Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 31324 Federal Register / Vol. 76, No. 104 / Tuesday, May 31, 2011 / Notices Wobbe Index reduction (HVWIR) system at DOMAC’s liquefied natural gas (LNG) terminal in Everett, Massachusetts, (HVWIR Project), all as more fully set forth in the application, which is on file with the Commission and open to public inspection. Specifically, DOMAC proposes to alter the means by which it adjusts the heating value and Wobbe Index of the regasified LNG it delivers to interconnecting pipelines and is requesting authority to replace its limited air injection system with a liquid nitrogen system for all of its regasified LNG send-out. DOMAC asserts the HVWIR Project will enable DOMAC to maintain the flexibility to receive cargos to meet customer demand, to ensure delivery reliability, and to comply with the specifications of the FERC tariffs of interconnecting pipelines. DOMAC proposes to commence operation of the HVWIR system by October 1, 2012. Any questions concerning this application may be directed to Carol Churchill, Manager, Communications, Distrigas of Massachusetts, LLC, 20 City Square, Suite 3, Charlestown, MA 02129, at (617) 886–8759 or e-mail at carol.churchhill@gdfsuezna.com; or Marc A. Silver, General Counsel, Distrigas of Massachusetts LLC, 20 City Square, Suite 3, Charlestown, MA 02129, at (617) 886–8763 or e-mail at marc.silver@gdfsuezna.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of the Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of issuance of the Commission staff’s FEIS to EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 VerDate Mar<15>2010 17:27 May 27, 2011 Jkt 223001 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit an original and 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: June 15, 2011. Dated: May 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–13476 Filed 5–27–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC11–62–000. Applicants: Evergreen Wind Power III, LLC, Evergreen Gen Lead, LLC. Description: Supplemental Letter of Evergreen Wind Power III, LLC, and Evergreen Gen Lead. Filed Date: 05/24/2011. Accession Number: 20110524–5092. Comment Date: 5 p.m. Eastern Time on Tuesday, June 7, 2011. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–3081–000. Applicants: Florida Power & Light Company, NextEra Energy Duane Arnold, LLC, NextEra Energy Point Beach, LLC, NextEra Energy SeaBrook, LLC.. Description: Response of NextEra Nuclear Affiliates to the Data Request of Commission Staff. Filed Date: 05/20/2011. Accession Number: 20110520–5169. Comment Date: 5 p.m. Eastern Time on Friday, June 10, 2011. Docket Numbers: ER11–3192–001. Applicants: The Dayton Power and Light Company. Description: The Dayton Power and Light Company submits tariff filing per 35.37: FERC Electric Tariff, Volume No. 10 to be effective 3/26/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5101. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. E:\FR\FM\31MYN1.SGM 31MYN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 104 / Tuesday, May 31, 2011 / Notices Docket Numbers: ER11–3193–001. Applicants: The Dayton Power and Light Company. Description: The Dayton Power and Light Company submits tariff filing per 35.37: FERC Electric Tariff, Volume No. 6 to be effective 3/26/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5105. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3194–001. Applicants: DPL Energy, LLC. Description: DPL Energy, LLC. submits tariff filing per 35.37: FERC Rate Schedule No. 1 to be effective 3/ 26/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5108. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3384–001. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35: Amendment to Compliance Filing submitted in EL08–47–006 re-Docketed as ER11–3384 to be effective 4/16/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5126. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3630–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii): OVEC KK–1 Agreement to be effective 6/1/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5095. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3631–000. Applicants: Interstate Power and Light Company. Description: Interstate Power and Light Company submits tariff filing per 35: IPL RES–5 Baseline Tariff Compliance Filing to be effective 8/26/ 2010. Filed Date: 05/24/2011. Accession Number: 20110524–5111. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3632–000. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.13(a)(2)(iii): CEP Funding Long Term Conditional Firm PTP to be effective 12/1/2013. Filed Date: 05/24/2011. Accession Number: 20110524–5123. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3633–000. VerDate Mar<15>2010 17:27 May 27, 2011 Jkt 223001 Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii) 2011–05– 24 Amended and Restated UDCOA between CAISO and Banning, to be effective 7/24/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5128. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Docket Numbers: ER11–3634–000. Applicants: KES Kingsburg, L.P. Description: KES Kingsburg, L.P. submits tariff filing per 35.12: Baseline New to be effective 8/1/2011. Filed Date: 05/24/2011. Accession Number: 20110524–5127. Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES11–24–000. Applicants: Upper Peninsula Power Company. Description: Amendment to Upper Peninsula Power Company’s Application for Renewed Authorization to Issue Short-term Debt. Filed Date: 05/24/2011. Accession Number: 20110524–5144. Comment Date: 5 p.m. Eastern Time on Friday, June 3, 2011. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 31325 facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 25, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–13468 Filed 5–27–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the Record Communications; Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who E:\FR\FM\31MYN1.SGM 31MYN1

