Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (Renewal), 33274-33275 [2011-14196]

Download as PDF 33274 Federal Register / Vol. 76, No. 110 / Wednesday, June 8, 2011 / Notices and Organizations, State, Local or Tribal Governments. Estimated Number of Respondents (for each ICR): 15,720. Frequency of Response: Once, On occasion. Estimated Total Annual Hour Burden (for each ICR): 1,386. Estimated Total Annual Cost: $0, includes $0 annualized capital or O&M costs. Changes in the Estimates: These are new ICRs. Dated: May 31, 2011. John Moses, Director, Collection Strategies Division. [FR Doc. 2011–14194 Filed 6–7–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2010–0353; FRL–9316–2] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost. DATES: Additional comments may be submitted on or before July 8, 2011. ADDRESSES: Submit your comments, referencing docket ID number EPA–HQ– OECA–2010–0353, to (1) EPA online using https://www.regulations.gov (our preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 28221T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: Learia A. Williams, Monitoring, sroberts on DSK5SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 21:51 Jun 07, 2011 Jkt 223001 Assistance, and Media Programs Division, Office of Compliance, Mail Code 2223A, Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; telephone number: (202) 564–4113; fax number: (202) 564–0050; e-mail address: williams.learia@epa.gov. EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On June 2, 2010 (75 FR 30813), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional comments on this ICR should be submitted to EPA and OMB within 30 days of this notice. EPA has established a public docket for this ICR under docket ID number EPA–HQ–OECA–2010–0353, which is available for public viewing online at https://www.regulations.gov, or in person viewing at the Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue, NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566–1744, and the telephone number for the Enforcement and Compliance Docket is (202) 566–1752. Use EPA’s electronic docket and comment system at https:// www.regulations.gov, to either submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the docket that are available electronically. Once in the system, select ‘‘docket search,’’ then key in the docket ID number identified above. Please note that EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing at https://www.regulations.gov as EPA receives them and without change, unless the comment contains copyrighted material, Confidential Business Information (CBI), or other information whose public disclosure is restricted by statute. For further information about the electronic docket, go to https://www.regulations.gov. Title: NESHAP for Area Sources: Electric Arc Furnace Steelmaking Facilities (Renewal). ICR Numbers: EPA ICR Number 2277.03, OMB Control Number 2060– 0608. ICR Status: This ICR is scheduled to expire on July 31, 2011. Under OMB regulations, the Agency may continue to conduct or sponsor the collection of SUPPLEMENTARY INFORMATION: PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 information while this submission is pending at OMB. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA’s regulations in title 40 of the CFR, after appearing in the Federal Register when approved, are listed in 40 CFR part 9, and displayed either by publication in the Federal Register or by other appropriate means, such as on the related collection instrument or form, if applicable. The display of OMB control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions specified at 40 CFR part 63, subpart YYYYY. Owners or operators of the affected facilities must submit a one-time-only report of any physical or operational changes, initial performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually. Burden Statement: The annual public reporting and recordkeeping burden for this collection of information is estimated to average 8 hours per response. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements which have subsequently changed; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. Respondents/Affected Entities: Owners or operators of electric arc furnace steelmaking facilities. Estimated Number of Respondents: 91. Frequency of Response: Initially, semiannually and occasionally. Estimated Total Annual Hour Burden: 1,481. E:\FR\FM\08JNN1.SGM 08JNN1 Federal Register / Vol. 76, No. 110 / Wednesday, June 8, 2011 / Notices Estimated Total Annual Cost: $138,991, which includes $138,991 in labor costs, no capital/startup costs, and no operating and maintenance (O&M) costs. Changes in the Estimates: There is a decrease in Respondent labor hours and an increase in labor cost. This is due to the fact that the rule for this subpart is now fully implemented. The previous ICR covered the initial phase of standard implementation which occurred over a three-year period. This ICR shows the labor hour and cost burden after full implementation. There have been no program changes. Dated: May 31, 2011. John Moses, Director, Collection Strategies Division. [FR Doc. 2011–14196 Filed 