Federal Register / Vol. 76, No. 101 / Wednesday, May 25, 2011 / Notices
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 25, 2011.
Dated: May 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–12866 Filed 5–24–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–41–000]
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
California Independent System
Operator Corporation; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On May 19, 2011, the Commission
issued an order that instituted an
investigation in Docket No. EL11–41–
000, pursuant to section 206 of
the Federal Power Act (FPA), 16 U.S.C.
824e, to evaluate the justness and
reasonableness of section 10.3.6.3 of the
California Independent System Operator
Corporation’s tariff. Cal. Indep.
Operator Corp., 135 FERC ¶ 61,159
(2011).
The refund effective date in Docket
No. EL11–41–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Dated: May 19, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–12890 Filed 5–24–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:06 May 24, 2011
Jkt 223001
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
30339
Federal Energy Regulatory
Commission
[Project No. 14120–000]
[Docket No. CP11–128–000]
National Fuel Gas Supply Corporation;
Notice of Public Scoping Meeting for
the Proposed Northern Access Project
Reliable Storage 1 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 6, 2011, the Office of Energy
Projects staff will hold a public scoping
meeting to obtain input related to the
environmental analysis of National Fuel
Gas Supply Corporation’s (National
Fuel) Northern Access Project. We
scheduled this meeting to provide
landowners an opportunity to voice
comments on the proposed project, and
in response to the requests received
during the April 11, 2011 environmental
site review of the proposed East Aurora
Compressor Station site and subsequent
requests filed with the Commission. The
environmental site review was noticed
in our March 29, 2011, Notice of Intent
to Prepare an Environmental
Assessment for the Proposed Northern
Access Project and Station 230C Project,
Request for Comments on
Environmental Issues, and Notice of
Public Environmental Site Review (NOI).
The public scoping meeting is
scheduled as follows:
On March 25, 2011, Reliable Storage
1 LLC filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of
hydropower near the town of
Sneedville, on Keaton Creek, in
Hancock County, Tennessee. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed pumped storage project
would consist of the following: (1) A
160-foot-high, 4,386-foot-long earth
embankment dam; (2) an upper
reservoir with a surface area of 57.4
acres and an 4,563 acre-foot storage
capacity; (3) a 180-foot-high, 323-footlong earth embankment dam creating;
(4) a lower reservoir with a surface area
of 32.1 acres and an 2,553 acre-foot
Northern Access Project Scoping
storage capacity; (5) one 24-footMeeting
diameter, 3,400-foot-long penstock; (6) a
bifurcation to three penstocks each 16June 6, 2011, at 7 p.m., Parkdale
Elementary School, 141 Girard Avenue, foot-diameter, and 50-foot-long; (7) a
powerhouse/pumping station
East Aurora, NY 14052.
containing three pump/generating units
This notice is being sent to the
with a total generating capacity of 309
Commission’s current environmental
megawatts; (8) a substation; (9) a 5.62mailing list for this project. The NOI
mile-long, 500 kV transmission line to
and additional information about the
an existing distribution line; and (10) a
project is available from the
new 3,420-foot-long access road. The
Commission’s Office of External Affairs, proposed project would have an average
at (866) 208–FERC, or on the FERC Web annual generation of 322,000,000
site at https://www.ferc.gov using the
megawatt hours (MWh), which would
‘‘eLibrary’’ link. Click on the eLibrary
be sold to a local utility.
Applicant Contact: Mr. Daniel R.
link, click on ‘‘General Search’’ and enter
Irvin, Free Flow Power Corporation, 239
the docket number, excluding the last
Causeway Street, Suite 300, Boston MA
three digits in the Docket Number field
01244; phone (978) 252–7631.
(i.e., CP11–128). Be sure you have
FERC Contact: Michael Spencer, (202)
selected an appropriate date range. For
502–6093.
assistance, please contact FERC Online
Deadline for filing comments, motions
Support at FercOnlineSupport@ferc.gov
to intervene, competing applications
or toll free at (866) 208–3676, or for
(without notices of intent), or notices of
TTY, contact (202) 502–8659.
intent to file competing applications: 60
Dated: May 19, 2011.
days from the issuance of this notice.
Competing applications and notices of
Kimberly D. Bose,
intent must meet the requirements of 18
Secretary.
CFR 4.36. Comments, motions to
[FR Doc. 2011–12892 Filed 5–24–11; 8:45 am]
intervene, notices of intent, and
BILLING CODE 6717–01–P
competing applications may be filed
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
E:\FR\FM\25MYN1.SGM
25MYN1
Agencies
[Federal Register Volume 76, Number 101 (Wednesday, May 25, 2011)]
[Notices]
[Page 30339]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-12890]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL11-41-000]
California Independent System Operator Corporation; Notice of
Institution of Section 206 Proceeding and Refund Effective Date
On May 19, 2011, the Commission issued an order that instituted an
investigation in Docket No. EL11-41-000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C. 824e, to evaluate the justness and
reasonableness of section 10.3.6.3 of the California Independent System
Operator Corporation's tariff. Cal. Indep. Operator Corp., 135 FERC ]
61,159 (2011).
The refund effective date in Docket No. EL11-41-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Dated: May 19, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-12890 Filed 5-24-11; 8:45 am]