Environmental Impact Statements; Notice of Availability, 32197-32198 [2011-13820]
Download as PDF
32197
Federal Register / Vol. 76, No. 107 / Friday, June 3, 2011 / Notices
in the docket index available at https://
www.regulations.gov. Although listed in
the index, some information is not
publicly available, e.g., Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available electronically at
https://www.regulations.gov, or, if only
available in hard copy, at the OPPT
Docket. The OPPT Docket is located in
the EPA Docket Center (EPA/DC) at Rm.
3334, EPA West Bldg., 1301
Constitution Ave., NW., Washington,
Received
date
Case No.
Projected
Notice end
date
DC. The EPA/DC Public Reading Room
hours of operation are 8:30 a.m. to 4:30
p.m., Monday through Friday, excluding
legal holidays. The telephone number of
the EPA/DC Public Reading Room is
(202) 566–1744, and the telephone
number for the OPPT Docket is (202)
566–0280. Docket visitors are required
to show photographic identification,
pass through a metal detector, and sign
the EPA visitor log. All visitor bags are
processed through an X-ray machine
and subject to search. Visitors will be
provided an EPA/DC badge that must be
visible at all times in the building and
returned upon departure.
II. What does this correction do?
In the preamble for FR Doc. 2011–
8574 published in the Federal Register
of April 15, 2011 (76 FR 21339) (FRL–
8869–4), the premanufacture notices P–
11–0022 through P–11–0026
inadvertently contained incorrect
chemicals which are corrected as
follows:
On page 21340, under Table I. the
entries for P–11–0022, P–11–0023, and
P–11–0024 and on page 21341, P–11–
0025 and P–11–0026 are corrected to
read:
Manufacturer/importer
Use
Chemical
(S) 2-propenoic acid, 2-methyl-, 2-hydroxyethyl ester, polymer with rel(1r,2r,4r)-1,7,7trimethylbicyclo[2.2.1]hept-2-yl 2methyl-2-propenoate
and
rel(1r,2r,4r)—1,7,7trimethylbicyclo[2.2.1]hept-2-yl 2propenoate*.
(S) Boron, trifluoro(tetrahydrofuran)-,
(t-4)-, polymer with 3-methyl-3[(2,2,2trifluoroethoxy)methyl]oxetane,
ether
with
2,2-dimethyl-1,3propanediol (2:1)*.
(S) Boron, trifluoro(tetrahydrofuran)-,
(t-4)-, polymer with 3-methyl-3[(2,2,3,3,3pentafluoropropoxy)methyl]oxtane,
ether
with
2,2-dimethyl-1,3propanediol (2:1)*.
(S) Boron, trifluoro(tetrahydrofuran)-,
(t-4)-, polymer with 3-methyl-3[(2,2,3,3,3pentafluoropropoxy)methyl]oxetane,
mono(2,2,2trifluoroethyl) ether*.
(S) Boron, trifluoro(tetrahydrofuran)-,
(t-4)-, polymer with 3-methyl-3[(3,3,4,4,5,5,6,6,6nonafluorohexly)oxy]methyl]oxetane, ether with
2,2-dimethyl-1,3-propanediol(2:1)*.
P–11–0022 ....
10/12/10
01/09/11
Akzo Nobel Coatings Inc.
(S) Designated use of this polymer is
for refinishing vehicles. through the
hydroxyl groups on the polymer,
the coating is crosslinked with a
polyisocyanate..
P–11–0023 ....
10/13/10
01/10/11
Omnova Solutions
Inc.
(S) Intermediate in the production of
functionalized polymers; surfactant,
flow, leveling, and wetting additive
for solvent borne coatings.
P–11–0024 ....
10/13/10
01/10/11
Omnova Solutions
Inc.
(S) Intermediate in the production of
functionalized polymers; surfactant,
flow, leveling, and wetting additive
for solvent borne coatings.
P–11–0025 ....
10/13/10
01/10/11
Omnova Solutions
Inc.
(S) Intermediate in the production of
functionalized polymers; surfactant,
flow, leveling, and wetting agent
borne coatings.
P–11–0026 ....
10/13/10
01/10/11
Omnova Solutions
Inc.
(S) Intermediate in the production of
functionalized polymers; surfactant,
flow, leveling, and wetting agent
borne coatings.
List of Subjects
jlentini on DSK4TPTVN1PROD with NOTICES
Environmental protection, Chemicals,
Hazardous substances, Imports, Notice
of commencement, Premanufacturer,
Reporting and recordkeeping
requirements, Test marketing
exemptions.
