U.S. Farmers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34975-34976 [2011-14755]
Download as PDF
Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Friday, June 17, 2011.
Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14759 Filed 6–14–11; 8:45 am]
BILLING CODE 6717–01–P
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Friday, June 17, 2011.
Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2011–14756 Filed 6–14–11; 8:45 am]
34975
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Friday, June 17, 2011.
BILLING CODE 6717–01–P
Kinder Morgan Texas Pipeline, LLC;
Notice of Petition for Rate Approval
jlentini on DSK4TPTVN1PROD with NOTICES
[Docket No. PR10–139–000]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14757 Filed 6–14–11; 8:45 am]
Take notice that on March 24, 2010,
Kinder Morgan Texas Pipeline, LLC,
(KMTP) filed a petition pursuant to
section 284.123(b)(1) of the
Commission’s regulations a rate election
for transportation service. KMTP states
the rate election is a continuation of one
of its effective cost-based transportation
component for city-gate services on file
with the Railroad Commission of Texas,
a more fully detailed in the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
VerDate Mar<15>2010
16:42 Jun 14, 2011
Jkt 223001
BILLING CODE 6717–01–P
[Docket No. PR11–112–000]
Atmos Pipeline-Texas; Notice of
Petition for Rate Approval
Take notice that on June 6, 2011,
Atmos Pipeline-Texas (APT) filed a
petition pursuant to section
284.123(b)(1) of the Commission’s
regulations a rate election for
transportation service. APT states the
rate election reflects its cost-based
transportation rates on file with the
Railroad Commission of Texas, a more
fully detailed in the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14102–000]
U.S. Farmers, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 22, 2011, U.S. Farmers,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
E:\FR\FM\15JNN1.SGM
15JNN1
34976
Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices
Deep Creek Hydroelectric Project to be
located on Deep Creek, Oxbow Creek,
and Snake River in Adams County,
Idaho. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project will consist of
the following; (1) a 20-foot-wide, 6-feethigh concrete diversion on Deep Creek;
(2) a 20-foot-wide, 6-feet-high concrete
diversion on Oxbow Creek; (3) a 10,000foot-long, 2-foot-diameter steel
penstock; (4) a powerhouse situated at
the confluence of Deep Creek and the
Snake River containing one Pelton-type
impulse turbine at 3-megawatts; (5) a
500-foot-long, 12.5-kilovolt-ampere
transmission line connecting to the
Idaho Power Company’s Hell Canyon
Dam sub-station at the Hells Canyon
Dam; (6) a 10,000-foot-long gravel road.
The estimated annual generation of the
project would be 13 gigawatt-hours.
Applicant Contact: Mr. John J.
Straubhar, P.O. Box 5071, Twinfalls, ID
83303; phone: (208) 794–2930.
FERC Contact: Ian Smith; phone:
(202) 502–8943.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14102–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–14755 Filed 6–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
EXEMPT
File date
1. CP11–46–000 ..........................................
2. P–2299–000 .............................................
3. P–2299–000 .............................................
jlentini on DSK4TPTVN1PROD with NOTICES
Docket No.
5–23–11
5–23–11
5–31–11
1 Record
Presenter or requester
Kenneth Warn1.
Hon. Jeff Denham.
Hon. Dick Monteith, et al.
of conference call and supporting documents.
VerDate Mar<15>2010
16:42 Jun 14, 2011
Jkt 223001
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
E:\FR\FM\15JNN1.SGM
15JNN1
Agencies
[Federal Register Volume 76, Number 115 (Wednesday, June 15, 2011)]
[Notices]
[Pages 34975-34976]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14755]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14102-000]
U.S. Farmers, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On February 22, 2011, U.S. Farmers, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the
[[Page 34976]]
Deep Creek Hydroelectric Project to be located on Deep Creek, Oxbow
Creek, and Snake River in Adams County, Idaho. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project will consist of the following; (1) a 20-foot-
wide, 6-feet-high concrete diversion on Deep Creek; (2) a 20-foot-wide,
6-feet-high concrete diversion on Oxbow Creek; (3) a 10,000-foot-long,
2-foot-diameter steel penstock; (4) a powerhouse situated at the
confluence of Deep Creek and the Snake River containing one Pelton-type
impulse turbine at 3-megawatts; (5) a 500-foot-long, 12.5-kilovolt-
ampere transmission line connecting to the Idaho Power Company's Hell
Canyon Dam sub-station at the Hells Canyon Dam; (6) a 10,000-foot-long
gravel road. The estimated annual generation of the project would be 13
gigawatt-hours.
Applicant Contact: Mr. John J. Straubhar, P.O. Box 5071, Twinfalls,
ID 83303; phone: (208) 794-2930.
FERC Contact: Ian Smith; phone: (202) 502-8943.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14102-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14755 Filed 6-14-11; 8:45 am]