Florida Power & Light Company, St. Lucie Plant, Unit 1; Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information, 33789-33794 [2011-14262]

Download as PDF Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices Budget (OMB) and solicitation of public comment. The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB’s approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, HighLevel Radioactive Waste and ReactorRelated Greater than Class C Waste. 2. Current OMB approval number: 3150–0132. 3. How often the collection is required: Required reports are collected and evaluated on a continuing basis as events occur; submittal of reports varies from less than one per year under some rule sections to up to an average of about 80 per year under other rule sections. Applications for new licenses, certificates of compliance (CoCs), and amendments may be submitted at anytime; applications for renewal of licenses are required every 40 years for an Independent Spent Fuel Storage Installation (ISFSI) or CoC effective May 21, 2011, and every 40 years for a Monitored Retrievable Storage (MRS) facility. 4. Who is required or asked to report: Certificate holders and applicants for a CoC for spent fuel storage casks; licensees and applicants for a license to possess power reactor spent fuel and other radioactive materials associated with spent fuel storage in an ISFSI; and the Department of Energy for licenses to receive, transfer, package and possess power reactor spent fuel, high-level waste, and other radioactive materials associated with spent fuel and highlevel waste storage in an MRS. 5. The number of annual respondents: 68. 6. The number of hours needed annually to complete the requirement or request: 62,692 hours (26,106 reporting + 33,416 recordkeeping + 3,170 third party disclosure). 7. Abstract: 10 CFR part 72 establishes mandatory requirements, procedures, and criteria for the issuance of licenses to receive, transfer, and possess power reactor spent fuel and other radioactive materials associated with spent fuel storage in an ISFSI, as well as requirements for the issuance of licenses to the Department of Energy to receive, mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 transfer, package, and possess power reactor spent fuel and high-level radioactive waste, and other associated radioactive materials in an MRS. The information in the applications, reports, and records is used by NRC to make licensing and other regulatory determinations. Submit, by August 8, 2011, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC’s Public Document Room, Room O–1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doccomment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC–2011–0009. You may submit your comments by any of the following methods. Electronic comments: Go to https:// www.regulations.gov and search for Docket No. NRC–2011–0009. Mail comments to NRC Clearance Officer, Tremaine Donnell (T–5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. Questions about the information collection requirements may be directed to the NRC Clearance Officer, Tremaine Donnell (T–5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, by telephone at 301– 415–6258, or by e-mail to INFOCOLLECTS.Resource@NRC.GOV. Dated at Rockville, Maryland this 3rd day of June, 2011. PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 33789 For the Nuclear Regulatory Commission. Tremaine Donnell, NRC Clearance Officer, Office of Information Services. [FR Doc. 2011–14213 Filed 6–8–11; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–335; NRC–2011–0128] Florida Power & Light Company, St. Lucie Plant, Unit 1; Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Nuclear Regulatory Commission. ACTION: Notice of license amendment request, opportunity to request a hearing and to petition for leave to intervene, and Commission order. AGENCY: A request for a hearing must be filed by August 8, 2011. Any potential party as defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4 who believes access to sensitive unclassified non-safeguards Information (SUNSI) is necessary to respond to this notice must request document access by June 20, 2011. DATES: Please include Docket ID NRC–2011–0128 in the subject line of your comments. Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site, https:// www.regulations.gov. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed. You may submit comments by any one of the following methods: • Federal rulemaking Web site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC–2011–0128. Address questions about NRC dockets to Carol Gallagher, ADDRESSES: E:\FR\FM\09JNN1.SGM 09JNN1 mstockstill on DSK4VPTVN1PROD with NOTICES 33790 Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices telephone: 301–492–3668; e-mail: Carol.Gallagher@nrc.gov. • Mail comments to: Cindy Bladey, Chief, Rules, Announcements, and Directives Branch (RADB), Office of Administration, Mail Stop: TWB–05– B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. • Fax comments to: RADB at 301– 492–3446. You can access publicly available documents related to this notice using the following methods: • NRC’s Public Document Room (PDR): The public may examine and have copied, for a fee, publicly available documents at the NRC’s PDR, Room O1– F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available