6–7–11; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2010–0358; FRL–9316–3] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Portland Cement Plants (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR which is abstracted below describes the nature of the collection and the estimated burden and cost. DATES: Additional comments may be submitted on or before July 8, 2011. ADDRESSES: Submit your comments, referencing docket ID number EPA–HQ– OECA–2010–0358 to: (1) EPA online using https://www.regulations.gov (our preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to: EPA Docket Center (EPA/DC), Environmental Protection Agency, Enforcement and Compliance Docket and Information Center, mail code 28221T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; or (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. sroberts on DSK5SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 21:51 Jun 07, 2011 Jkt 223001 FOR FURTHER INFORMATION CONTACT: Learia A. Williams, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2223A, Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; telephone number: (202) 564–4113; fax number: (202) 564–0050; e-mail address: williams.learia@epa.gov. EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On June 2, 2010 (75 FR 30813), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional comments on this ICR should be submitted to EPA and OMB within 30 days of this notice. EPA has established a public docket for this ICR under docket ID number EPA–HQ–OECA–2010–0358, which is available for public viewing online at https://www.regulations.gov, or in person viewing at the Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue, NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566–1744, and the telephone number for the Enforcement and Compliance Docket is (202) 566–1752. Use EPA’s electronic docket and comment system at https:// www.regulations.gov to submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the docket that are available electronically. Once in the system, select ‘‘docket search,’’ then key in the docket ID number identified above. Please note that EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing at https://www.regulations.gov, as EPA receives them and without change, unless the comment contains copyrighted material, Confidential Business Information (CBI), or other information whose public disclosure is restricted by statute. For further information about the electronic docket, go to https://www.regulations.gov. Title: NSPS for Portland Cement Plants (Renewal). ICR Numbers: EPA ICR Number 1051.11, OMB Control Number 2060– 0025. ICR Status: This ICR is schedule to expire on July 31, 2011. Under OMB regulations, the Agency may continue to conduct or sponsor the collection of SUPPLEMENTARY INFORMATION: PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 33275 information while this submission is pending at OMB. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA’s regulations in title 40 of the CFR, after appearing in the Federal Register when approved, are listed in 40 CFR part 9, and displayed either by publication in the Federal Register or by other appropriate means, such as on the related collection instrument or form, if applicable. The display of OMB control numbers in certain- EPA regulations is consolidated in 40 CFR part 9. Abstract: The New Source Performance Standards (NSPS) for Portland Cement Plants were proposed on August 17, 1971, promulgated on December 23, 1971, and amended on December 14, 1988, October 17, 2000, and September 9, 2010. Particulate matter emissions from Portland cement plants either cause or contribute to air pollution that may reasonably be anticipated to endanger public health or welfare. The control of emissions of particulate matter from Portland cement plants requires not only the installation of properly designed equipment, but also the operation and maintenance of that equipment. Emissions of particulate matter from Portland cement plants are the result of operation of kilns, clinker coolers, raw mill systems, raw mill dryers, raw material storage, clinker storage, finished product storage, conveyor transfer points, bagging and bulk loading and unloading systems. These standards rely on the capture of particulate emissions by a baghouse or electrostatic precipitator. In order to ensure compliance with these standards, adequate reporting and recordkeeping is necessary. In the absence of such information, enforcement personnel would be unable to determine whether the standards are being met on a continuous basis, as required by the Clean Air Act. Any owner or operator subject to the provisions of this part shall maintain a file of these measurements, and retain the file for at least two years following the date of such measurements, maintenance reports, and records. All reports are sent to the delegated state or local authority. In the event that there is no such delegated authority, the reports are sent directly to the EPA regional office. This information is being collected to assure compliance with 40 CFR part 60, subpart F and 40 CFR part 60, Subpart A, as authorized in section 112 and 114(a) of the Clean Air Act. The required information E:\FR\FM\08JNN1.SGM 08JNN1