Dated: May 23, 2011.
Matthew Leopard,
Director, Information Management Division,
Office of Pollution Prevention and Toxics.
[FR Doc. 2011–13673 Filed 6–2–11; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
15:49 Jun 02, 2011
Jkt 223001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8997–3]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 05/23/2011 Through 05/27/2011
Pursuant to 40 CFR 1506.9
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
Notice: In accordance with Section
309(a) of the Clean Air Act, EPA is
required to make its comments on EISs
issued by other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the website
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
E:\FR\FM\03JNN1.SGM
03JNN1
jlentini on DSK4TPTVN1PROD with NOTICES
32198
Federal Register / Vol. 76, No. 107 / Friday, June 3, 2011 / Notices
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110167, Revised Final EIS,
USFS, MT, Bozeman Municipal
Watershed Project, New Information
to Address New Additions to the
Sensitive Species List, To Implement
Fuel Reduction Activities, Bozeman
Ranger District, Gallatin National
Forest, City of Bozeman Municipal
Watershed, Gallatin County, MT,
Review Period Ends: 07/18/2011,
Contact: Teri Seth 406–522–2520.
EIS No. 20110168, Draft Supplement,
USFS, ID, Bussel 484 Project Area,
Updated and New Information,
Manage the Project Area to Achieve
Desired Future Conditions for
Vegetation, Fire, Fuels, Recreation,
Access, Wildlife, Fisheries, Soil and
Water, Idaho Panhandle National
Forest, St. Joe Ranger District,
Shoshone County, ID, Comment
Period Ends: 07/18/2011, Contact:
Lynette Myhre 208–245–1531.
EIS No. 20110169, Draft EIS, BLM, UT,
Sigurd to Red Butte No. 2–345Kv
Transmission Project, Construct,
Operate, and Maintain a Single—
Circuit 345 Kv Transmission Line,
Issue of Right-of-Way Grant by BLM
and Special-Use-Permit by AFS,
Sevier and Washington Counties, UT,
Comment Period Ends: 07/18/2011,
Contact: Tamara Gertsch 307–775–
61115.
EIS No. 20110170, Draft EIS, USACE,
FL, St Lucie County South Beach and
Dune Restoration Project, To Restore
Recreational Beach, Restore Beach
and Habitat, and Reduce Storm
Damage Due to Beach Erosion, St.
Lucie County, FL, Comment Period
Ends: 07/18/2011, Contact: Garett
Lips 561–472–3519.
EIS No. 20110171, Draft EIS, USFS, ID,
Lower Orogrande Project, Proposes
Watershed Improvement Timber
Harvest and Wildlife Habitat
Enhancement Activities, North Fork
Ranger District, Clearwater National
Forest, Clearwater County, ID,
Comment Period Ends: 07/18/2011,
Contact: George Harbaugh 208–935–
4260.
EIS No. 20110172, Final EIS, USFS, CA,
Mudflow Vegetation Management
Project, To Improve or Sustain the
Health and Resiliency of the Forest
and Reduce the Risk of Standreplacing Wildfire, Siskiyou County,
CA, Review Period Ends: 07/05/2011,
Contact: Christine Jordan 530–964–
3771.
EIS No. 20110173, Final EIS, GSA, CA,
Calexico West Land Port of Entry in
VerDate Mar<15>2010
15:49 Jun 02, 2011
Jkt 223001
Calexico, Expansion of
Reconfiguration, Implementation, CA,
Review Period Ends: 07/05/2011,
Contact: Maureen Sheehan 253–931–
7548.
EIS No. 20110174, Draft EIS, USFS, 00,
George Washington National Forest
Land and Resource Management
Project, Implementation, Alleghany,
Amherst, Augusta, Bath, Botetourt,
Frederick, Highland, Nelson, Page,
Rockbridge, Rockingham,
Shenandoah, and Warren Counties
VA and Hampshire, Hardy, Monroe,
and Pendleton Counties, WV,
Comment Period Ends: 09/01/2011,
Contact: Karen Overcash 540–265–
5175.
EIS No. 20110175, Final EIS, WAPA,
SD, Groton Generation Station (GGS)
Project, Proposes to Modify its
Interconnection Agreement, Basin
Electric Power Cooperative, for the
(GGS) to Eliminate 50-Megawatts
(MW) Annual Average Operating
Limit, Brown County, SD, Review
Period Ends: 07/05/2011, Contact:
Erika Walters 720–962–7279.