online in the NRC Library at https://www.nrc.gov/reading-rm/ adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of the NRC’s public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC’s PDR reference staff at 1–800–397–4209, 301–415–4737, or by e-mail to pdr.resource@nrc.gov. The application for amendment, dated November 22, 2010, contains proprietary information and, accordingly, those portions are being withheld from public disclosure. A redacted version of the application for amendment, dated December 15, 2010, is available electronically under ADAMS Accession No. ML103560418. • Federal rulemaking Web site: Public comments and supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC–2011–0128. FOR FURTHER INFORMATION CONTACT: Tracy J. Orf, Project Manager, Plant Licensing Branch II–2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: 301–415–2788; fax number: 301–415– 2102; e-mail: tracy.orf@nrc.gov. SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an amendment to Facility Operating License No. DPR–67 issued to Florida Power & Light Company (the licensee) VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 for operation of the St. Lucie Plant, Unit 1, located in St. Lucie County, Florida. The proposed amendment would increase the licensed core power level for St. Lucie Plant, Unit 1, from 2700 megawatts thermal (MWt) to 3020 MWt. The increase in core thermal power will be approximately 12 percent, including a 10 percent power uprate and a 1.7 percent measurement uncertainty recapture, over the current licensed core thermal power level and is categorized as an extended power uprate. The proposed amendment would modify the renewed facility operating license and the technical specifications to support operation at the increased core thermal power level. Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission’s regulations. The amendment will not be issued prior to a hearing unless the staff makes a determination that the amendment involves no significant hazards considerations. If a request for a hearing is received, the Commission’s staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92. II. Opportunity To Request a Hearing Requirements for hearing requests and petitions for leave to intervene are found in 10 CFR 2.309, ‘‘Hearing requests, petitions to intervene, requirements for standing, and contentions.’’ Interested persons should consult 10 CFR 2.309, which is available at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852 (or call the PDR at 1–800–397–4209 or 301– 415–4737). The NRC regulations are also accessible online in the NRC’s Library at https://www.nrc.gov/reading-rm/ adams.html. III. Petitions for Leave To Intervene Any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written petition for leave to intervene. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the requestor/petitioner in the proceeding and how that interest may be affected by the results of the proceeding. The petition must provide the name, PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 address, and telephone number of the requestor or petitioner and specifically explain the reasons why the intervention should be permitted with particular reference to the following factors: (1) The nature of the requestor’s/ petitioner’s right under the Act to be made a party to the proceeding; (2) the nature and extent of the requestor’s/ petitioner’s property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor’s/petitioner’s interest. A petition for leave to intervene must also include a specification of the contentions that the petitioner seeks to have litigated in the hearing. For each contention, the requestor/petitioner must provide a specific statement of the issue of law or fact to be raised or controverted, as well as a brief explanation of the basis for the contention. Additionally, the requestor/ petitioner must demonstrate that the issue raised by each contention is within the scope of the proceeding and is material to the findings the NRC must make to support the granting of a license amendment in response to the application. The petition must include a concise statement of the alleged facts or expert opinions which support the position of the requestor/petitioner and on which the requestor/petitioner intends to rely at hearing, together with references to the specific sources and documents on which the requestor/ petitioner intends to rely. Finally, the petition must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact, including references to specific portions of the application for amendment that the requestor/petitioner disputes and the supporting reasons for each dispute, or, if the requestor/petitioner believes that the application for amendment fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the requestor’s/petitioner’s belief. Each contention must be one which, if proven, would entitle the requestor/ petitioner to relief. