Verdant Power, LLC; Notice of Availability of Environmental Assessment, 26718 [2011-11231]
Download as PDF
26718
Federal Register / Vol. 76, No. 89 / Monday, May 9, 2011 / Notices
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Tuesday, May 10, 2011.
Dated: May 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–11230 Filed 5–6–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–005]
WReier-Aviles on DSKGBLS3C1PROD with NOTICES
Verdant Power, LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed Verdant Power,
LLC’s application for a 10-year pilot
project license for the Roosevelt Island
Tidal Energy Project (FERC Project No.
12611–005), which would be located on
the East River in New York County,
New York.
Staff have prepared an environmental
assessment (EA), which analyzes the
potential environmental effects of
licensing the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major Federal
VerDate Mar<15>2010
15:23 May 06, 2011
Jkt 223001
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filings,
documents may also be paper-filed. To
paper-file, mail an original and seven
copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Please affix Project No. 12611–
005 to all comments.
For further information, contact
Timothy Konnert by telephone at 202–
502–6359 or by e-mail at
timothy.konnert@ferc.gov.
Dated: May 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–11231 Filed 5–6–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12478–003 Montana]
Gibson Dam Hydroelectric Company,
LLC; Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Gibson Dam
Hydroelectric Project, located at the U.S.
Department of the Interior, Bureau of
Reclamation’s, Gibson dam on the Sun
River in Lewis and Clark and Teton
Counties, Montana, and has prepared a
draft environmental assessment (EA) for
the project. The project would occupy a
total of 68.5 acres of Federal lands.
The draft EA contains staff’s analysis
of the potential environmental impacts
of the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
A copy of the draft EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 76, Number 89 (Monday, May 9, 2011)]
[Notices]
[Page 26718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11231]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12611-005]
Verdant Power, LLC; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission or FERC's)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed Verdant Power, LLC's application for a
10-year pilot project license for the Roosevelt Island Tidal Energy
Project (FERC Project No. 12611-005), which would be located on the
East River in New York County, New York.
Staff have prepared an environmental assessment (EA), which
analyzes the potential environmental effects of licensing the project
and concludes that licensing the project, with appropriate
environmental protective measures, would not constitute a major Federal
action that would significantly affect the quality of the human
environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
202-502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. Comments may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the
``eFiling'' link. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. Although the Commission
strongly encourages electronic filings, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. Please affix Project No. 12611-005
to all comments.
For further information, contact Timothy Konnert by telephone at
202-502-6359 or by e-mail at timothy.konnert@ferc.gov.
Dated: May 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11231 Filed 5-6-11; 8:45 am]
BILLING CODE 6717-01-P