Amended Notices
EIS No. 20110106, Draft EIS, BIA, NM,
Pueblo of Jemez 70.277 Acre Fee-ToTrust Transfer and Casino Project,
Implementation, Dona Ana County,
NM, Comment Period Ends: 07/01/
2011, Contact: Priscilla Wade 505–
563–3417. Revision to FR Notice
Published 04/08/2011: Extending
Comment Period from 06/01/2011 to
07/01/2011.
EIS No. 20110108, Draft EIS, USFS, OR,
Kapka Butte Sno-Park Project,
Proposal to Build a New Sno-Park to
Provide more High-Elevation Parking
for Winter Recreationist, Bend-Ft.
Rock Ranger District, Deschutes
National Forest, Deschutes County,
OR, Comment Period Ends: 06/30/
2011, Contact: Beth Peer 541–383–
4769 Revision to Notice Published 04/
15/2011: Extending Comment Period
from 05/30/2011 to 06/30/2011.
EIS No. 20110121, Draft EIS, USA, CA,
Presidio of Monterey Installation
(POM) Project, To Implement the Real
Property Master Plan, Monterey
County, CA, Comment Period Ends:
06/21/2011, Contact: Michelle Royal
210–424–8331 Revision to FR Notice
Published 04/22/2011: Extending
Comment Period from 06/06/2011 to
06/21/2011.
Dated: May 31, 2011.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–13820 Filed 6–2–11; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9315–4]
Science Advisory Board Staff Office
Notification of a Joint Public Meeting
of the Chartered Science Advisory
Board and Board of Scientific
Counselors
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
The Environmental Protection
Agency (EPA) Science Advisory Board
(SAB) Staff Office announces a joint
public meeting of the Chartered SAB
and Board of Scientific Counselors
(BOSC) to hold discussions with EPA
regarding the Office of Research and
Development’s (ORD’s) new strategic
directions for research.
DATES: The public meeting will be held
on Wednesday, June 29, 2011 from 8:30
a.m. to 5:30 p.m. and Thursday, June 30,
2011 from 9 a.m. to 4 p.m. (Eastern
Daylight Time).
ADDRESSES: The meeting will be held at
the Embassy Suites Hotel, 201 Harrison
Oaks Boulevard, Cary, North Carolina
27513.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wishes
further information concerning the
meeting may contact Dr. Angela Nugent,
Designated Federal Officer (DFO), EPA
Science Advisory Board (1400R), U.S.
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; via telephone/
voice mail (202) 564–2218, fax (202)
202–565–2098; or e-mail at
nugent.angela@epa.gov. General
information concerning the SAB can be
found on the EPA Web site at https://
www.epa.gov/sab.
SUPPLEMENTARY INFORMATION:
Background: The SAB was established
pursuant to the Environmental
Research, Development, and
Demonstration Authorization Act
(ERDAA), codified at 42 U.S.C. 4365, to
provide independent scientific and
technical advice to the Administrator on
the technical basis for Agency positions
and regulations. The BOSC was
established by the EPA to provide
advice, information, and
recommendations regarding the ORD
research program. The SAB and BOSC
are Federal Advisory Committees
chartered under the Federal Advisory
Committee Act (FACA), 5 U.S.C., App.
2. Pursuant to FACA and EPA policy,
notice is hereby given that the SAB and
BOSC will hold a joint public meeting
to hold discussions with EPA regarding
SUMMARY:
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 76, Number 107 (Friday, June 3, 2011)]
[Notices]
[Pages 32197-32198]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-13820]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8997-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 05/23/2011 Through 05/27/2011
Pursuant to 40 CFR 1506.9
Notice: In accordance with Section 309(a) of the Clean Air Act, EPA
is required to make its comments on EISs issued by other Federal
agencies public. Historically, EPA met this mandate by publishing
weekly notices of availability of EPA comments, which includes a brief
summary of EPA's comment letters, in the Federal Register. Since
February 2008, EPA has included its comment letters on EISs on its Web
site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the
entire EIS comment letters on the website satisfies the Section 309(a)
requirement to make EPA's comments on EISs
[[Page 32198]]
available to the public. Accordingly, on March 31, 2010, EPA
discontinued the publication of the notice of availability of EPA
comments in the Federal Register.
EIS No. 20110167, Revised Final EIS, USFS, MT, Bozeman Municipal
Watershed Project, New Information to Address New Additions to the
Sensitive Species List, To Implement Fuel Reduction Activities, Bozeman
Ranger District, Gallatin National Forest, City of Bozeman Municipal
Watershed, Gallatin County, MT, Review Period Ends: 07/18/2011,
Contact: Teri Seth 406-522-2520.