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person’s admitted contentions, including the opportunity to present evidence and to submit a crossexamination plan for cross-examination of witnesses, consistent with NRC regulations, policies, and procedures. The Atomic Safety and Licensing Board E:\FR\FM\09JNN1.SGM 09JNN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices (the Licensing Board) will set the time and place for any prehearing conferences and evidentiary hearings, and the appropriate notices will be provided. Non-timely petitions for leave to intervene and contentions, amended petitions, and supplemental petitions will not be entertained absent a determination by the Commission, the Licensing Board or a presiding officer that the petition should be granted and/ or the contentions should be admitted based upon a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). A State, county, municipality, Federally-recognized Indian Tribe, or agencies thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(d)(2). The petition should state the nature and extent of the petitioner’s interest in the proceeding. The petition should be submitted to the Commission by August 8, 2011. The petition must be filed in accordance with the filing instructions in Section IV of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that State and Federally-recognized Indian Tribes do not need to address the standing requirements in 10 CFR 2.309(d)(1) if the facility is located within its boundaries. The entities listed above could also seek to participate in a hearing as a nonparty pursuant to 10 CFR 2.315(c). Any person who does not wish, or is not qualified, to become a party to this proceeding may request permission to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to such limits and conditions as may be imposed by the Licensing Board. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission August 8, 2011. If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment. IV. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The EFiling process requires participants to submit and serve all adjudicatory documents over the Internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 301–415–1677, to request (1) A digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public Web site at https:// www.nrc.gov/site-help/e-submittals/ apply-certificates.html. System requirements for accessing the ESubmittal server are detailed in the NRC’s ‘‘Guidance for Electronic Submission,’’ which is available on the NRC’s public Web site at https:// www.nrc.gov/site-help/esubmittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Meta PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 33791 System Help Desk will not be able to offer assistance in using unlisted software. If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC’s online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format in accordance with NRC guidance available on the NRC public Web site at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the agency’s adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ‘‘Contact Us’’ link located on the NRC Web site at https:// www.nrc.gov/site-help/esubmittals.html, by e-mail at MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays. E:\FR\FM\09JNN1.SGM 09JNN1 mstockstill on DSK4VPTVN1PROD with NOTICES 33792 Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First-class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https:// ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as Social Security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Petitions for leave to intervene must be filed by August 8, 2011. Non-timely filings will not be entertained absent a determination by the presiding officer that the petition or request should be granted or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). Attorney for licensee: M.S. Ross, Attorney, Florida Power & Light, P.O. Box 14000, Juno Beach, Florida 33408– 0420. VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 Order Imposing Procedures for Access to Sensitive Unclassified NonSafeguards Information for Contention Preparation A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing sensitive unclassified non-safeguards information (SUNSI). B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party as defined in 10 CFR 2.4 who believes access to SUNSI is necessary to respond to this notice may request such access. A ‘‘potential party’’ is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 10 days after publication will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier. C. The requestor shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555–0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail address for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively.1 The request must include the following information: (1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party’s particularized interest that could be harmed by the action identified in C.(1); and (3) The identity of the individual or entity requesting access to SUNSI and the requestor’s basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention. D. Based on an evaluation of the information submitted under paragraph C.(3) the NRC staff will determine within 10 days of receipt of the request whether: (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and (2) The requestor has established a legitimate need for access to SUNSI. E. If the NRC staff determines that the requestor satisfies both D.(1) and D.