Environmental Impacts Statements; Notice of Availability, 34072-34073 [2011-14437]

Download as PDF WReier-Aviles on DSKGBLS3C1PROD with NOTICES 34072 Federal Register / Vol. 76, No. 112 / Friday, June 10, 2011 / Notices module would contain 2 generating units with a total combined capacity of 2.2 megawatts (MW); (5) a new switchyard containing a transformer; (6) a proposed 300-feet-long, 13-kilovolt (kV) transmission line to an existing distribution line. The proposed project would have an average annual generation of 10.6 megawatt-hours (MWh), which would be sold to a local utility. Applicant Contact: Mr. Wayne Krouse, Hydro Green Energy LLC, 5090 Richmond Avenue #390, Houston, TX 77056; phone (877) 556–6566 x709. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14107–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 31, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14384 Filed 6–9–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 14:33 Jun 09, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–489–000] Midwestern Gas Transmission Company; Notice of Request Under Blanket Authorization Take notice that on May 19, 2011, Midwestern Gas Transmission Company (Midwestern) filed a prior notice request for authorization, in accordance with 18 CFR 157.205 and 157.208 of the Federal Energy Regulatory Commission’s (Commission) Regulations under the Natural Gas Act for the authority to construct, own and operate approximately 1.2 miles of new 30-inch diameter natural gas pipeline, abandon in place approximately 1.1 miles of existing 30-inch diameter natural gas pipeline, and remove approximately 100 feet of 30-inch diameter natural gas pipeline in Will County, Illinois. Midwestern also seeks to install a new stopple fitting located adjacent to its existing REXALL meter station. Midwestern estimates the total cost of the proposed project to be $10,194,000, all as more fully set forth in the application, which is open to the public for inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this prior notice should be directed to Joseph Miller, Midwestern Gas Transmission Company, 100 West 5th Street, ONEOK Plaza, Tulsa, Oklahoma 74103, or telephone (918) 588–7057, or by fax (918) 588–7890, or by e-mail jwmiller@oneok.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and ill not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. Dated: June 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–14385 Filed 6–9–11; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8997–4] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 05/30/2011 Through 06/03/2011 Pursuant to 40 CFR 1506.9 Notice In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA met this mandate by publishing weekly notices of availability E:\FR\FM\10JNN1.SGM 10JNN1 34073 Federal Register / Vol. 76, No. 112 / Friday, June 10, 2011 / Notices of EPA comments, which includes a brief summary of EPA’s comment letters, in the Federal Register. Since February 2008, EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/ nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA’s comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20110176, Draft EIS, BLM, NV, Clark, Lincoln, and White Pine Counties Groundwater Development Project, Construction and Operation of Pipeline System and Associated Infrastructure, Right-of-Way Application, Clark, Lincoln, White Pine, NV, Comment Period Ends: 09/08/2011, Contact: Penny Woods 775–861–6466. EIS No. 20110177, Draft EIS, NOAA, 00, Reef Fish Amendment 32, Gag— Rebuilding Plan, Annual Catch Limits, Management Measures, Red Grouper—Annual Catch Limits, Management Measures, Grouper Accountability Measures, Gulf of Mexico, Comment Period Ends: 07/25/2011, Contact: Roy E. Crabtree PhD 727–824–5301. EIS No. 20110178, Draft EIS, NRC, FL, Generic—License Renewal of Nuclear Plants Regarding Crystal River Unit 3 Nuclear Generating Unit, Supplement 44, City of Crystal River, Citrus County, FL, Comment Period Ends: 07/25/2011, Contact: Daniel Doyle 301–415–3748. EIS No. 20110179, Draft EIS, USFS, CO, Ski Resort Peak 6 Project, To Better Accommodate Existing Daily Visitation