Notice of Availability of the Final Environmental Impact Statement for Palen Solar I, LLC's Palen Solar Power Plant (PSPP) and Proposed California Desert Conservation Area Plan Amendment, 28064-28065 [2011-11657]
Download as PDF
28064
Federal Register / Vol. 76, No. 93 / Friday, May 13, 2011 / Notices
the address above. Case file documents
for case WYW161248 are available for
inspection at the BLM Wyoming State
Office.
Donald A. Simpson,
State Director.
[FR Doc. 2011–11654 Filed 5–12–11; 8:45 am]
BILLING CODE 4310–22–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA 048810, LLCAD06000,
L51010000.FX0000, LVRWB09B2600]
Notice of Availability of the Final
Environmental Impact Statement for
Palen Solar I, LLC’s Palen Solar Power
Plant (PSPP) and Proposed California
Desert Conservation Area Plan
Amendment
Bureau of Land Management,
Interior.
ACTION: Notice of Availability.
AGENCY:
In accordance with the
National Environmental Policy Act of
1969, as amended (NEPA), and the
Federal Land Policy and Management
Act of 1976, as amended (FLPMA), the
Bureau of Land Management (BLM) has
prepared a Proposed California Desert
Conservation Area (CDCA) Plan
Amendment/Final Environmental
Impact Statement (EIS) for the Palen
Solar Power Plant project and by this
notice is announcing its availability.
DATES: The publication of the
Environmental Protection Agency’s
(EPA) Notice of Availability (NOA) of
this Final EIS in the Federal Register
initiates a 30-day public comment
period. In addition, the BLM planning
regulations state that any person who
meets the conditions as described in the
regulations at 43 CFR 1610.52 may
protest the BLM’s Proposed CDCA Plan
Amendment. A person who meets the
conditions and files a protest must file
the protest within 30 days of the date
that the EPA publishes its notice in the
Federal Register. The protest
procedures are described in the ‘‘Dear
Reader’’ letter accompanying the
Proposed Plan Amendment/Final EIS.
ADDRESSES: Copies of the Palen
Proposed CDCA Plan Amendment/Final
EIS have been sent to affected Federal,
state, and local government agencies
and to other stakeholders. You may
send your comments to the Palm
Springs South Coast Field Office, 1201
Bird Center Drive, Palm Springs,
California 92262. Copies are also
available for public inspection at this
address. Interested persons may also
mstockstill on DSKH9S0YB1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:22 May 12, 2011
Jkt 223001
review the document at the following
Web site: https://www.blm.gov/ca/st/en/
fo/palmsprings/Solar_Projects/
Palen_Solar_Power_Project.html. All
protests must be in writing and mailed
to one of the following addresses:
Regular Mail: BLM Director (210),
Attention: Brenda Williams, P.O. Box
71383, Washington, DC 20024–1383.
Overnight Mail: BLM Director (210),
Attention: Brenda Williams, 20 M
Street, SE., Room 2134LM,
Washington, DC 20003.
FOR FURTHER INFORMATION CONTACT: For
further information contact Allison
Shaffer, BLM Project Manager,
telephone (760) 833–7100; 1201 Bird
Center Drive, Palm Springs, California
92262 or e-mail
CAPSSolarPalen@blm.gov. Persons who
use a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339 to contact the above
individual during normal business
hours. The FIRS is available 24 hours a
day, 7 days a week, to leave a message
or question with the above individual.
You will receive a reply during normal
business hours.
SUPPLEMENTARY INFORMATION: Palen
Solar I, LLC (Palen), a wholly-owned
subsidiary of Solar Millennium, Inc.,
has submitted a right-of-way (ROW)
application to the BLM for development
of the proposed Palen project, consisting
of two parabolic-trough solar thermal
power plants, each of which has a ‘‘solar
field’’ comprised of rows of parabolic
mirrors focusing solar energy on
collector tubes. The tubes would carry
heated oil to a boiler that sends live
steam to a steam turbine. The project
would be built in 2 phases which are
designed to generate in total
approximately 500 megawatts (MW) of
electricity at full development. The
proposed ROW would encompass
approximately 5,200 acres; the
disturbed area would encompass
approximately 3,107 acres. The project
is in Riverside County, California, 10
miles east of Desert Center along
Interstate 10 halfway between the cities
of Indio and Blythe.
