Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, 24926-24933 [2011-10405]
Download as PDF
24926
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
available in ADAMS under accession
No. ML103570354. Stakeholders and
interested parties are encouraged to
introduce other options, issues, and
information for the NRC’s consideration.
In an effort to facilitate public
involvement, the staff previously
solicited public input during the 2011
NRC Regulatory Information Conference
(RIC), held in Rockville, MD. During the
RIC, GSI–191 was the subject of one of
the RIC technical sessions. Information
concerning the 2011 RIC is available at
https://www.nrc.gov/public-involve/
conference-symposia/ric. The GSI–191
technical session agenda and links to all
presentation documents can be found at
https://ric.nrcgateway.gov/docs/
abstracts/SessionAbstract_7.htm.
Dated at Rockville, Maryland, this 14th day
of April 2011.
For the Nuclear Regulatory Commission.
Sher Bahadur,
Acting Director, Division of Safety Systems,
Office of Nuclear Reactor Regulation.
[FR Doc. 2011–10712 Filed 5–2–11; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2011–0095]
Biweekly Notice; Applications and
Amendments to Facility Operating
Licenses Involving No Significant
Hazards Considerations
srobinson on DSKHWCL6B1PROD with NOTICES
I. Background
Pursuant to Section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (the Commission or NRC)
is publishing this regular biweekly
notice. The Act requires the
Commission publish notice of any
amendments issued, or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued from April 7,
2011, to April 20, 2011. The last
biweekly notice was published on April
19, 2011 (76 FR 21917 to 21928).
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
Title 10 of the Code of Federal
Regulations (10 CFR) 50.92, this means
that operation of the facility in
accordance with the proposed
amendment would not (1) Involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rules,
Announcements and Directives Branch
(RADB), TWB–05–B01M, Division of
Administrative Services, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and should cite the publication
date and page number of this Federal
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
Register notice. Written comments may
also be faxed to the RADB at 301–492–
3446. Documents may be examined,
and/or copied for a fee, at the NRC’s
Public Document Room (PDR), located
at One White Flint North, Room O1–
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public NRC Library
on the Internet at the NRC Web site,
https://www.nrc.gov/reading-rm/doccollections/cfr/. If a request for a hearing
or petition for leave to intervene is filed
by the above date, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and/or petition; and
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the requestor/
E:\FR\FM\03MYN1.SGM
03MYN1
srobinson on DSKHWCL6B1PROD with NOTICES
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the requestor/petitioner
intends to rely in proving the contention
at the hearing. The requestor/petitioner
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the requestor/petitioner intends
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The E-
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Filing process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
participant should contact the Office of
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E-Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through EIE, users will be
required to install a Web browser plugin from the NRC Web site. Further
information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/
e-submittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
24927
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an e-mail notice
confirming receipt of the document. The
E-Filing system also distributes an
e-mail notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
E:\FR\FM\03MYN1.SGM
03MYN1
srobinson on DSKHWCL6B1PROD with NOTICES
24928
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/EHD/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice. Nontimely filings will not be entertained
absent a determination by the presiding
officer that the petition or request
should be granted or the contentions
should be admitted, based on a
balancing of the factors specified in
10 CFR 2.309(c)(1)(i)–(viii).
For further details with respect to this
license amendment application, see the
application for amendment which is
available for public inspection at the
Commission’s PDR, located at One
White Flint North, Room O1–F21, 11555
Rockville Pike (first floor), Rockville,
Maryland 20852. Publicly available
records will be accessible from the
ADAMS Public NRC Library on the
Internet at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff at 1–800–397–4209, 301–
415–4737, or by e-mail to
pdr.resource@nrc.gov.
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Entergy Operations, Inc., System
Energy Resources, Inc., South
Mississippi Electric Power Association,
and Entergy Mississippi, Inc., Docket
No. 50–416, Grand Gulf Nuclear
Station, Unit 1, Claiborne County,
Mississippi
Date of amendment request: April 6,
2011.