(2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI. F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requestor no later than 25 days after the requestor is granted access to that information. However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. G. Review of Denials of Access. (1) If the request for access to SUNSI is denied by the NRC staff either after a determination on standing and need for access, or after a determination on trustworthiness and reliability, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial. (2) The requestor may challenge the NRC staff’s adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) the presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief 1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the initial request to access SUNSI under these procedures should be submitted as described in this paragraph. 2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request. PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 E:\FR\FM\09JNN1.SGM 09JNN1 Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices Administrative Judge, or if he or she is unavailable, another administrative judge, or an administrative law judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer. H. Review of Grants of Access. A party other than the requestor may challenge an NRC staff determination granting access to SUNSI whose release would harm that party’s interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRC staff of its grant of access. If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.3 I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR Part 2. 33793 Attachment 1 to this Order summarizes the general target schedule for processing and resolving requests under these procedures. It is so ordered. Dated at Rockville, Maryland, this 2nd day of June 2011. For the Nuclear Regulatory Commission. Andrew L. Bates, Acting, Secretary of the Commission. Attachment 1—General Target Schedule for Processing and Resolving Requests for Access to Sensitive Unclassified Non-Safeguards Information in This Proceeding Day Event/activity 0 ............... Publication of FEDERAL REGISTER notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests. Deadline for submitting requests for access to sensitive unclassified non-safeguards information (SUNSI) with information: supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply). Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access. Deadline for NRC staff reply to motions to reverse NRC staff determination(s). (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI. If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order. Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI. (Answer receipt +7) Petitioner/Intervenor reply to answers. Decision on contention admission. 10 ............. 60 ............. 20 ............. 25 ............. 30 ............. 40 ............. A .............. A + 3 ........ A + 28 ...... mstockstill on DSK4VPTVN1PROD with NOTICES A + 53 ...... A + 60 ...... >A + 60 .... 3 Requestors should note that the filing requirements of the NRC’s E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 staff determinations (because they must be served on a presiding officer or the Commission, as PO 00000 Frm 00094 Fmt 4703 Sfmt 9990 applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures. E:\FR\FM\09JNN1.SGM 09JNN1 33794 Federal Register / Vol. 76, No. 111 / Thursday, June 9, 2011 / Notices BILLING CODE 7590–01–P and C below, of the most significant aspects of such statements. SECURITIES AND EXCHANGE COMMISSION A. Self-Regulatory Organization’s Statement of the Purpose of, and Statutory Basis for, the Proposed Rule Change [FR Doc. 2011–14262 Filed 6–8–11; 8:45 am] [Release No. 34–64597; File No. SR–CHX– 2011–10] Self-Regulatory Organizations; Chicago Stock Exchange, Incorporated; Notice of Filing and Immediate Effectiveness of Proposed Rule Change Related to Orders That Are Eligible for Entry to the Exchange’s Matching System June 3, 2011. Pursuant to Section 19(b)(1) of the Securities Exchange Act of 1934 (‘‘Act’’) 1 and Rule 19b–4 thereunder,2 notice is hereby given that, on May 31, 2011, the Chicago Stock Exchange, Incorporated (‘‘Exchange’’ or ‘‘CHX’’) filed with the Securities and Exchange Commission (the ‘‘Commission’’) the proposed rule change as described in Items I and II below, which Items have been prepared by the Exchange. The Exchange filed the proposal as a ‘‘noncontroversial’’ proposed rule change pursuant to Section 19(b)(3)(A)(iii) of the Act 3 and Rule 19b–4(f)(6) thereunder.4 The Commission is publishing this notice to solicit comments on the proposed rule change from interested persons. mstockstill on DSK4VPTVN1PROD with NOTICES I. Self-Regulatory Organization’s Statement of the Terms of Substance of the Proposed Rule Change The Exchange proposes to amend CHX Article 20, Rule 4 which governs orders that are eligible for entry to the Exchange’s Matching System. The text of this proposed rule change is available on the Exchange’s Web site at (https:// www.chx.com), at the Exchange’s Office of the Secretary, and in the Commission’s Public Reference Room. II. Self-Regulatory Organization’s Statement of the Purpose of, and Statutory Basis for, the Proposed Rule Change In its filing with the Commission, the CHX included statements concerning the purpose of and basis for the proposed rule change and discussed any comments it received regarding the proposal. The text of these statements may be examined at the places specified in Item IV below. The CHX has prepared summaries, set forth in sections A, B 1 15 U.S.C. 78s(b)(1). CFR 240.19b–4. 