The major components and features of
the proposed Palen project include the
two power plants, an access road,
operations facilities (office, warehouse,
etc.), a switchyard, an electrical
transmission line (which will connect to
Southern California Edison’s planned
Red Bluff substation, 10 miles west of
the Palen project site), and two water
wells. This dry-cooled power plant
would use approximately 300 acre-feet
of water per year for feed water makeup,
dust control, domestic uses, and mirror
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
washing obtained from on-site water
wells.
The BLM’s purpose and need for the
Final EIS is to respond to Palen’s
application for a ROW grant to
construct, operate, and decommission a
solar thermal facility on public lands in
compliance with FLPMA, the BLM
ROW regulations, and other applicable
Federal laws. The BLM will decide
whether to grant, grant with
modification, or deny a ROW to Palen
for the proposed project. The CDCA
Plan (1980, as amended), while
recognizing the potential compatibility
of solar generation facilities with other
uses on public lands, requires that all
sites proposed for power generation or
transmission not already identified in
the plan be considered through the plan
amendment process. If the BLM decides
to grant a ROW for this project, the
CDCA Plan would be amended as
required. In response to the application
received from Palen, the BLM’s
proposed action is to authorize the
Palen project and amend the CDCA Plan
to identify the project area as suitable
for solar energy production.
In addition to the proposed action, the
BLM is analyzing the following action
alternatives: Two reconfigured 500–MW
alternatives designed to reduce impacts
to desert washes, dune habitat, and the
Mojave fringe-toed lizard, and a smaller
375–MW alternative. The reconfigured
500–MW alternative that has as an
option to use 240 acres of private land,
if available, is the preferred alternative.
The Final EIS also analyzes a no action
alternative that would not approve a
CDCA Plan amendment and two no
project alternatives that reject the
project, but amend the CDCA Plan to:
(1) Designate the project area as
available to future solar energy power
generation projects; or (2) designate the
project area as unavailable to future
solar energy power generation projects.
The BLM will take into consideration
the provisions of the Energy Policy Act
of 2005 and Secretarial Orders 3283—
‘‘Enhancing Renewable Energy Development
on the Public Lands’’, and 3285A1—
‘‘Renewable Energy Development by the
Department of the Interior’’ in responding to
the PSPP application.
The Final EIS evaluates the potential
impacts of the proposed PSPP and
CDCA Plan Amendment on air quality,
biological resources, cultural resources,
water resources, geological resources
and hazards, land use, noise,
paleontological resources, public health,
socioeconomics, soils, traffic and
transportation, visual resources,
wilderness characteristics, impacts to
Joshua Tree National Park, and other
resources.
E:\FR\FM\13MYN1.SGM
13MYN1
Federal Register / Vol. 76, No. 93 / Friday, May 13, 2011 / Notices
A Notice of Availability for the Palen
Draft CDCA Plan Amendment/Draft EIS
was published by EPA in the Federal
Register on April 7, 2010 (75 FR 17765).
The formal 90-day comment period
ended on July 1, 2010. Comments were
considered and incorporated as
appropriate into the Proposed CDCA
Plan Amendment/Final EIS. Public
comments resulted in the addition of
clarifying text and development of a
modified alternative but did not
significantly change proposed land use
plan decisions.
Instructions for filing a protest with
the Director of the BLM regarding the
Palen project may be found in the ‘‘Dear
Reader Letter’’ of the Proposed CDCA
Plan Amendment/Final EIS and at 43
CFR 1610.5–2. E-mailed and faxed
protests will not be accepted as valid
protests unless the protesting party also
provides the original letter by either
regular or overnight mail postmarked by
the close of the protest period. Under
these conditions, the BLM will consider
the e-mailed or faxed protest as an
advance copy and it will receive full
consideration. If you wish to provide
the BLM with such advance
notification, please direct faxed protests
to the attention of the BLM protest
coordinator at (202) 208–5010 and emails to Brenda_HudgensWilliams@blm.gov. All protests,
including the follow-up letter to e-mails
or faxes, must be in writing and mailed
to the appropriate address, as set forth
in the ADDRESSES section above.
Before including your phone number,
e-mail address, or other personal
identifying information in your protest,
you should be aware that your entire
protest—including your personal
identifying information—may be made
publicly available at any time. While
you can ask us in your protest to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Authority: 40 CFR 1506.6, 1506.10, 43
CFR 1610.2, and 1610.5.