Agencies

[Federal Register Volume 76, Number 104 (Tuesday, May 31, 2011)]
[Notices]
[Pages 31324-31325]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-13468]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC11-62-000.
    Applicants: Evergreen Wind Power III, LLC, Evergreen Gen Lead, LLC.
    Description: Supplemental Letter of Evergreen Wind Power III, LLC, 
and Evergreen Gen Lead.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5092.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 7, 2011.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER11-3081-000.
    Applicants: Florida Power & Light Company, NextEra Energy Duane 
Arnold, LLC, NextEra Energy Point Beach, LLC, NextEra Energy SeaBrook, 
LLC..
    Description: Response of NextEra Nuclear Affiliates to the Data 
Request of Commission Staff.
    Filed Date: 05/20/2011.
    Accession Number: 20110520-5169.
    Comment Date: 5 p.m. Eastern Time on Friday, June 10, 2011.

    Docket Numbers: ER11-3192-001.
    Applicants: The Dayton Power and Light Company.
    Description: The Dayton Power and Light Company submits tariff 
filing per 35.37: FERC Electric Tariff, Volume No. 10 to be effective 
3/26/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5101.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.


[[Page 31325]]


    Docket Numbers: ER11-3193-001.
    Applicants: The Dayton Power and Light Company.
    Description: The Dayton Power and Light Company submits tariff 
filing per 35.37: FERC Electric Tariff, Volume No. 6 to be effective 3/
26/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5105.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3194-001.
    Applicants: DPL Energy, LLC.
    Description: DPL Energy, LLC. submits tariff filing per 35.37: FERC 
Rate Schedule No. 1 to be effective 3/26/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5108.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3384-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: PJM Interconnection, L.L.C. submits tariff filing per 
35: Amendment to Compliance Filing submitted in EL08-47-006 re-Docketed 
as ER11-3384 to be effective 4/16/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5126.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3630-000.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc. 
submits tariff filing per 35.13(a)(2)(iii): OVEC KK-1 Agreement to be 
effective 6/1/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5095.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3631-000.
    Applicants: Interstate Power and Light Company.
    Description: Interstate Power and Light Company submits tariff 
filing per 35: IPL RES-5 Baseline Tariff Compliance Filing to be 
effective 8/26/2010.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5111.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3632-000.
    Applicants: PacifiCorp.
    Description: PacifiCorp submits tariff filing per 35.13(a)(2)(iii): 
CEP Funding Long Term Conditional Firm PTP to be effective 12/1/2013.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5123.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3633-000.
    Applicants: California Independent System Operator Corporation.
    Description: California Independent System Operator Corporation 
submits tariff filing per 35.13(a)(2)(iii) 2011-05-24 Amended and 
Restated UDCOA between CAISO and Banning, to be effective 7/24/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5128.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Docket Numbers: ER11-3634-000.
    Applicants: KES Kingsburg, L.P.
    Description: KES Kingsburg, L.P. submits tariff filing per 35.12: 
Baseline New to be effective 8/1/2011.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5127.
    Comment Date: 5 p.m. Eastern Time on Tuesday, June 14, 2011.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES11-24-000.
    Applicants: Upper Peninsula Power Company.
    Description: Amendment to Upper Peninsula Power Company's 
Application for Renewed Authorization to Issue Short-term Debt.
    Filed Date: 05/24/2011.
    Accession Number: 20110524-5144.
    Comment Date: 5 p.m. Eastern Time on Friday, June 3, 2011.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    As it relates to any qualifying facility filings, the notices of 
self-certification [or self-recertification] listed above, do not 
institute a proceeding regarding qualifying facility status. A notice 
of self-certification [or self-recertification] simply provides 
notification that the entity making the filing has determined the 
facility named in the notice meets the applicable criteria to be a 
qualifying facility. Intervention and/or protest do not lie in dockets 
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying 
facility status may do so by filing a motion pursuant to 18 CFR 
292.207(d)(iii). Intervention and protests may be filed in response to 
notices of qualifying facility dockets other than self-certifications 
and self-recertifications.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive email notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: May 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-13468 Filed 5-27-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.