Agencies

[Federal Register Volume 76, Number 110 (Wednesday, June 8, 2011)]
[Notices]
[Pages 33274-33275]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-14196]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2010-0353; FRL-9316-2]


Agency Information Collection Activities; Submission to OMB for 
Review and Approval; Comment Request; NESHAP for Area Sources: Electric 
Arc Furnace Steelmaking Facilities (Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 
et seq.), this document announces that an Information Collection 
Request (ICR) has been forwarded to the Office of Management and Budget 
(OMB) for review and approval. This is a request to renew an existing 
approved collection. The ICR which is abstracted below describes the 
nature of the collection and the estimated burden and cost.

DATES: Additional comments may be submitted on or before July 8, 2011.

ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2010-0353, to (1) EPA online using https://www.regulations.gov (our 
preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to: 
EPA Docket Center (EPA/DC), Environmental Protection Agency, 
Enforcement and Compliance Docket and Information Center, mail code 
28221T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) 
OMB at: Office of Information and Regulatory Affairs, Office of 
Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th 
Street, NW., Washington, DC 20503.

FOR FURTHER INFORMATION CONTACT: Learia A. Williams, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2223A, Environmental Protection Agency, 1200 Pennsylvania Avenue, 
NW., Washington, DC 20460; telephone number: (202) 564-4113; fax 
number: (202) 564-0050; e-mail address: williams.learia@epa.gov.

SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB 
for review and approval according to the procedures prescribed in 5 CFR 
1320.12. On June 2, 2010 (75 FR 30813), EPA sought comments on this ICR 
pursuant to 5 CFR 1320.8(d). EPA received no comments. Any additional 
comments on this ICR should be submitted to EPA and OMB within 30 days 
of this notice.
    EPA has established a public docket for this ICR under docket ID 
number EPA-HQ-OECA-2010-0353, which is available for public viewing 
online at https://www.regulations.gov, or in person viewing at the 
Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC), 
EPA West, Room 3334, 1301 Constitution Avenue, NW., Washington, DC. The 
EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 
p.m., Monday through Friday, excluding legal holidays. The telephone 
number for the Reading Room is (202) 566-1744, and the telephone number 
for the Enforcement and Compliance Docket is (202) 566-1752.
    Use EPA's electronic docket and comment system at https://www.regulations.gov, to either submit or view public comments, access 
the index listing of the contents of the docket, and to access those 
documents in the docket that are available electronically. Once in the 
system, select ``docket search,'' then key in the docket ID number 
identified above. Please note that EPA's policy is that public 
comments, whether submitted electronically or in paper, will be made 
available for public viewing at https://www.regulations.gov as EPA 
receives them and without change, unless the comment contains 
copyrighted material, Confidential Business Information (CBI), or other 
information whose public disclosure is restricted by statute. For 
further information about the electronic docket, go to https://www.regulations.gov.
    Title: NESHAP for Area Sources: Electric Arc Furnace Steelmaking 
Facilities (Renewal).
    ICR Numbers: EPA ICR Number 2277.03, OMB Control Number 2060-0608.
    ICR Status: This ICR is scheduled to expire on July 31, 2011. Under 
OMB regulations, the Agency may continue to conduct or sponsor the 
collection of information while this submission is pending at OMB. An 
agency may not conduct or sponsor, and a person is not required to 
respond to, a collection of information unless it displays a currently 
valid OMB control number. The OMB control numbers for EPA's regulations 
in title 40 of the CFR, after appearing in the Federal Register when 
approved, are listed in 40 CFR part 9, and displayed either by 
publication in the Federal Register or by other appropriate means, such 
as on the related collection instrument or form, if applicable. The 
display of OMB control numbers in certain EPA regulations is 
consolidated in 40 CFR part 9.
    Abstract: The affected entities are subject to the General 
Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, 
or additions specified at 40 CFR part 63, subpart YYYYY. Owners or 
operators of the affected facilities must submit a one-time-only report 
of any physical or operational changes, initial performance tests, and 
periodic reports and results. Owners or operators are also required to 
maintain records of the occurrence and duration of any startup, 
shutdown, or malfunction in the operation of an affected facility, or 
any period during which the monitoring system is inoperative. Reports, 
at a minimum, are required semiannually.
    Burden Statement: The annual public reporting and recordkeeping 
burden for this collection of information is estimated to average 8 
hours per response. Burden means the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. This 
includes the time needed to review instructions; develop, acquire, 
install, and utilize technology and systems for the purposes of 
collecting, validating, and verifying information, processing and 
maintaining information, and disclosing and providing information; 
adjust the existing ways to comply with any previously applicable 
instructions and requirements which have subsequently changed; train 
personnel to be able to respond to a collection of information; search 
data sources; complete and review the collection of information; and 
transmit or otherwise disclose the information.
    Respondents/Affected Entities: Owners or operators of electric arc 
furnace steelmaking facilities.
    Estimated Number of Respondents: 91.
    Frequency of Response: Initially, semiannually and occasionally.
    Estimated Total Annual Hour Burden: 1,481.

[[Page 33275]]

    Estimated Total Annual Cost: $138,991, which includes $138,991 in 
labor costs, no capital/startup costs, and no operating and maintenance 
(O&M) costs.
    Changes in the Estimates: There is a decrease in Respondent labor 
hours and an increase in labor cost. This is due to the fact that the 
rule for this subpart is now fully implemented. The previous ICR 
covered the initial phase of standard implementation which occurred 
over a three-year period. This ICR shows the labor hour and cost burden 
after full implementation. There have been no program changes.

    Dated: May 31, 2011.
John Moses, Director,
Collection Strategies Division.
[FR Doc. 2011-14196 Filed 6-7-11; 8:45 am]
BILLING CODE 6560-50-P