Progress Energy Carolinas, Inc.; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 28016 [2011-11734]
Download as PDF
28016
Federal Register / Vol. 76, No. 93 / Friday, May 13, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2206–041]
mstockstill on DSKH9S0YB1PROD with NOTICES
Progress Energy Carolinas, Inc.;
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 2206–041.
c. Date Filed: March 29, 2011.
d. Applicant: Progress Energy
Carolinas, Inc.
e. Name of Project: Yadkin-Pee Dee
Hydroelectric Project.
f. Location: The Pee Dee River in
Stanly County, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Larry Mann,
Progress Energy Carolinas, Inc., Tillery
Hydro Plant, 179 Tillery Dam Road,
Mount Gilead, NC 27306. (919) 546–
5300.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: June
6, 2011.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2206–041) on any
comments or motions filed.
k. Description of Application:
Progress Energy Carolinas, Inc. requests
after-the-fact Commission approval to
grant Edgewater Developers, Inc.
(permittee) a lease of project lands and
waters for the continued use of an
existing boat launch and an existing
boat dock with 10 slips at Lake Tillery.
The boat launch and dock serve the
residents of the Edgewater subdivision.
l. Locations of the Application: A
copy of the application is available for
VerDate Mar<15>2010
17:22 May 12, 2011
Jkt 223001
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field (P–2206) to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title ‘‘Comments’’,
‘‘Protest’’, or ‘‘Motion to Intervene’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 6, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–11734 Filed 5–12–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–291–000]
El Paso Natural Gas Company; Notice
of Application
On April 26, 2011, El Paso Natural
Gas Company (El Paso), P.O. Box 1087,
Colorado Springs, CO 80944, filed with
the Federal Energy Regulatory
Commission (Commission) an
application under section 7(b) of the
Natural Gas Act (NGA) and Part 157.5
of the Commission’s regulations,
requesting authorization to abandon in
place a compressor unit, with
appurtenances, at El Paso’s Monument
Compressor Station located in Lea
County, New Mexico. Specifically, El
Paso is seeking to abandon Unit 2B
since it has become functionally
obsolete and is no longer needed to
provide natural gas transportation
service. The filing is available for review
at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Questions regarding the application
may be directed to Susan C. Stires,
Director, Regulatory Affairs, Rates &
Certificates, El Paso Natural Gas
Company, P.O. Box 1087, Colorado
Springs, CO 80944, at (719) 667–7514
(phone), (719) 667–7534 (fax), or
EPNGRegulatoryAffairs@elpaso.com or
to Craig V. Richardson, Vice President
and General Counsel, El Paso Natural
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 76, Number 93 (Friday, May 13, 2011)]
[Notices]
[Page 28016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11734]
[[Page 28016]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2206-041]
Progress Energy Carolinas, Inc.; Notice of Application for
Amendment of License and Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No: 2206-041.
c. Date Filed: March 29, 2011.
d. Applicant: Progress Energy Carolinas, Inc.
e. Name of Project: Yadkin-Pee Dee Hydroelectric Project.
f. Location: The Pee Dee River in Stanly County, North Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Larry Mann, Progress Energy Carolinas, Inc.,
Tillery Hydro Plant, 179 Tillery Dam Road, Mount Gilead, NC 27306.
(919) 546-5300.
i. FERC Contact: Mark Carter, (678) 245-3083, mark.carter@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: June 6, 2011.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. Please include the
project number (P-2206-041) on any comments or motions filed.
k. Description of Application: Progress Energy Carolinas, Inc.
requests after-the-fact Commission approval to grant Edgewater
Developers, Inc. (permittee) a lease of project lands and waters for
the continued use of an existing boat launch and an existing boat dock
with 10 slips at Lake Tillery. The boat launch and dock serve the
residents of the Edgewater subdivision.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-2206) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``Comments'', ``Protest'', or
``Motion to Intervene'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 6, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11734 Filed 5-12-11; 8:45 am]
BILLING CODE 6717-01-P