Description of amendment request:
The proposed amendment would revise
the Technical Specification (TSs) to
define a new time limit for restoring
inoperable reactor coolant system (RCS)
leakage detection instrumentation to
operable status; establish alternate
methods of monitoring RCS leakage
when one or more required monitors are
inoperable; and make TS Bases changes
which reflect the proposed changes and
more accurately reflect the contents of
the facility design basis related to
operability of the RCS leakage detection
instrumentation. These changes are
consistent with NRC-approved Revision
3 to TSTF Standard Technical
Specification Change Traveler TSTF–
514, ‘‘Revise BWR Operability
Requirements and Actions for RCS
Leakage Instrumentation,’’ as part of the
consolidated line item improvement
process. In addition, the proposed
amendment would make a minor
editorial change to correct a formatting
issue to be consistent with the
Technical Specifications Task Force
TSTF–GG–05–01, ‘‘Writer’s Guide for
Plant Specific Improved Technical
Specifications,’’ and the BWR6 TS
format.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change clarifies the
operability requirements for the RCS leakage
detection instrumentation and reduces the
time allowed for the plant to operate when
the only TS-required operable RCS leakage
detection instrumentation monitor is the
drywell atmospheric gaseous radiation
monitor. The monitoring of RCS leakage is
not a precursor to any accident previously
evaluated. The monitoring of RCS leakage is
not used to mitigate the consequences of any
accident previously evaluated.
Therefore, it is concluded that this change
does not involve a significant increase in the
probability of consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
accident from any accident previously
evaluated?
Response: No.
The proposed change clarifies the
operability requirements for the RCS leakage
detection instrumentation and reduces the
time allowed for the plant to operate when
the only TS-required operable RCS leakage
detection instrumentation monitor is the
drywell atmospheric gaseous radiation
monitor. The proposed change does not
involve a physical alteration of the plant (no
new or different type of equipment will be
installed) or a change in the methods
governing normal plant operation.
Therefore, it is concluded that the
proposed change does not create the
possibility of a new or different kind of
accident from any previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change clarifies the
operability requirements for the RCS leakage
detection instrumentation and reduces the
time allowed for the plant to operate when
the only TS-required operable RCS leakage
detection instrumentation monitor is the
drywell atmospheric gaseous radiation
monitor. Reducing the amount of time the
plant is allowed to operate with only the
drywell atmospheric gaseous radiation
monitor operable increase the margin of
safety by increasing the likelihood that an
increase in RCS leakage will be detected
before it potentially results in gross failure.
Therefore, it is concluded that the
proposed change does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Terence A.
Burke, Associate General Counsel—
Nuclear Entergy Services, Inc., 1340
Echelon Parkway, Jackson, Mississippi
39213.
NRC Branch Chief: Michael T.
Markley.
Exelon Generation Company, LLC,
Docket No. 50–289, Three Mile Island
Nuclear Station, Unit 1, Dauphin
County, Pennsylvania
Date of amendment request:
September 22, 2010, as supplemented
by letter dated April 7, 2011.
Description of amendment request:
This notice is being reissued in its
entirety due to a modified submittal
received from Exelon Generation
Company, LLC. The original notice was
published in the Federal Register on
November 30, 2010 (75 FR 74095). The
proposed amendment would relocate
the list of pumps, fans, and valves in
Technical Specification (TS) 4.5.1.1b,
E:\FR\FM\03MYN1.SGM
03MYN1
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
srobinson on DSKHWCL6B1PROD with NOTICES
Sequence and Power Transfer Test, to
the Three Mile Island, Unit 1 (TMI–1)
Updated Final Safety Analysis Report.
In place of the TS equipment listing
there will be a more general reference to
the permanently-connected and
automatically-connected emergency
loads which are tested through the load
sequencer. In addition, TS 4.5.1.2b, TS
4.5.2.2a, and TS 4.5.2.2b refer to this
test and are proposed for revision to
reflect the proposed change to TS
4.5.1.1b.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed license amendment does not
add, delete or modify plant equipment. The
proposed changes are administrative in
nature. The proposed amendment would
relocate the list of pumps, fans and valves in
Technical Specification (TS) 4.5.1.lb,
Sequence and Power Transfer Test, to the
TMI–1 Updated Final Safety Analysis Report
(UFSAR) Section 8.2, Table 8.2–11,
Engineered Safeguards Loading Sequence. In
addition, TS 4.5.1.1b and TS 4.5.1.2b are
being modified to include a high level
description of equipment required to be
included in the Sequence and Power Transfer
Test, and the Sequence Test, respectively.
