Pacific Gas and Electric Company; Notice of Application Tendered for Filing With the Commission, and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 25685 [2011-10958]

Download as PDF Federal Register / Vol. 76, No. 87 / Thursday, May 5, 2011 / Notices Issued in Washington, DC, April 28, 2011. Stephanie Brown, Director, Office of Survey Development & Statistical Integration, U.S. Energy Information Administration. [FR Doc. 2011–10977 Filed 5–4–11; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2784–004] Pacific Gas and Electric Company; Notice of Application Tendered for Filing With the Commission, and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following transmission line only project application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License—Transmission Line Only. b. Project No: P–2784–004. c. Date Filed: April 18, 2011. d. Applicant: Pacific Gas and Electric Company (PG&E). e. Name of Project: Rollins Transmission Line Project. f. Location: The Rollins Transmission Line Project is located in Placer and Nevada counties, California. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Forrest Sullivan, Senior Project Manager, Pacific Gas and Electric Company, 5555 Florin Perkins Road, Sacramento, CA, 95826. Tel: (916) 386–5580. i. FERC Contact: Mary Greene, (202) 502–8865 or mary.greene@ferc.gov. j. Status: This application is not ready for environmental analysis at this time. k. Description of Project: The Project is connected with the Yuba-Bear Hydroelectric Project, FERC Project No. 2266, owned and operated by the Nevada Irrigation District (NID). The Project consists of a single circuit, 3phase, 60-kilovolt, wood-pole transmission line extending 0.72 mile from NID’s Rollins powerhouse switchyard to PG&E’s interconnected transmission grid. The project is within a 40 foot corridor. PG&E proposes to remove from the project, an access road that is 1,867 feet in length, with project widths between 20 and 60 feet. The project occupies a total of 3.46 acres, all of which is under private ownership. PG&E is not proposing to modify the existing Project and does not plan any changes to the operation or maintenance of the transmission line. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. With this notice, we are initiating consultation with the California State Historic Preservation Officer (SHPO), as required by section 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. n. Procedural schedule and final amendments: This application will be processed according to the following Licensing Schedule. Revisions to the schedule will be made if the Commission determines it necessary to do so. Milestone Tentative date Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..................................................... Commission issues Draft EIS .................................................................................................................................................. Comments on Draft EIS .......................................................................................................................................................... Modified Terms and Conditions ............................................................................................................................................... Commission Issues Final EIS .................................................................................................................................................. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice soliciting final terms and conditions. Dated: April 29, 2011. Kimberly D. Bose, Secretary. jlentini on DSKJ8SOYB1PROD with NOTICES BILLING CODE P VerDate Mar<15>2010 17:22 May 04, 2011 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11–12–000] Orlando Utilities Commission; Notice of Filing [FR Doc. 2011–10958 Filed 5–4–11; 8:45 am] Jkt 223001 Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to PO 00000 Frm 00023 Fmt 4703 25685 Sfmt 4703 June 2011. August 2011. February 2012. March 2012. May 2012. September 2012. the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the E:\FR\FM\05MYN1.SGM 05MYN1

Agencies

[Federal Register Volume 76, Number 87 (Thursday, May 5, 2011)]
[Notices]
[Page 25685]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10958]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2784-004]


Pacific Gas and Electric Company; Notice of Application Tendered 
for Filing With the Commission, and Establishing Procedural Schedule 
for Licensing and Deadline for Submission of Final Amendments

    Take notice that the following transmission line only project 
application has been filed with the Commission and is available for 
public inspection.
    a. Type of Application: Subsequent License--Transmission Line Only.
    b. Project No: P-2784-004.
    c. Date Filed: April 18, 2011.
    d. Applicant: Pacific Gas and Electric Company (PG&E).
    e. Name of Project: Rollins Transmission Line Project.
    f. Location: The Rollins Transmission Line Project is located in 
Placer and Nevada counties, California.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Forrest Sullivan, Senior Project Manager, 
Pacific Gas and Electric Company, 5555 Florin Perkins Road, Sacramento, 
CA, 95826. Tel: (916) 386-5580.
    i. FERC Contact: Mary Greene, (202) 502-8865 or 
mary.greene@ferc.gov.
    j. Status: This application is not ready for environmental analysis 
at this time.
    k. Description of Project: The Project is connected with the Yuba-
Bear Hydroelectric Project, FERC Project No. 2266, owned and operated 
by the Nevada Irrigation District (NID). The Project consists of a 
single circuit, 3-phase, 60-kilovolt, wood-pole transmission line 
extending 0.72 mile from NID's Rollins powerhouse switchyard to PG&E's 
interconnected transmission grid. The project is within a 40 foot 
corridor. PG&E proposes to remove from the project, an access road that 
is 1,867 feet in length, with project widths between 20 and 60 feet. 
The project occupies a total of 3.46 acres, all of which is under 
private ownership.
    PG&E is not proposing to modify the existing Project and does not 
plan any changes to the operation or maintenance of the transmission 
line.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the three digits in the docket 
number field to access the document. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 
208-3676, or for TTY, contact (202) 502-8659. A copy is also available 
for inspection and reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    m. With this notice, we are initiating consultation with the 
California State Historic Preservation Officer (SHPO), as required by 
section 106, National Historic Preservation Act, and the regulations of 
the Advisory Council on Historic Preservation, 36 CFR 800.4.
    n. Procedural schedule and final amendments: This application will 
be processed according to the following Licensing Schedule. Revisions 
to the schedule will be made if the Commission determines it necessary 
to do so.

------------------------------------------------------------------------
              Milestone                         Tentative date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready  June 2011.
 for Environmental Analysis.
Filing of recommendations,            August 2011.
 preliminary terms and conditions,
 and fishway prescriptions.
Commission issues Draft EIS.........  February 2012.
Comments on Draft EIS...............  March 2012.
Modified Terms and Conditions.......  May 2012.
Commission Issues Final EIS.........  September 2012.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
soliciting final terms and conditions.

    Dated: April 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10958 Filed 5-4-11; 8:45 am]
BILLING CODE P