EIS No. 20110168, Draft Supplement, USFS, ID, Bussel 484 Project Area,
Updated and New Information, Manage the Project Area to Achieve Desired
Future Conditions for Vegetation, Fire, Fuels, Recreation, Access,
Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest,
St. Joe Ranger District, Shoshone County, ID, Comment Period Ends: 07/
18/2011, Contact: Lynette Myhre 208-245-1531.
EIS No. 20110169, Draft EIS, BLM, UT, Sigurd to Red Butte No. 2-345Kv
Transmission Project, Construct, Operate, and Maintain a Single--
Circuit 345 Kv Transmission Line, Issue of Right-of-Way Grant by BLM
and Special-Use-Permit by AFS, Sevier and Washington Counties, UT,
Comment Period Ends: 07/18/2011, Contact: Tamara Gertsch 307-775-61115.
EIS No. 20110170, Draft EIS, USACE, FL, St Lucie County South Beach and
Dune Restoration Project, To Restore Recreational Beach, Restore Beach
and Habitat, and Reduce Storm Damage Due to Beach Erosion, St. Lucie
County, FL, Comment Period Ends: 07/18/2011, Contact: Garett Lips 561-
472-3519.
EIS No. 20110171, Draft EIS, USFS, ID, Lower Orogrande Project,
Proposes Watershed Improvement Timber Harvest and Wildlife Habitat
Enhancement Activities, North Fork Ranger District, Clearwater National
Forest, Clearwater County, ID, Comment Period Ends: 07/18/2011,
Contact: George Harbaugh 208-935-4260.
EIS No. 20110172, Final EIS, USFS, CA, Mudflow Vegetation Management
Project, To Improve or Sustain the Health and Resiliency of the Forest
and Reduce the Risk of Stand-replacing Wildfire, Siskiyou County, CA,
Review Period Ends: 07/05/2011, Contact: Christine Jordan 530-964-3771.
EIS No. 20110173, Final EIS, GSA, CA, Calexico West Land Port of Entry
in Calexico, Expansion of Reconfiguration, Implementation, CA, Review
Period Ends: 07/05/2011, Contact: Maureen Sheehan 253-931-7548.
EIS No. 20110174, Draft EIS, USFS, 00, George Washington National
Forest Land and Resource Management Project, Implementation, Alleghany,
Amherst, Augusta, Bath, Botetourt, Frederick, Highland, Nelson, Page,
Rockbridge, Rockingham, Shenandoah, and Warren Counties VA and
Hampshire, Hardy, Monroe, and Pendleton Counties, WV, Comment Period
Ends: 09/01/2011, Contact: Karen Overcash 540-265-5175.
EIS No. 20110175, Final EIS, WAPA, SD, Groton Generation Station (GGS)
Project, Proposes to Modify its Interconnection Agreement, Basin
Electric Power Cooperative, for the (GGS) to Eliminate 50-Megawatts
(MW) Annual Average Operating Limit, Brown County, SD, Review Period
Ends: 07/05/2011, Contact: Erika Walters 720-962-7279.
Amended Notices
EIS No. 20110106, Draft EIS, BIA, NM, Pueblo of Jemez 70.277 Acre Fee-
To- Trust Transfer and Casino Project, Implementation, Dona Ana County,
NM, Comment Period Ends: 07/01/2011, Contact: Priscilla Wade 505-563-
3417. Revision to FR Notice Published 04/08/2011: Extending Comment
Period from 06/01/2011 to 07/01/2011.
EIS No. 20110108, Draft EIS, USFS, OR, Kapka Butte Sno-Park Project,
Proposal to Build a New Sno-Park to Provide more High-Elevation Parking
for Winter Recreationist, Bend-Ft. Rock Ranger District, Deschutes
National Forest, Deschutes County, OR, Comment Period Ends: 06/30/2011,
Contact: Beth Peer 541-383-4769 Revision to Notice Published 04/15/
2011: Extending Comment Period from 05/30/2011 to 06/30/2011.
EIS No. 20110121, Draft EIS, USA, CA, Presidio of Monterey Installation
(POM) Project, To Implement the Real Property Master Plan, Monterey
County, CA, Comment Period Ends: 06/21/2011, Contact: Michelle Royal
210-424-8331 Revision to FR Notice Published 04/22/2011: Extending
Comment Period from 06/06/2011 to 06/21/2011.
Dated: May 31, 2011.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-13820 Filed 6-2-11; 8:45 am]
BILLING CODE 6560-50-P