Verdant Power, LLC; Notice of Availability of Environmental Assessment, 26718 [2011-11231]

Download as PDF 26718 Federal Register / Vol. 76, No. 89 / Monday, May 9, 2011 / Notices Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Tuesday, May 10, 2011. Dated: May 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–11230 Filed 5–6–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12611–005] WReier-Aviles on DSKGBLS3C1PROD with NOTICES Verdant Power, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC’s) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Verdant Power, LLC’s application for a 10-year pilot project license for the Roosevelt Island Tidal Energy Project (FERC Project No. 12611–005), which would be located on the East River in New York County, New York. Staff have prepared an environmental assessment (EA), which analyzes the potential environmental effects of licensing the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major Federal VerDate Mar<15>2010 15:23 May 06, 2011 Jkt 223001 action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, 202–502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filings, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please affix Project No. 12611– 005 to all comments. For further information, contact Timothy Konnert by telephone at 202– 502–6359 or by e-mail at timothy.konnert@ferc.gov. Dated: May 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–11231 Filed 5–6–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478–003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation’s, Gibson dam on the Sun River in Lewis and Clark and Teton Counties, Montana, and has prepared a draft environmental assessment (EA) for the project. The project would occupy a total of 68.5 acres of Federal lands. The draft EA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major Federal action that would significantly affect the quality of the human environment. A copy of the draft EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 76, Number 89 (Monday, May 9, 2011)]
[Notices]
[Page 26718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-11231]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12611-005]


Verdant Power, LLC; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission or FERC's) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed Verdant Power, LLC's application for a 
10-year pilot project license for the Roosevelt Island Tidal Energy 
Project (FERC Project No. 12611-005), which would be located on the 
East River in New York County, New York.
    Staff have prepared an environmental assessment (EA), which 
analyzes the potential environmental effects of licensing the project 
and concludes that licensing the project, with appropriate 
environmental protective measures, would not constitute a major Federal 
action that would significantly affect the quality of the human 
environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at  https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. Comments may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. Although the Commission 
strongly encourages electronic filings, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. Please affix Project No. 12611-005 
to all comments.
    For further information, contact Timothy Konnert by telephone at 
202-502-6359 or by e-mail at timothy.konnert@ferc.gov.

    Dated: May 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-11231 Filed 5-6-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.