Levels, Dillon Ranger District, White River National Forest, Summit County, CO, Comment Period Ends: 07/25/2011, Contact: Jan Cutts 970–262–3451. EIS No. 20110180, Draft Supplement, BLM, UT, Greater Natural Buttes Area Gas Development Project, New Information on National Ambient Air Quality Standards and New Monitoring Data, Proposes to Develop Oil and Gas Resources within the 162–911–Acre, Uintah County, UT, Comment Period Ends: 07/25/2011, Contact: Stephanie Howard 435–781– 4469. EIS No. 20110181, Final EIS, USACE, LA, New Orleans To Venice (NOV), Louisiana, Hurricane Risk Reduction Project, Incorporation of Non-Federal Levees from Oakville to St. Jude, Plaquemines Parish, LA, Review Period Ends: 07/11/2011, Contact: Christopher Koeppel 601–631–5410. EIS No. 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, Proposed 150 megawatt Solar Energy Generating Facility, 161-kV/230-kV Electrical Transmission Tie-Line and 161-kV/230-kV Electrical Interconnection Switchyard, Riverside County, CA, Review Period Ends: 07/11/2011, Contact: Liana Reilly 720–962–7253. Amended Notices EIS No. 20110168, Draft Supplement, USFS, ID, Bussel 484 Project Area, Updated and New Information, Manage the Project Area to Achieve Desired Future Conditions for Vegetation, Fire, Fuels, Recreation, Access, Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, St. Joe Ranger District, Shoshone County, ID, Comment Period Ends: 07/18/2011, Contact: Lynette Myhre 208–245–2531. Revision to FR Notice Published 06/03/2011: Correction to Contact Telephone Number. Dated: June 7, 2011. Cliff Rader, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2011–14437 Filed 6–9–11; 8:45 am] BILLING CODE 6560–50–P FEDERAL DEPOSIT INSURANCE CORPORATION Update to Notice of Financial Institutions for Which the Federal Deposit Insurance Corporation Has Been Appointed Either Receiver, Liquidator, or Manager Federal Deposit Insurance Corporation. ACTION: Update Listing of Financial Institutions in Liquidation. AGENCY: Notice is hereby given that the Federal Deposit Insurance Corporation (Corporation) has been appointed the sole receiver for the following financial institutions effective as of the Date Closed as indicated in the listing. This list (as updated from time to time in the Federal Register) may be relied upon as ‘‘of record’’ notice that the Corporation has been appointed receiver for purposes of the statement of policy published in the July 2, 1992 issue of the Federal Register (57 FR 29491). For further information concerning the identification of any institutions which have been placed in liquidation, please visit the Corporation Web site at https:// www.fdic.gov/bank/individual/failed/ banklist.html or contact the Manager of Receivership Oversight in the appropriate service center. SUMMARY: Dated: June 6, 2011. Federal Deposit Insurance Corporation. Pamela Johnson, Regulatory Editing Specialist. INSTITUTIONS IN LIQUIDATION [In alphabetical order] FDIC Ref. No. Bank name City State 10369 ............................................. Atlantic Bank and Trust ................ Charleston .................................... SC ..................... WReier-Aviles on DSKGBLS3C1PROD with NOTICES BILLING CODE 6714–01–P FEDERAL ELECTION COMMISSION Sunshine Act Notice Federal Election Commission. Wednesday, June 15, 2011 at 10 a.m. AGENCY: DATE AND TIME: VerDate Mar<15>2010 14:33 Jun 09, 2011 Jkt 223001 06/03/2011 999 E Street, NW., Washington, Corporations and Labor DC (Ninth Floor). Organizations. STATUS: This meeting will be open to the Draft Notice of Availability for Rulemaking Petition by James public. Madison Center for Free Speech. ITEMS TO BE DISCUSSED: Draft Notice of Availability for Correction and Approval of the Minutes Rulemaking Petition by for the Meeting of May 26, 2011. Representative Chris Van Hollen. Draft Notice of Proposed Rulemaking on Draft Advisory Opinion 2011–08: Independent Expenditures and American Society of Electioneering Communications by Anesthesiologists. PLACE: [FR Doc. 2011–14403 Filed 6–9–11; 8:45 am] Date closed PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\10JNN1.SGM 10JNN1