James W. Keeler,
Acting Deputy State Director, California.
mstockstill on DSKH9S0YB1PROD with NOTICES
[FR Doc. 2011–11657 Filed 5–12–11; 8:45 am]
BILLING CODE 4310–40–P
VerDate Mar<15>2010
17:22 May 12, 2011
Jkt 223001
DEPARTMENT OF THE INTERIOR
National Park Service
[2253–665]
Notice of Intent To Repatriate a
Cultural Item: Montana Historical
Society, Helena, MT
National Park Service, Interior.
Notice.
AGENCY:
ACTION:
Notice is here given in accordance
with the Native American Graves
Protection and Repatriation Act
(NAGPRA), 25 U.S.C. 3005, of the intent
to repatriate a cultural item in the
possession of the Montana Historical
Society, Helena, MT, that meets the
definition of a sacred object under 25
U.S.C. 3001.
This notice is published as part of the
National Park Service’s administrative
responsibilities under NAGPRA, 25
U.S.C. 3003(d)(3). The determinations in
this notice are the sole responsibility of
the museum, institution, or Federal
agency that has control of the cultural
item. The National Park Service is not
responsible for the determinations in
this notice.
The cultural item is a split horn
bonnet headdress (X1892.01.38), which
has a cap of animal skin and is covered
with strips of ermine. The split horns
are attached at either side and are
wrapped with a woven wool sash of
predominately red wool. Yellow or
green twill weave tape is tied to the base
of the horns along with a different
pattern of red sash. The horn tips are
joined by a strand of blue and white
beads. The tips are decorated with blue
and yellow horse hair, brass hawk bells,
ermine strips with red feathers, and
large blue beads. At the base of the
horns are 16 inch strands of red wool
yarn in a bundle. Ermine tubes around
the lower edge of the cap are 10–12
inches long. The ermine strips and tubes
are attached in a variety of ways. They
are decorated with either large beads,
red wool yarn, red and blue feathers, or
porcupine quills. Running horizontally
under the ermine on the outside of the
cap are six brass buttons decorated in
low relief with floral and leaf motifs.
The buttons are inserted into the cap by
means of a shank, and have been
secured inside the cap with a strip of
leather through the eyes. Below the
buttons, at the base of the cap, is a piece
of leather in upside down ‘‘V’’ pattern.
A narrow strip of leather appears to lace
across this area. A red stroud strip is
just above the face.
According to museum records this
bonnet was acquired by Major R. A.
Allen ‘‘from the Blackfeet, Bloods, and
PO 00000
Frm 00080
Fmt 4703
Sfmt 9990
28065
Piegan Indians,’’ while serving as the
United States Indian Agent for the
Blackfeet Agency, Montana Territory,
between 1884 and 1886. In 1892, Allen
loaned it to the Montana Historical
Society. Subsequently, it was purchased
by William Andrus Clark, who donated
it to the Society’s collections in 1900.
Consultation with Blackfeet tribal and
religious leaders confirmed that the
bonnet originated from the Blackfeet, it
is a ceremonial artifact associated with
a religious society, and it is required for
the practice of a traditional religion by
contemporary adherents. The presentday Blackfoot Confederacy (Blackfeet
Tribe, Blood Nation of Montana, Piegan
Nation of Canada, and the Siksika
Nation of Canada) is descended from the
four tribes of the Blackfoot Confederacy
as constituted during the 1880s, and is
represented in the United States by the
Blackfeet Tribe of the Blackfeet Indian
Reservation of Montana.
Officials of the Montana Historical
Society have determined, pursuant to 25
U.S.C. 3001(3)(C), that the one cultural
item is a specific ceremonial object
needed by traditional Native American
religious leaders for the practice of
traditional Native American religions by
present-day adherents. Officials of the
Montana Historical Society also have
determined, pursuant to 25 U.S.C.
3001(2), that there is a relationship of
shared group identity that can be
reasonably traced between the sacred
object and the Blackfoot Confederacy,
which is represented by the Blackfeet
Tribe of the Blackfeet Indian
Reservation of Montana.