3 15 U.S.C. 78s(b)(3)(A)(iii). 4 17 CFR 240.19b–4(f)(6). 2 17 VerDate Mar<15>2010 17:56 Jun 08, 2011 Jkt 223001 1. Purpose The Exchange is proposing to amend CHX Article 20, Rule 4, which governs the basic requirements for order eligibility in the CHX Matching System.5 The rule is essentially broken down into two parts: (i) Basic requirements for an order to be deemed acceptable by the Matching System and (ii) order types and indications that are eligible for entry to and accepted by the Matching System. The Exchange is proposing to amend CHX Article 20, Rule 4 as it pertains to order eligibility by providing the Exchange with the ability to determine on an order type by order type basis which orders and indications are eligible for entry to the Matching System.6 Currently, all orders sent to the Matching System must meet the requirements specified in CHX Article 20, Rule 4(a) and shall be automatically rejected if they do not meet those requirements. In addition, the Matching System will only accept the order types and order indications that are defined in CHX Article 20, Rule 4(b). Currently, by rule the Matching System must accept each and every order type and order indication found in CHX Article 20, Rule 4(b). If the Exchange determines that a certain order type (or order indication) should no longer be eligible for entry into the Matching System, the Exchange would need to submit a formal rule change with the Securities and Exchange Commission (‘‘SEC’’) pursuant to Section 19(b)(1) of the Act 7 and Rule 19b–4 thereunder,8 in order to eliminate such order type from the rule. For purposes of efficiency and flexibility in determining which orders shall be eligible for entry to the Matching System (at any point in time), 5 The CHX Matching System is our core trading facility. See CHX Article 20 generally for the operation of the CHX Matching System. 6 The Chicago Board Options Exchange, Incorporated (‘‘CBOE’’) has similar rules that give the exchange the authority to determine which orders are eligible for its systems. See CBOE Rule 7.4 relating to obligations for orders. Under CBOE Rule 7.4(b)(iii), orders that are eligible to be placed with an Order Book Official or directly into the electronic book include such orders as may be designated by the Exchange. See also CBOE Rule 43.2 relating to the types of orders handled on the CBOE’s Screen Based Trading System (‘‘SBT System’’). Under CBOE Rule 43.2(a), the Exchange has the discretion to determine which orders under the rule may be accommodated on the SBT System. 7 15 U.S.C. 78s(b)(1). 8 17 CFR 240.19b–4. PO 00000 Frm 00095 Fmt 4703 Sfmt 4703 the Exchange is proposing to amend its rule to give the Exchange the ability to turn an order type under CHX Article 20, Rule 4(b) on or off without having to file a formal rule change with the SEC.9 By making this change, the Exchange will be able to designate on an order type by order type basis which orders under CHX Article 20, Rule 4(b) will be eligible for entry to and accepted by the Matching System. Under the proposal, when the Exchange determines to make an order eligible or ineligible under the rule (e.g., turns an order on or off), the Exchange will provide notification of such change to its market participants through the issuance of a regulatory circular and identify which orders under the rule are eligible for entry to the Matching System. Such notification will be provided by the Exchange in a manner which will give reasonable advance notice to its market participants. For example, the Exchange will not designate an order type eligible or ineligible intraday. 2. Statutory Basis The Exchange believes that the proposed rule change is consistent with Section 6(b) of the Act in general,10 and furthers the objectives of Section 6(b)(5) in particular,11 in that it is designed to promote just and equitable principles of trade, to foster cooperation and coordination with persons engaged in facilitating transaction in securities, to remove impediments and perfect the mechanisms of a free and open market, and, in general, to protect investors and the public interest by giving the Exchange the ability to determine which orders under CHX Article 20, Rule 4(b) are eligible for entry to and accepted by the Exchange’s Matching System. The flexibility to turn certain order types on and off will give the Exchange the ability to accept orders into its Matching System that is consistent with order types that are eligible at other market centers. This flexibility will be especially beneficial when the Exchange implements a routing system that routes unexecuted orders to other market centers. For example, certain CHX order types defined in CHX Article 20, Rule 4(b) may not be acceptable at other exchanges and by being able to turn an order on or off will give the Exchange 9 The ability to turn an order on or off is only applicable to those orders found in CHX Article 20, Rule 4(b). If the Exchange determines to introduce a new order type not found in the rule, the Exchange will submit such proposal through the rule filing process to the SEC for consideration and approval. 10 15 U.S.C. 78f(b). 11 15 U.S.C. 78f(b)(5). E:\FR\FM\09JNN1.SGM 09JNN1

