Commission’s regulations a rate election for transportation service. KMTP states the rate election is a continuation of one of its effective cost-based transportation component for city-gate services on file with the Railroad Commission of Texas, a more fully detailed in the petition. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to VerDate Mar<15>2010 16:42 Jun 14, 2011 Jkt 223001 BILLING CODE 6717–01–P [Docket No. PR11–112–000] Atmos Pipeline-Texas; Notice of Petition for Rate Approval Take notice that on June 6, 2011, Atmos Pipeline-Texas (APT) filed a petition pursuant to section 284.123(b)(1) of the Commission’s regulations a rate election for transportation service. APT states the rate election reflects its cost-based transportation rates on file with the Railroad Commission of Texas, a more fully detailed in the petition. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14102–000] U.S. Farmers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 22, 2011, U.S. Farmers, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the E:\FR\FM\15JNN1.SGM 15JNN1

Agencies

[Federal Register Volume 76, Number 115 (Wednesday, June 15, 2011)]
[Notices]
[Pages 34974-34975]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14759]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. PR11-114-000]


Regency Intrastate Gas LP; Notice of Filing

    Take notice that on June 7, 2011, Regency Intrastate Gas LP, 
(Regency) filed to revise its Operating Statement. Regency states the 
modifications are to remove the anchor shipper provisions, which are no 
longer applicable, and to add provisions related to the collection of 
information from its shippers, as more fully described in the filing.
    Any person desiring to participate in this rate filing must file in 
accordance with Rules 211 and 214 of the Commission's Rules of Practice 
and Procedure (18 CFR 385.211 and 385.214). Protests will be considered 
by the Commission in determining the appropriate action to be taken, 
but will not serve to make protestants parties to the proceeding. Any 
person wishing to become a party must file a notice of intervention or 
motion to intervene, as appropriate. Such notices, motions, or protests 
must be filed on or before the date as indicated below. Anyone filing 
an intervention or protest must serve a copy of that document on the 
Applicant.

[[Page 34975]]

Anyone filing an intervention or protest on or before the intervention 
or protest date need not serve motions to intervene or protests on 
persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 7 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on Friday, June 17, 2011.

    Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14759 Filed 6-14-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.