Representatives of any other Indian
tribe that believes itself to be culturally
affiliated with the sacred object should
contact Jennifer Bottomly-O’looney,
Curator, Montana Historical Society,
225 North Roberts St., Helena, MT
59620, telephone (406) 444–4711, before
June 13, 2011. Repatriation of the sacred
object to the Blackfeet Tribe of the
Blackfeet Indian Reservation of Montana
may proceed after that date if no
additional claimants come forward.
The Montana Historical Society is
responsible for notifying the Blackfeet
Tribe of the Blackfeet Indian
Reservation of Montana that this notice
has been published.
Dated: May 9, 2011.
Sherry Hutt,
Manager, National NAGPRA Program.
[FR Doc. 2011–11869 Filed 5–12–11; 8:45 am]
BILLING CODE 4310–50–P
E:\FR\FM\13MYN1.SGM
13MYN1
Agencies
[Federal Register Volume 76, Number 93 (Friday, May 13, 2011)]
[Notices]
[Pages 28064-28065]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11657]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA 048810, LLCAD06000, L51010000.FX0000, LVRWB09B2600]
Notice of Availability of the Final Environmental Impact
Statement for Palen Solar I, LLC's Palen Solar Power Plant (PSPP) and
Proposed California Desert Conservation Area Plan Amendment
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: In accordance with the National Environmental Policy Act of
1969, as amended (NEPA), and the Federal Land Policy and Management Act
of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has
prepared a Proposed California Desert Conservation Area (CDCA) Plan
Amendment/Final Environmental Impact Statement (EIS) for the Palen
Solar Power Plant project and by this notice is announcing its
availability.
DATES: The publication of the Environmental Protection Agency's (EPA)
Notice of Availability (NOA) of this Final EIS in the Federal Register
initiates a 30-day public comment period. In addition, the BLM planning
regulations state that any person who meets the conditions as described
in the regulations at 43 CFR 1610.52 may protest the BLM's Proposed
CDCA Plan Amendment. A person who meets the conditions and files a
protest must file the protest within 30 days of the date that the EPA
publishes its notice in the Federal Register. The protest procedures
are described in the ``Dear Reader'' letter accompanying the Proposed
Plan Amendment/Final EIS.
ADDRESSES: Copies of the Palen Proposed CDCA Plan Amendment/Final EIS
have been sent to affected Federal, state, and local government
agencies and to other stakeholders. You may send your comments to the
Palm Springs South Coast Field Office, 1201 Bird Center Drive, Palm
Springs, California 92262. Copies are also available for public
inspection at this address. Interested persons may also review the
document at the following Web site: https://www.blm.gov/ca/st/en/fo/palmsprings/Solar_Projects/Palen_Solar_Power_Project.html. All
protests must be in writing and mailed to one of the following
addresses:
Regular Mail: BLM Director (210), Attention: Brenda Williams, P.O. Box
71383, Washington, DC 20024-1383.
Overnight Mail: BLM Director (210), Attention: Brenda Williams, 20 M
Street, SE., Room 2134LM, Washington, DC 20003.
FOR FURTHER INFORMATION CONTACT: For further information contact
Allison Shaffer, BLM Project Manager, telephone (760) 833-7100; 1201
Bird Center Drive, Palm Springs, California 92262 or e-mail
CAPSSolarPalen@blm.gov. Persons who use a telecommunications device for
the deaf (TDD) may call the Federal Information Relay Service (FIRS) at
1-800-877-8339 to contact the above individual during normal business
hours. The FIRS is available 24 hours a day, 7 days a week, to leave a
message or question with the above individual. You will receive a reply
during normal business hours.
SUPPLEMENTARY INFORMATION: Palen Solar I, LLC (Palen), a wholly-owned
subsidiary of Solar Millennium, Inc., has submitted a right-of-way
(ROW) application to the BLM for development of the proposed Palen
project, consisting of two parabolic-trough solar thermal power plants,
each of which has a ``solar field'' comprised of rows of parabolic
mirrors focusing solar energy on collector tubes. The tubes would carry
heated oil to a boiler that sends live steam to a steam turbine. The
project would be built in 2 phases which are designed to generate in
total approximately 500 megawatts (MW) of electricity at full
development. The proposed ROW would encompass approximately 5,200
acres; the disturbed area would encompass approximately 3,107 acres.
The project is in Riverside County, California, 10 miles east of Desert
Center along Interstate 10 halfway between the cities of Indio and
Blythe.