Agencies

[Federal Register Volume 76, Number 111 (Thursday, June 9, 2011)]
[Notices]
[Pages 33789-33794]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14262]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-335; NRC-2011-0128]


Florida Power & Light Company, St. Lucie Plant, Unit 1; Notice of 
Consideration of Issuance of Amendment to Facility Operating License, 
and Opportunity for a Hearing and Order Imposing Procedures for 
Document Access to Sensitive Unclassified Non-Safeguards Information

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of license amendment request, opportunity to request a 
hearing and to petition for leave to intervene, and Commission order.

-----------------------------------------------------------------------

DATES: A request for a hearing must be filed by August 8, 2011. Any 
potential party as defined in Title 10 of the Code of Federal 
Regulations (10 CFR) 2.4 who believes access to sensitive unclassified 
non-safeguards Information (SUNSI) is necessary to respond to this 
notice must request document access by June 20, 2011.

ADDRESSES: Please include Docket ID NRC-2011-0128 in the subject line 
of your comments. Comments submitted in writing or in electronic form 
will be posted on the NRC Web site and on the Federal rulemaking Web 
site, https://www.regulations.gov. Because your comments will not be 
edited to remove any identifying or contact information, the NRC 
cautions you against including any information in your submission that 
you do not want to be publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.
    You may submit comments by any one of the following methods:
     Federal rulemaking Web site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0128. Address questions about NRC dockets to Carol Gallagher,

[[Page 33790]]

telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov.
     Mail comments to: Cindy Bladey, Chief, Rules, 
Announcements, and Directives Branch (RADB), Office of Administration, 
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
     Fax comments to: RADB at 301-492-3446.
    You can access publicly available documents related to this notice 
using the following methods:
     NRC's Public Document Room (PDR): The public may examine 
and have copied, for a fee, publicly available documents at the NRC's 
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, 
Rockville, Maryland 20852.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): Publicly available documents created or received at the NRC 
are available online in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, 
which provides text and image files of the NRC's public documents. If 
you do not have access to ADAMS or if there are problems in accessing 
the documents located in ADAMS, contact the NRC's PDR reference staff 
at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. 
The application for amendment, dated November 22, 2010, contains 
proprietary information and, accordingly, those portions are being 
withheld from public disclosure. A redacted version of the application 
for amendment, dated December 15, 2010, is available electronically 
under ADAMS Accession No. ML103560418.
     Federal rulemaking Web site: Public comments and 
supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC-2011-0128.

FOR FURTHER INFORMATION CONTACT: Tracy J. Orf, Project Manager, Plant 
Licensing Branch II-2, Division of Operating Reactor Licensing, Office 
of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555. Telephone: 301-415-2788; fax number: 301-415-
2102; e-mail: tracy.orf@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Introduction

    The U.S. Nuclear Regulatory Commission (NRC or the Commission) is 
considering issuance of an amendment to Facility Operating License No. 
DPR-67 issued to Florida Power & Light Company (the licensee) for 
operation of the St. Lucie Plant, Unit 1, located in St. Lucie County, 
Florida.
    The proposed amendment would increase the licensed core power level 
for St. Lucie Plant, Unit 1, from 2700 megawatts thermal (MWt) to 3020 
MWt. The increase in core thermal power will be approximately 12 
percent, including a 10 percent power uprate and a 1.7 percent 
measurement uncertainty recapture, over the current licensed core 
thermal power level and is categorized as an extended power uprate. The 
proposed amendment would modify the renewed facility operating license 
and the technical specifications to support operation at the increased 
core thermal power level.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    The amendment will not be issued prior to a hearing unless the 
staff makes a determination that the amendment involves no significant 
hazards considerations. If a request for a hearing is received, the 
Commission's staff may issue the amendment after it completes its 
technical review and prior to the completion of any required hearing if 
it publishes a further notice for public comment of its proposed 
finding of no significant hazards consideration in accordance with 10 
CFR 50.91 and 50.92.

II. Opportunity To Request a Hearing

    Requirements for hearing requests and petitions for leave to 
intervene are found in 10 CFR 2.309, ``Hearing requests, petitions to 
intervene, requirements for standing, and contentions.'' Interested 
persons should consult 10 CFR 2.309, which is available at the NRC's 
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, 
Rockville, Maryland 20852 (or call the PDR at 1-800-397-4209 or 301-
415-4737). The NRC regulations are also accessible online in the NRC's 
Library at https://www.nrc.gov/reading-rm/adams.html.