Agencies

[Federal Register Volume 76, Number 112 (Friday, June 10, 2011)]
[Notices]
[Pages 34072-34073]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14437]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8997-4]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 05/30/2011 Through 06/03/2011 Pursuant to 40 CFR 1506.9

Notice

    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA met this mandate by publishing weekly notices 
of availability

[[Page 34073]]

of EPA comments, which includes a brief summary of EPA's comment 
letters, in the Federal Register. Since February 2008, EPA has included 
its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters 
on the Web site satisfies the Section 309(a) requirement to make EPA's 
comments on EISs available to the public. Accordingly, on March 31, 
2010, EPA discontinued the publication of the notice of availability of 
EPA comments in the Federal Register.

EIS No. 20110176, Draft EIS, BLM, NV, Clark, Lincoln, and White Pine 
Counties Groundwater Development Project, Construction and Operation of 
Pipeline System and Associated Infrastructure, Right-of-Way 
Application, Clark, Lincoln, White Pine, NV, Comment Period Ends: 09/
08/2011, Contact: Penny Woods 775-861-6466.
EIS No. 20110177, Draft EIS, NOAA, 00, Reef Fish Amendment 32, Gag--
Rebuilding Plan, Annual Catch Limits, Management Measures, Red 
Grouper--Annual Catch Limits, Management Measures, Grouper 
Accountability Measures, Gulf of Mexico, Comment Period Ends: 07/25/
2011, Contact: Roy E. Crabtree PhD 727-824-5301.
EIS No. 20110178, Draft EIS, NRC, FL, Generic--License Renewal of 
Nuclear Plants Regarding Crystal River Unit 3 Nuclear Generating Unit, 
Supplement 44, City of Crystal River, Citrus County, FL, Comment Period 
Ends: 07/25/2011, Contact: Daniel Doyle 301-415-3748.
EIS No. 20110179, Draft EIS, USFS, CO, Ski Resort Peak 6 Project, To 
Better Accommodate Existing Daily Visitation Levels, Dillon Ranger 
District, White River National Forest, Summit County, CO, Comment 
Period Ends: 07/25/2011, Contact: Jan Cutts 970-262-3451.
EIS No. 20110180, Draft Supplement, BLM, UT, Greater Natural Buttes 
Area Gas Development Project, New Information on National Ambient Air 
Quality Standards and New Monitoring Data, Proposes to Develop Oil and 
Gas Resources within the 162-911-Acre, Uintah County, UT, Comment 
Period Ends: 07/25/2011, Contact: Stephanie Howard 435-781-4469.
EIS No. 20110181, Final EIS, USACE, LA, New Orleans To Venice (NOV), 
Louisiana, Hurricane Risk Reduction Project, Incorporation of Non-
Federal Levees from Oakville to St. Jude, Plaquemines Parish, LA, 
Review Period Ends: 07/11/2011, Contact: Christopher Koeppel 601-631-
5410.
EIS No. 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, 
Proposed 150 megawatt Solar Energy Generating Facility, 161-kV/230-kV 
Electrical Transmission Tie-Line and 161-kV/230-kV Electrical 
Interconnection Switchyard, Riverside County, CA, Review Period Ends: 
07/11/2011, Contact: Liana Reilly 720-962-7253.

Amended Notices

EIS No. 20110168, Draft Supplement, USFS, ID, Bussel 484 Project Area, 
Updated and New Information, Manage the Project Area to Achieve Desired 
Future Conditions for Vegetation, Fire, Fuels, Recreation, Access, 
Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, 
St. Joe Ranger District, Shoshone County, ID, Comment Period Ends: 07/
18/2011, Contact: Lynette Myhre 208-245-2531.

    Revision to FR Notice Published 06/03/2011: Correction to Contact 
Telephone Number.

    Dated: June 7, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2011-14437 Filed 6-9-11; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.