Northwest Pipeline, GP; Notice of Availability of the Environmental Assessment for the Proposed Molalla Capacity Replacement Project, 28764 [2011-12117]

Download as PDF 28764 Federal Register / Vol. 76, No. 96 / Wednesday, May 18, 2011 / Notices Dated: May 12, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–12219 Filed 5–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–59–000] srobinson on DSKHWCL6B1PROD with NOTICES Northwest Pipeline, GP; Notice of Availability of the Environmental Assessment for the Proposed Molalla Capacity Replacement Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Molalla Capacity Replacement Project (Project) proposed by Northwest Pipeline GP (Northwest) in the abovereferenced docket. Northwest requests authorization to abandon, construct, and operate certain natural gas pipeline facilities along its existing 2436 Camas/ Eugene pipeline system in Marion and Clackamas Counties, Oregon. The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). The FERC staff concludes that approval of the Project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. Northwest proposes to construct, modify, and operate below and aboveground facilities along their existing Camas to Eugene pipeline system. Specifically, Northwest proposes to retire in-place approximately 15 miles of 16-inchdiameter pipeline and associated minor aboveground facilities; and to install approximately 7.8 miles of 20-inchdiameter pipeline loop and the necessary appurtenant facilities. The EA has been placed in the public files of the FERC and is available for public viewing on the FERC’s Web site at https://www.ferc.gov using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to federal, state, and local government VerDate Mar<15>2010 16:31 May 17, 2011 Jkt 223001 representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are properly recorded and considered prior to a Commission decision on the proposal, it is important that the FERC receives your comments in Washington, DC on or before June 13, 2011. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number (CP11–59–000) with your submission. The Commission encourages electronic filing of comments and has dedicated eFiling expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Web site at https:// www.ferc.gov under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. Although your comments will be considered by the Commission, simply filing comments will not serve to make the commenter a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 Practice and Procedures (18 CFR 385.214).1 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC or on the FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP11–59). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ esubscribenow.htm. Dated: May 11, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–12117 Filed 5–17–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–68–000] Equitrans, L.P.; Notice of Availability of the Environmental Assessment for the Proposed Sunrise Pipeline Project The staff of the Federal Energy Regulatory Commission (Commission or FERC) has prepared this environmental assessment (EA) for the Sunrise Pipeline Project proposed by Equitrans, L.P. 1 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. E:\FR\FM\18MYN1.SGM 18MYN1

Agencies

[Federal Register Volume 76, Number 96 (Wednesday, May 18, 2011)]
[Notices]
[Page 28764]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-12117]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-59-000]


Northwest Pipeline, GP; Notice of Availability of the 
Environmental Assessment for the Proposed Molalla Capacity Replacement 
Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the 
Molalla Capacity Replacement Project (Project) proposed by Northwest 
Pipeline GP (Northwest) in the above-referenced docket. Northwest 
requests authorization to abandon, construct, and operate certain 
natural gas pipeline facilities along its existing 2436 Camas/Eugene 
pipeline system in Marion and Clackamas Counties, Oregon.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
requirements of the National Environmental Policy Act of 1969 (NEPA). 
The FERC staff concludes that approval of the Project, with appropriate 
mitigating measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    Northwest proposes to construct, modify, and operate below and 
aboveground facilities along their existing Camas to Eugene pipeline 
system. Specifically, Northwest proposes to retire in-place 
approximately 15 miles of 16-inch-diameter pipeline and associated 
minor aboveground facilities; and to install approximately 7.8 miles of 
20-inch-diameter pipeline loop and the necessary appurtenant 
facilities.
    The EA has been placed in the public files of the FERC and is 
available for public viewing on the FERC's Web site at https://www.ferc.gov using the eLibrary link. A limited number of copies of the 
EA are available for distribution and public inspection at:

Federal Energy Regulatory Commission, Public Reference Room, 888 First 
Street, NE., Room 2A, Washington, DC 20426, (202) 502-8371.

    Copies of the EA have been mailed to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; other 
interested individuals and groups; newspapers and libraries in the 
project area; and parties to this proceeding.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that your comments are properly recorded and considered prior to 
a Commission decision on the proposal, it is important that the FERC 
receives your comments in Washington, DC on or before June 13, 2011.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
project docket number (CP11-59-000) with your submission. The 
Commission encourages electronic filing of comments and has dedicated 
eFiling expert staff available to assist you at (202) 502-8258 or 
efiling@ferc.gov.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an 
easy method for interested persons to submit brief, text-only comments 
on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you 
can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address:

Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Room 1A, Washington, DC 20426.

    Although your comments will be considered by the Commission, simply 
filing comments will not serve to make the commenter a party to the 
proceeding. Any person seeking to become a party to the proceeding must 
file a motion to intervene pursuant to Rule 214 of the Commission's 
Rules of Practice and Procedures (18 CFR 385.214).\1\ Only intervenors 
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------

    \1\ Interventions may also be filed electronically via the 
Internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC or on the 
FERC Web site (https://www.ferc.gov) using the eLibrary link. Click on 
the eLibrary link, click on ``General Search'' and enter the docket 
number excluding the last three digits in the Docket Number field 
(i.e., CP11-59). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.

    Dated: May 11, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-12117 Filed 5-17-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.