ANR Pipeline Company; Notice of Application, 34971-34972 [2011-14748]

Download as PDF Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices also be served upon each representative of the Applicant specified in the particular application. o. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14754 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI11–8–000] jlentini on DSK4TPTVN1PROD with NOTICES City of Dover, NH; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI11–8–000. c. Date Filed: May 24, 2011. d. Applicant: City of Dover, New Hampshire. e. Name of Project: Effluent Outfall Hydraulic Energy Harvester Project (Outfall Project). f. Location: The Effluent Outfall Hydraulic Energy Harvester Project will be located on an outfall pipe discharging effluence from a wastewater treatment plant located in the City of Dover, Strafford County, New Hampshire. g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Henry Russell, Walker Wellington, P.O. Box 308, 95 Brewery Lane/Unit #9, Portsmouth, NH 03802; Telephone: (603) 498–2384; FAX: (207) 439–6049; e-mail: www.Henry@walkerwellington,com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and motions: July 8, 2011. All documents should be filed electronically via the Internet. See 18 VerDate Mar<15>2010 16:42 Jun 14, 2011 Jkt 223001 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI11–8–000) on any comments, protests, and/or motions filed. k. Description of Project: The Outfall Project would consist of an in-line hydraulic energy harvester, placed on the outfall pipe that discharges treated effluence from the city’s wastewater treatment plant. The source of water for power generation comes from the city’s sewer system, supplemented with water from gravel-packed wells. The unit is expected to generate between 5 kW and 15 kW. The generated power will be used on-site to operate ventilation and lighting equipment at the treatment facility. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 34971 FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, and/or Motions To Intervene—Anyone may submit comments, a protest, and a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, and/or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14750 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–492–000] ANR Pipeline Company; Notice of Application Take notice that on May 25, ANR Pipeline Company (ANR), 717 Texas Street, Houston, Texas 77002–2761, filed with the Commission an E:\FR\FM\15JNN1.SGM 15JNN1 jlentini on DSK4TPTVN1PROD with NOTICES 34972 Federal Register / Vol. 76, No. 115 / Wednesday, June 15, 2011 / Notices application under section 7(b) of the Natural Gas Act (NGA) for authorization to abandon its obligation to provide transportation service through approximately 15.1 miles of noncontiguous 20-inch diameter pipeline from South Pelto Block 13 to a manifold platform in Ship Shoal Block 70, and appurtenances, located in Federal waters, offshore Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the petition should be directed to Rene Staeb, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company, 717 Texas Street, Houston, Texas 77002–2761, at (832) 320–5215 or fax (832) 320–6215 or Rene_Staeb@transcanada.com. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone VerDate Mar<15>2010 16:42 Jun 14, 2011 Jkt 223001 will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: June 29, 2011. Dated: June 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14748 Filed 6–14–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–494–000] USG Pipeline Company; Notice of Application Take notice that on May 31, 2011, USG Pipeline Company (USGPC), Department 143–61, 550 West Adams Street, Chicago, Illinois 60661–3676, filed with the Commission an application in Docket No. CP11–494– 000, pursuant to section 7 of the Natural Gas Act (NGA) and subpart F of Part 157 of the Commission’s Regulations, for a blanket certificate to perform certain activities under section 157.201, et seq., of the Commission’s Regulations, as more fully set forth in the application which is open to public inspection. This filing may be also viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERCOnline Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions regarding this application should be directed to Counsel for USG Pipeline Company, William H. Penniman, Paul F. Forshay or Sandra E. Safro, Sutherland Ashbill & Brennan LLP, 1275 Pennsylvania Avenue, Washington DC 20004–2415, or via telephone at (202) 383–0100, facsimile number (202) 637–3593, and e-mail: william.penniman@sutherland.com, paul.forshay@sutherland.com or sandra.safro@sutherland.com. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit an original and 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other E:\FR\FM\15JNN1.SGM 15JNN1

Agencies

[Federal Register Volume 76, Number 115 (Wednesday, June 15, 2011)]
[Notices]
[Pages 34971-34972]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14748]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-492-000]


 ANR Pipeline Company; Notice of Application

    Take notice that on May 25, ANR Pipeline Company (ANR), 717 Texas 
Street, Houston, Texas 77002-2761, filed with the Commission an

[[Page 34972]]

application under section 7(b) of the Natural Gas Act (NGA) for 
authorization to abandon its obligation to provide transportation 
service through approximately 15.1 miles of non-contiguous 20-inch 
diameter pipeline from South Pelto Block 13 to a manifold platform in 
Ship Shoal Block 70, and appurtenances, located in Federal waters, 
offshore Louisiana, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. 
This filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding the petition should be directed to Rene 
Staeb, Manager, Project Determinations & Regulatory Administration, ANR 
Pipeline Company, 717 Texas Street, Houston, Texas 77002-2761, at (832) 
320-5215 or fax (832) 320-6215 or Rene_Staeb@transcanada.com.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: June 29, 2011.

    Dated: June 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-14748 Filed 6-14-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.