Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 28219 [2011-11911]
Download as PDF
28219
Federal Register / Vol. 76, No. 94 / Monday, May 16, 2011 / Notices
Issued at Washington, DC on May 10, 2011.
LaTanya R. Butler,
Acting Deputy Committee Management
Officer.
[FR Doc. 2011–11922 Filed 5–13–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12958–001; Project No. 12962–
001]
erowe on DSK5CLS3C1PROD with NOTICES
Uniontown Hydro, LLC, Newburgh
Hydro, LLC; Notice of Applications
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Applications: New Major
License.
b. Project Nos.: 12958–001 and
12962–001.
c. Date Filed: April 29, 2011.
d. Applicant: Uniontown Hydro, LLC
and Newburgh Hydro, LLC.
e. Name of Projects: Uniontown
Hydroelectric Project and Newburgh
Hydroelectric Project.
f. Location: The projects would be
located on the Ohio River at existing
U.S. Army Corps of Engineers locks and
dams. The Uniontown Project would be
located at the John T. Myers Lock and
Dam, in Union County, Kentucky and
Posey County, Indiana. The Newburgh
Project would be located at the
Newburgh Lock and Dam, in Henderson
County, Kentucky and Warrick County,
Indiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Brent L. Smith,
COO, Symbiotics, P.O. Box 535, Rigby,
Idaho 83442.
i. FERC Contact: Jennifer Adams;
(202) 502–8087, or
jennifer.adams@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing John T. Myers Lock and Dam is
a 3,504-foot-long, 119-foot-high dam
containing ten Taintor gates and a
concrete fixed weir. Each gate is 110foot-wide by 32-foot-high. The main and
auxiliary locks are on the Indiana side
of the river. The main lock is 110-footwide by 1,200-foot-long and the
auxiliary lock is 110-foot-wide by 600foot-long. The impoundment above the
VerDate Mar<15>2010
15:14 May 13, 2011
Jkt 223001
John T. Myers Lock and Dam has a
surface area of 19,350 acres and a
storage capacity of 543,862 acre-feet.
Because the purpose of the storage is
navigational only, the storage would not
be used for power generation.
The proposed Uniontown Project (at
the John T. Myers Lock and Dam) would
consist of: (1) A 340-foot-long by 75foot-wide powerhouse and inlet
containing four Kaplan turbinegenerators, with an installed capacity of
24.0 MW each for a total plant capacity
of 96.0 MW; (2) a 520-foot-wide by 38foot-high trash rack, with 4-inch
openings; (3) a 300-foot-wide by 57-foothigh concrete draft tube outlet; (4) a
14.47-mile-long, 138-kV transmission
line; and (5) appurtenant facilities.
The existing Newburgh Lock and Dam
is a 2,275.5-foot-long by 122-foot-high
dam containing nine Taintor gates and
a concrete fixed weir. Each gate is 110foot-wide by 32-feet-high. The main and
auxiliary locks are on the Indiana side
of the river. The main lock is 110-footwide by 1,200-foot-long and the
auxiliary lock is 110-foot-wide by 600foot-long. The impoundment above the
Newburgh Lock and Dam has a surface
area of 16,390 acres and a storage
capacity of 455,800 acre-feet. Because
the purpose of the storage is
navigational only, the storage would not
be used for power generation.
The proposed Newburgh Project (at
the Newburgh Lock and Dam) would
consist of: (1) A 375-foot-long by 110foot-wide powerhouse and inlet
containing five Kaplan turbinegenerators, with an installed capacity of
13.0 MW each for a total plant capacity
of 65.0 MW; (2) a 400-foot-wide by 44foot-high trash rack, with 4-inch
openings; (3) a 375-foot-wide by 57-foothigh concrete draft tube outlet; (4) a 4.7mile-long, 138-kV transmission line;
and (5) appurtenant facilities.
l. Locations of the Applications:
Copies of the applications are available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary
Hydropower Licensing Schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
Filing of recommendations, preliminary
terms and conditions,
and fishway prescriptions.
Commission issues
Draft EA.
Comments on Draft EA
Modified terms and conditions.
Commission Issues
Final EA or EIS.
Target date
June 28, 2011.
August 27, 2011.
February 23, 2012.
March 24, 2012.
May 23, 2012.