The major components and features of the proposed Palen project
include the two power plants, an access road, operations facilities
(office, warehouse, etc.), a switchyard, an electrical transmission
line (which will connect to Southern California Edison's planned Red
Bluff substation, 10 miles west of the Palen project site), and two
water wells. This dry-cooled power plant would use approximately 300
acre-feet of water per year for feed water makeup, dust control,
domestic uses, and mirror washing obtained from on-site water wells.
The BLM's purpose and need for the Final EIS is to respond to
Palen's application for a ROW grant to construct, operate, and
decommission a solar thermal facility on public lands in compliance
with FLPMA, the BLM ROW regulations, and other applicable Federal laws.
The BLM will decide whether to grant, grant with modification, or deny
a ROW to Palen for the proposed project. The CDCA Plan (1980, as
amended), while recognizing the potential compatibility of solar
generation facilities with other uses on public lands, requires that
all sites proposed for power generation or transmission not already
identified in the plan be considered through the plan amendment
process. If the BLM decides to grant a ROW for this project, the CDCA
Plan would be amended as required. In response to the application
received from Palen, the BLM's proposed action is to authorize the
Palen project and amend the CDCA Plan to identify the project area as
suitable for solar energy production.
In addition to the proposed action, the BLM is analyzing the
following action alternatives: Two reconfigured 500-MW alternatives
designed to reduce impacts to desert washes, dune habitat, and the
Mojave fringe-toed lizard, and a smaller 375-MW alternative. The
reconfigured 500-MW alternative that has as an option to use 240 acres
of private land, if available, is the preferred alternative. The Final
EIS also analyzes a no action alternative that would not approve a CDCA
Plan amendment and two no project alternatives that reject the project,
but amend the CDCA Plan to: (1) Designate the project area as available
to future solar energy power generation projects; or (2) designate the
project area as unavailable to future solar energy power generation
projects. The BLM will take into consideration the provisions of the
Energy Policy Act of 2005 and Secretarial Orders 3283--``Enhancing
Renewable Energy Development on the Public Lands'', and 3285A1--
``Renewable Energy Development by the Department of the Interior'' in
responding to the PSPP application.
The Final EIS evaluates the potential impacts of the proposed PSPP
and CDCA Plan Amendment on air quality, biological resources, cultural
resources, water resources, geological resources and hazards, land use,
noise, paleontological resources, public health, socioeconomics, soils,
traffic and transportation, visual resources, wilderness
characteristics, impacts to Joshua Tree National Park, and other
resources.
[[Page 28065]]
A Notice of Availability for the Palen Draft CDCA Plan Amendment/
Draft EIS was published by EPA in the Federal Register on April 7, 2010
(75 FR 17765). The formal 90-day comment period ended on July 1, 2010.
Comments were considered and incorporated as appropriate into the
Proposed CDCA Plan Amendment/Final EIS. Public comments resulted in the
addition of clarifying text and development of a modified alternative
but did not significantly change proposed land use plan decisions.
Instructions for filing a protest with the Director of the BLM
regarding the Palen project may be found in the ``Dear Reader Letter''
of the Proposed CDCA Plan Amendment/Final EIS and at 43 CFR 1610.5-2.
E-mailed and faxed protests will not be accepted as valid protests
unless the protesting party also provides the original letter by either
regular or overnight mail postmarked by the close of the protest
period. Under these conditions, the BLM will consider the e-mailed or
faxed protest as an advance copy and it will receive full
consideration. If you wish to provide the BLM with such advance
notification, please direct faxed protests to the attention of the BLM
protest coordinator at (202) 208-5010 and e-mails to Brenda_Hudgens-Williams@blm.gov. All protests, including the follow-up letter to e-
mails or faxes, must be in writing and mailed to the appropriate
address, as set forth in the ADDRESSES section above.
Before including your phone number, e-mail address, or other
personal identifying information in your protest, you should be aware
that your entire protest--including your personal identifying
information--may be made publicly available at any time. While you can
ask us in your protest to withhold your personal identifying
information from public review, we cannot guarantee that we will be
able to do so.
Authority: 40 CFR 1506.6, 1506.10, 43 CFR 1610.2, and 1610.5.
James W. Keeler,
Acting Deputy State Director, California.
[FR Doc. 2011-11657 Filed 5-12-11; 8:45 am]
BILLING CODE 4310-40-P