High Island Offshore System, L.L.C.; Notice of Compliance Filing, 31956-31957 [2011-13679]
Download as PDF
emcdonald on DSK2BSOYB1PROD with NOTICES
31956
Federal Register / Vol. 76, No. 106 / Thursday, June 2, 2011 / Notices
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The Troy
Project would consist of: (1) The
existing 20.5-foot-high, 180-foot-long
Bakers Falls dam equipped with a 134foot-long spillway and a 3.33-foot-wide,
4.0-foot-high wastegate located about 5
feet below the dam spillway; (2) an
existing 0.61-acre impoundment with a
normal water surface elevation of 739.4
feet above mean sea level; (3) an existing
intake structure equipped with two
3.33-foot-wide, 4.0-foot-high headgates;
(4) an existing forebay with a 2.0-footwide, 2.0-foot-high wastegate; (5) an
existing 250-foot-long, 6.5-foot-diameter
penstock; (6) an existing powerhouse
containing one inoperable 600-kilowatt
(kW) generating unit; and (7) three
existing overhead 6.6-kilovolt 90-footlong transmission lines.
The applicant proposes to: (1)
Rehabilitate or replace the powerhouse;
(2) increase the capacity of the
inoperable generating unit to 850 kW;
and (3) replace the existing transmission
lines with three new buried 480 volt 90foot-long transmission lines. The project
would be operated in a run-of-river
mode, and would have an annual
generation of 1,500 megawatt-hours.
m. Due to the project works already
existing and the limited scope of
proposed rehabilitation of the project
site described above, the applicant’s
close coordination with federal and
state agencies during the preparation of
the application, completed studies
during pre-filing consultation, and
VerDate Mar<15>2010
16:40 Jun 01, 2011
Jkt 223001
agency recommended preliminary terms
and conditions, we intend to waive
scoping, shorten the notice filing period,
and expedite the exemption process.
Based on a review of the application,
resource agency consultation letters
including the preliminary 30(c) terms
and conditions, and comments filed to
date, Commission staff intends to
prepare a single environmental
assessment (EA). Commission staff
determined that the issues that need to
be addressed in its EA have been
adequately identified during the prefiling period, which included a public
meeting and site visit, and no new
issues are likely to be identified through
additional scoping. The EA will
consider assessing the potential effects
of project construction and operation on
geology and soils, aquatic, terrestrial,
threatened and endangered species,
recreation and land use, aesthetic, and
cultural and historic resources.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
p. Procedural schedule: The
application will be processed according
to the following procedural schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Notice of the availability of
the EA.
Target date
October 2011.
Dated: May 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–13683 Filed 6–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP09–487–003]
High Island Offshore System, L.L.C.;
Notice of Compliance Filing
Take notice that on May 16, 2011,
High Island Offshore System, L.L.C.
(HIOS) filed to comply with the
Commission’s ‘‘Order Approving, as
Modified, Uncontested Settlement’’
issued on April 29, 2011. (135 FERC ¶
61,105 (2011)). HIOS states it is
submitting a revised Stipulation and
Agreement as directed, as more fully
described in the petition.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
5 p.m. Eastern time on the specified
comment date. Anyone filing a protest
must serve a copy of that document on
all the parties to the proceeding.
E:\FR\FM\02JNN1.SGM
02JNN1
Federal Register / Vol. 76, No. 106 / Thursday, June 2, 2011 / Notices
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Protest Date: 5 p.m. Eastern Time on
Thursday, June 2, 2011.
Dated: May 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–13679 Filed 6–1–11; 8:45 am]
BILLING CODE 6717–01–P
Dated: May 26, 2011.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2011–13682 Filed 6–1–11; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. NJ11–13–000]
DEPARTMENT OF ENERGY
emcdonald on DSK2BSOYB1PROD with NOTICES
Buckeye Power, Inc.; Notice of Filing
Take notice that on May 19, 2011,
Buckeye Power, Inc. (Buckeye), in
accordance with Rule 203 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedure,1 submitted
its Rate Schedule FERC No. 2 containing
Buckeye’s monthly revenue requirement
for its contribution to supply of Reactive
Power and Voltage Control from
Generation Sources Services, as
provided by Buckeye’s Greenville
generating plant.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
1 18
CFR 385.203 (2010).
VerDate Mar<15>2010
16:40 Jun 01, 2011
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 20, 2011.
Jkt 223001
Federal Energy Regulatory
Commission
[Docket No. CP11–484–000]
Williston Basin Interstate Pipeline
Company; Notice of Request Under
Blanket Authorization
Take notice that on May 18, 2011,
Williston Basin Interstate Pipeline
Company (Williston Basin) filed a prior
notice request for authorization, in
accordance with 18 CFR 157.213(b) and
157.216(b) of the Federal Energy
Regulatory Commission’s (Commission)
Regulations under the Natural Gas Act
(NGA) and Williston Basin’s blanket
certificate issued in Docket No. CP82–
487–000, et al.,1 for the replacement,
operation and abandonment of natural
1 By the Commission’s Order dated February 13,
1985 in Docket Nos. CP82–487–000, et al., (30 FERC
¶ 61,143), Williston Basin was authorized to
acquire and operate the interstate pipeline facilities
previously owned and operated by MDU Resources
Group, Inc. (MDU), its parent company, as well as
to provide the certificated service previously
provided by MDU, effective January 1, 1985. MDU
was originally granted blanket certificate authority
in Docket Nos. CP83–1–000, et al.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
31957
gas storage facilities in Fallon County,
Montana. Specifically, Williston Basin
proposes to replace three natural gas
storage wells and abandon one
additional well. Williston Basin states
that the estimated cost to construct the
facilities is approximately $928,000, all
as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice should be directed to Keith A.
Tiggelaar, Director of Regulatory Affairs,
Williston Basin Interstate Pipeline
Company, 1250 West Century Avenue,
Bismarck, North Dakota 58503, or
telephone (701) 530–1560, or by e-mail
keith.tiggelaar@wbip.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
E:\FR\FM\02JNN1.SGM
02JNN1
Agencies
[Federal Register Volume 76, Number 106 (Thursday, June 2, 2011)]
[Notices]
[Pages 31956-31957]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-13679]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP09-487-003]
High Island Offshore System, L.L.C.; Notice of Compliance Filing
Take notice that on May 16, 2011, High Island Offshore System,
L.L.C. (HIOS) filed to comply with the Commission's ``Order Approving,
as Modified, Uncontested Settlement'' issued on April 29, 2011. (135
FERC ] 61,105 (2011)). HIOS states it is submitting a revised
Stipulation and Agreement as directed, as more fully described in the
petition.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed on or before 5 p.m. Eastern time on the specified comment
date. Anyone filing a protest must serve a copy of that document on all
the parties to the proceeding.
[[Page 31957]]
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Protest Date: 5 p.m. Eastern Time on Thursday, June 2, 2011.
Dated: May 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-13679 Filed 6-1-11; 8:45 am]
BILLING CODE 6717-01-P