August 21, 2012.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–11911 Filed 5–13–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–115]
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 2413–115.
c. Date Filed: March 2, 2011.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Pumped
Storage Project.
f. Location: Lake Oconee in Greene
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Susan Davis,
Georgia Power Company, 125 Wallace
Dam Road, Eatonton, GA 31024.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 76, Number 94 (Monday, May 16, 2011)]
[Notices]
[Page 28219]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11911]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12958-001; Project No. 12962-001]
Uniontown Hydro, LLC, Newburgh Hydro, LLC; Notice of Applications
Tendered for Filing With the Commission and Establishing Procedural
Schedule for Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Applications: New Major License.
b. Project Nos.: 12958-001 and 12962-001.
c. Date Filed: April 29, 2011.
d. Applicant: Uniontown Hydro, LLC and Newburgh Hydro, LLC.
e. Name of Projects: Uniontown Hydroelectric Project and Newburgh
Hydroelectric Project.
f. Location: The projects would be located on the Ohio River at
existing U.S. Army Corps of Engineers locks and dams. The Uniontown
Project would be located at the John T. Myers Lock and Dam, in Union
County, Kentucky and Posey County, Indiana. The Newburgh Project would
be located at the Newburgh Lock and Dam, in Henderson County, Kentucky
and Warrick County, Indiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Brent L. Smith, COO, Symbiotics, P.O. Box
535, Rigby, Idaho 83442.
i. FERC Contact: Jennifer Adams; (202) 502-8087, or
jennifer.adams@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The existing John T. Myers Lock and Dam
is a 3,504-foot-long, 119-foot-high dam containing ten Taintor gates
and a concrete fixed weir. Each gate is 110-foot-wide by 32-foot-high.
The main and auxiliary locks are on the Indiana side of the river. The
main lock is 110-foot-wide by 1,200-foot-long and the auxiliary lock is
110-foot-wide by 600-foot-long. The impoundment above the John T. Myers
Lock and Dam has a surface area of 19,350 acres and a storage capacity
of 543,862 acre-feet. Because the purpose of the storage is
navigational only, the storage would not be used for power generation.
The proposed Uniontown Project (at the John T. Myers Lock and Dam)
would consist of: (1) A 340-foot-long by 75-foot-wide powerhouse and
inlet containing four Kaplan turbine-generators, with an installed
capacity of 24.0 MW each for a total plant capacity of 96.0 MW; (2) a
520-foot-wide by 38-foot-high trash rack, with 4-inch openings; (3) a
300-foot-wide by 57-foot-high concrete draft tube outlet; (4) a 14.47-
mile-long, 138-kV transmission line; and (5) appurtenant facilities.
The existing Newburgh Lock and Dam is a 2,275.5-foot-long by 122-
foot-high dam containing nine Taintor gates and a concrete fixed weir.
Each gate is 110-foot-wide by 32-feet-high. The main and auxiliary
locks are on the Indiana side of the river. The main lock is 110-foot-
wide by 1,200-foot-long and the auxiliary lock is 110-foot-wide by 600-
foot-long. The impoundment above the Newburgh Lock and Dam has a
surface area of 16,390 acres and a storage capacity of 455,800 acre-
feet. Because the purpose of the storage is navigational only, the
storage would not be used for power generation.
The proposed Newburgh Project (at the Newburgh Lock and Dam) would
consist of: (1) A 375-foot-long by 110-foot-wide powerhouse and inlet
containing five Kaplan turbine-generators, with an installed capacity
of 13.0 MW each for a total plant capacity of 65.0 MW; (2) a 400-foot-
wide by 44-foot-high trash rack, with 4-inch openings; (3) a 375-foot-
wide by 57-foot-high concrete draft tube outlet; (4) a 4.7-mile-long,
138-kV transmission line; and (5) appurtenant facilities.
l. Locations of the Applications: Copies of the applications are
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov,
using the ``eLibrary'' link. Enter the docket number, excluding the
last three digits in the docket number field to access the document.
For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydropower Licensing Schedule. Revisions
to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for June 28, 2011.
Environmental Analysis.
Filing of recommendations, preliminary August 27, 2011.
terms and conditions, and fishway
prescriptions.
Commission issues Draft EA................ February 23, 2012.
Comments on Draft EA...................... March 24, 2012.
Modified terms and conditions............. May 23, 2012.
Commission Issues Final EA or EIS......... August 21, 2012.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: May 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11911 Filed 5-13-11; 8:45 am]