III. Petitions for Leave To Intervene

    Any person whose interest may be affected by this proceeding and 
who wishes to participate as a party in the proceeding must file a 
written petition for leave to intervene. As required by 10 CFR 2.309, a 
petition for leave to intervene shall set forth with particularity the 
interest of the requestor/petitioner in the proceeding and how that 
interest may be affected by the results of the proceeding. The petition 
must provide the name, address, and telephone number of the requestor 
or petitioner and specifically explain the reasons why the intervention 
should be permitted with particular reference to the following factors: 
(1) The nature of the requestor's/petitioner's right under the Act to 
be made a party to the proceeding; (2) the nature and extent of the 
requestor's/petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any decision or order which 
may be entered in the proceeding on the requestor's/petitioner's 
interest.
    A petition for leave to intervene must also include a specification 
of the contentions that the petitioner seeks to have litigated in the 
hearing. For each contention, the requestor/petitioner must provide a 
specific statement of the issue of law or fact to be raised or 
controverted, as well as a brief explanation of the basis for the 
contention. Additionally, the requestor/petitioner must demonstrate 
that the issue raised by each contention is within the scope of the 
proceeding and is material to the findings the NRC must make to support 
the granting of a license amendment in response to the application. The 
petition must include a concise statement of the alleged facts or 
expert opinions which support the position of the requestor/petitioner 
and on which the requestor/petitioner intends to rely at hearing, 
together with references to the specific sources and documents on which 
the requestor/petitioner intends to rely. Finally, the petition must 
provide sufficient information to show that a genuine dispute exists 
with the applicant on a material issue of law or fact, including 
references to specific portions of the application for amendment that 
the requestor/petitioner disputes and the supporting reasons for each 
dispute, or, if the requestor/petitioner believes that the application 
for amendment fails to contain information on a relevant matter as 
required by law, the identification of each failure and the supporting 
reasons for the requestor's/petitioner's belief. Each contention must 
be one which, if proven, would entitle the requestor/petitioner to 
relief.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The Atomic 
Safety and Licensing Board

[[Page 33791]]

(the Licensing Board) will set the time and place for any prehearing 
conferences and evidentiary hearings, and the appropriate notices will 
be provided.
    Non-timely petitions for leave to intervene and contentions, 
amended petitions, and supplemental petitions will not be entertained 
absent a determination by the Commission, the Licensing Board or a 
presiding officer that the petition should be granted and/or the 
contentions should be admitted based upon a balancing of the factors 
specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A State, county, municipality, Federally-recognized Indian Tribe, 
or agencies thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(d)(2). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by 
August 8, 2011. The petition must be filed in accordance with the 
filing instructions in Section IV of this document, and should meet the 
requirements for petitions for leave to intervene set forth in this 
section, except that State and Federally-recognized Indian Tribes do 
not need to address the standing requirements in 10 CFR 2.309(d)(1) if 
the facility is located within its boundaries. The entities listed 
above could also seek to participate in a hearing as a nonparty 
pursuant to 10 CFR 2.315(c).
    Any person who does not wish, or is not qualified, to become a 
party to this proceeding may request permission to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
position on the issues, but may not otherwise participate in the 
proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to such limits and 
conditions as may be imposed by the Licensing Board. Persons desiring 
to make a limited appearance are requested to inform the Secretary of 
the Commission August 8, 2011.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, then any hearing 
held would take place before the issuance of any amendment.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the Internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by e-mail at 
hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1) 
A digital identification (ID) certificate, which allows the participant 
(or its counsel or representative) to digitally sign documents and 
access the E-Submittal server for any proceeding in which it is 
participating; and (2) advise the Secretary that the participant will 
be submitting a request or petition for hearing (even in instances in 
which the participant, or its counsel or representative, already holds 
an NRC-issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the NRC's public Web 
site at https://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format in accordance with NRC guidance available on 
the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.

[[Page 33792]]

    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First-class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking and Adjudications Staff. Participants 
filing a document in this manner are responsible for serving the 
document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as Social Security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed by August 8, 2011. 
Non-timely filings will not be entertained absent a determination by 
the presiding officer that the petition or request should be granted or 
the contentions should be admitted, based on a balancing of the factors 
specified in 10 CFR 2.309(c)(1)(i)-(viii).
    Attorney for licensee: M.S. Ross, Attorney, Florida Power & Light, 
P.O. Box 14000, Juno Beach, Florida 33408-0420.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing sensitive 
unclassified non-safeguards information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party as 
defined in 10 CFR 2.4 who believes access to SUNSI is necessary to 
respond to this notice may request such access. A ``potential party'' 
is any person who intends to participate as a party by demonstrating 
standing and filing an admissible contention under 10 CFR 2.309. 
Requests for access to SUNSI submitted later than 10 days after 
publication will not be considered absent a showing of good cause for 
the late filing, addressing why the request could not have been filed 
earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) the presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief

[[Page 33793]]

Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR Part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.

