Notice of Effectiveness of Exempt Wholesale Generator Status, 27312 [2011-11535]
Download as PDF
27312
Federal Register / Vol. 76, No. 91 / Wednesday, May 11, 2011 / Notices
Comment Date: 5 p.m. Eastern Time
on May 16, 2011.
Dated: May 5, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–11536 Filed 5–10–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR11–107–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
BG Energy Merchants, LLC, EXCO
Operating Company, LP, v. Crosstex
LIG, LLC, Notice of Complaint
Take notice that on May 3, 2011,
pursuant to Rules 206 and 212 of the
Rules of Practice and Procedure of the
Federal Energy Regulatory Commission
(Commission), 18 CFR 385.206 and
385.212 (2010) and the Commission’s
regulations of rates and charges for
transportation services under section
311 of the Natural Gas Policy Act of
1978 (NGPA), 18 CFR 284.123 (2010),
BG Energy Merchants, LLC and EXCO
Operating Company, LP (Complainants)
filed a formal complaint against
Crosstex LIG, LLC (Respondent),
alleging that Crosstex LIG, LLC assessed
a fuel rate in violation of a stated
contract rate resulting in unfair and
inequitable charges.
Complainants state that copies of the
complaint were served upon the
Respondent’s representatives as noted
on the certificate of service and upon
the Commissioner of Conservation of
the State of Louisiana as an affected
regulatory agency.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
VerDate Mar<15>2010
17:18 May 10, 2011
Jkt 223001
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 23, 2011.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–31–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Availability
of the Environmental Assessment for
the Proposed Mid-Atlantic Connector
Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Mid-Atlantic Connector Expansion
Project (MAC Expansion Project)
proposed by Transcontinental Gas Pipe
Line Company, LLC (Transco) in the
above-referenced docket. Transco
requests authorization to abandon,
construct, and operate certain natural
Dated: May 4, 2011.
gas pipeline facilities on its existing
Kimberly D. Bose,
mainline system in Prince William,
Secretary.
Fairfax, Fluvanna, and Pittsylvania
[FR Doc. 2011–11500 Filed 5–10–11; 8:45 am]
Counties, Virginia. The purpose of the
BILLING CODE 6717–01–P
MAC Expansion Project is to increase
capacity by 142,000 dekatherms per day
from Transco’s Cascade Creek
DEPARTMENT OF ENERGY
Interconnect in Rockingham County,
North Carolina, to delivery points in
Federal Energy Regulatory
Virginia and Maryland.
Commission
The EA assesses the potential
environmental effects of the
Notice of Effectiveness of Exempt
construction and operation of the MAC
Wholesale Generator Status
Expansion Project in accordance with
the requirements of the National
Docket Nos.
Environmental Policy Act of 1969
(NEPA). The FERC staff concludes that
Settlers Trail Wind Farm,
LLC .................................... EG11–52–000. approval of the proposed project, with
Avenal Park LLC .................. EG11–53–000. appropriate mitigating measures, would
Sand Drag LLC ..................... EG11–54–000. not constitute a major Federal action
Sun City Project LLC ............ EG11–55–000. significantly affecting the quality of the
Coyote Canyon Energy LLC
EG11–56–000. human environment.
The National Park Service (NPS)
Rinehart Solar Farm LLC ..... EG11–57–000.
Sorrento Solar Farm LLC ..... EG11–58–000. participated as a cooperating agency in
Alta Wind VI, LLC ................. EG11–59–000. the preparation of the EA. Cooperating
Alta Wind VIII, LLC ............... EG11–60–000. agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
Take notice that during the month of
proposal and participate in the NEPA
April 2011, the status of the abovecaptioned entities as Exempt Wholesale analysis. The NPS will adopt and use
the EA to consider the issuance of a
Generators became effective by
right-of-way grant for the portion of the
operation of the Commission’s
MAC Expansion Project on Federal
regulations. 18 CFR 366.7(a).
lands.
Dated: May 5, 2011.
Transco’s proposed MAC Expansion
Project includes the following facilities:
Kimberly D. Bose,
• Installation of about 2.8 miles of
Secretary.
new 42-inch-diameter pipeline looping 1
[FR Doc. 2011–11535 Filed 5–10–11; 8:45 am]
and replacement in Prince William and
BILLING CODE 6717–01–P
Fairfax Counties;
• Modifications at Transco’s existing
Compressor Stations 165 and 175 in
Pittsylvania and Fluvanna Counties;
PO 00000
1 A pipeline loop is constructed parallel to an
existing pipeline to increase capacity.
Frm 00012
Fmt 4703
Sfmt 4703
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 76, Number 91 (Wednesday, May 11, 2011)]
[Notices]
[Page 27312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11535]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
Settlers Trail Wind Farm, LLC........................... EG11-52-000.
Avenal Park LLC......................................... EG11-53-000.
Sand Drag LLC........................................... EG11-54-000.
Sun City Project LLC.................................... EG11-55-000.
Coyote Canyon Energy LLC................................ EG11-56-000.
Rinehart Solar Farm LLC................................. EG11-57-000.
Sorrento Solar Farm LLC................................. EG11-58-000.
Alta Wind VI, LLC....................................... EG11-59-000.
Alta Wind VIII, LLC..................................... EG11-60-000.
------------------------------------------------------------------------
Take notice that during the month of April 2011, the status of the
above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: May 5, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11535 Filed 5-10-11; 8:45 am]
BILLING CODE 6717-01-P