    Dated at Rockville, Maryland, this 2nd day of June 2011.

    For the Nuclear Regulatory Commission.
Andrew L. Bates,
Acting, Secretary of the Commission.

Attachment 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in This Proceeding

------------------------------------------------------------------------
          Day                            Event/activity
------------------------------------------------------------------------
0.....................  Publication of Federal Register notice of
                         hearing and opportunity to petition for leave
                         to intervene, including order with instructions
                         for access requests.
10....................  Deadline for submitting requests for access to
                         sensitive unclassified non-safeguards
                         information (SUNSI) with information:
                         supporting the standing of a potential party
                         identified by name and address; describing the
                         need for the information in order for the
                         potential party to participate meaningfully in
                         an adjudicatory proceeding.
60....................  Deadline for submitting petition for
                         intervention containing: (i) Demonstration of
                         standing; (ii) all contentions whose
                         formulation does not require access to SUNSI
                         (+25 Answers to petition for intervention; +7
                         requestor/petitioner reply).
20....................  Nuclear Regulatory Commission (NRC) staff
                         informs the requestor of the staff's
                         determination whether the request for access
                         provides a reasonable basis to believe standing
                         can be established and shows need for SUNSI.
                         (NRC staff also informs any party to the
                         proceeding whose interest independent of the
                         proceeding would be harmed by the release of
                         the information.) If NRC staff makes the
                         finding of need for SUNSI and likelihood of
                         standing, NRC staff begins document processing
                         (preparation of redactions or review of
                         redacted documents).
25....................  If NRC staff finds no ``need'' or no likelihood
                         of standing, the deadline for requestor/
                         petitioner to file a motion seeking a ruling to
                         reverse the NRC staff's denial of access; NRC
                         staff files copy of access determination with
                         the presiding officer (or Chief Administrative
                         Judge or other designated officer, as
                         appropriate). If NRC staff finds ``need'' for
                         SUNSI, the deadline for any party to the
                         proceeding whose interest independent of the
                         proceeding would be harmed by the release of
                         the information to file a motion seeking a
                         ruling to reverse the NRC staff's grant of
                         access.
30....................  Deadline for NRC staff reply to motions to
                         reverse NRC staff determination(s).
40....................  (Receipt +30) If NRC staff finds standing and
                         need for SUNSI, deadline for NRC staff to
                         complete information processing and file motion
                         for Protective Order and draft Non-Disclosure
                         Affidavit. Deadline for applicant/licensee to
                         file Non-Disclosure Agreement for SUNSI.
A.....................  If access granted: Issuance of presiding officer
                         or other designated officer decision on motion
                         for protective order for access to sensitive
                         information (including schedule for providing
                         access and submission of contentions) or
                         decision reversing a final adverse
                         determination by the NRC staff.
A + 3.................  Deadline for filing executed Non-Disclosure
                         Affidavits. Access provided to SUNSI consistent
                         with decision issuing the protective order.
A + 28................  Deadline for submission of contentions whose
                         development depends upon access to SUNSI.
                         However, if more than 25 days remain between
                         the petitioner's receipt of (or access to) the
                         information and the deadline for filing all
                         other contentions (as established in the notice
                         of hearing or opportunity for hearing), the
                         petitioner may file its SUNSI contentions by
                         that later deadline.
A + 53................  (Contention receipt +25) Answers to contentions
                         whose development depends upon access to SUNSI.
A + 60................  (Answer receipt +7) Petitioner/Intervenor reply
                         to answers.
>A + 60...............  Decision on contention admission.
------------------------------------------------------------------------


[[Page 33794]]

[FR Doc. 2011-14262 Filed 6-8-11; 8:45 am]
BILLING CODE 7590-01-P