The proposed changes relocate
surveillance requirement details that are not
required by 10 CFR 50.36. The proposed
changes do not change current surveillance
requirements. The subject list of pumps, fans
and valves that will be relocated to UFSAR
Section 8.2, Table 8.2–11, will be controlled
under 10 CFR 50.59.
The probability of an accident is not
increased by these proposed changes because
neither the Sequence and Power Transfer
Test nor the Sequence Test are initiators of
any design basis event. Additionally, the
proposed changes do not involve any
physical changes to plant structures, systems,
or components (SSCs), or the manner in
which these SSCs are operated, maintained,
or controlled. The consequences of an
accident will not be increased because the
proposed administrative changes to the
Sequence and Power Transfer Test, and the
Sequence Test, will continue to provide a
high degree of assurance that the Electric
Power System will meet its safety related
function.
Therefore, the proposed changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any previously evaluated?
Response: No.
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
The proposed changes do not alter the
physical design, safety limits, safety analyses
assumptions, or the manner in which the
plant is operated or tested. The proposed
changes are administrative in nature and the
surveillance requirements remain the same.
Accordingly, the proposed changes do not
introduce any new accident initiators, nor do
they reduce or adversely affect the
capabilities of any plant SSC in the
performance of their safety function.
Therefore, the proposed changes do not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The margin of safety is associated with the
confidence in the ability of the fission
product barriers (i.e., fuel cladding, reactor
coolant pressure boundary, and containment
structure) to limit the level of radiation to the
public. There are no physical changes to
SSCs or operating and testing procedures
associated with the proposed amendment.
The proposed changes do not impact the
assumptions of any design basis accident,
and do not alter assumptions relative to the
mitigation of an accident or transient event.
The proposed changes are administrative in
nature and the surveillance requirements
remain the same.
Therefore, the proposed changes do not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: J. Bradley
Fewell, Esquire, Associate General
Counsel, Exelon Generation Company,
LLC, 4300 Winfield Road, Warrenville,
IL 60555.
NRC Branch Chief: Harold K.
Chernoff.
PSEG Nuclear LLC, Docket No. 50–354,
Hope Creek Generating Station, Salem
County, New Jersey
Date of amendment request: February
28, 2011.
Description of amendment request:
The proposed amendment would
modify the Hope Creek Generating
Station (HCGS) Technical Specifications
(TSs) to revise the existing TS for the
Control Room Emergency Filtration
(CREF) system and to add a new TS for
the Control Room Air Conditioning (AC)
system. The proposed amendment is
based, in part, on Nuclear Regulatory
Commission (NRC)-approved Technical
Specification Task Force (TSTF)
Standard TS (STS) Change Traveler
TSTF–477, Revision 3, ‘‘Adding an
Action Statement for Two Inoperable
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
24929
Control Room Air Conditioning
Subsystems.’’ Plant-specific deviations
from TSTF–477 are proposed to
accommodate differences between the
HCGS TSs and the STSs originally used
to develop TSTF–477.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes add a separate
Technical Specification (TS) for the Control
Room Air Conditioning (AC) system, and
renumbers and revises the existing TS for the
Control Room Emergency Filtration (CREF)
system. Consistent with Technical
Specification Task Force (TSTF) Standard TS
Change Traveler TSTF–477, the proposed
change also adds an action statement for two
inoperable Control Room AC subsystems.
The proposed change does not involve a
physical alteration of the plant (no new or
different type of equipment will be installed).
The proposed changes add a separate TS for
the Control Room AC system and an action
statement for two inoperable control room
subsystems. The equipment qualification
temperature of the control room equipment is
not affected. Future changes to the Bases or
licensee-controlled document[s] will be
evaluated pursuant to the requirements of
10 CFR 50.59, ‘‘Changes, test and
experiments,’’ to ensure that such changes do
not result in more than a minimal increase
in the probability or consequences of an
accident previously evaluated.
The proposed changes do not adversely
affect accident initiators or precursors nor
alter the design assumptions, conditions, and
configuration of the facility or the manner in
which the plant is operated and maintained.
The proposed changes do not adversely affect
the ability of structures, systems and
components (SSCs) to perform their intended
safety function to mitigate the consequences
of an initiating event within the assumed
acceptance limits. The proposed changes do
not affect the source term, containment
isolation, or radiological consequences of any
accident previously evaluated. Further, the
proposed changes do not increase the types
and the amounts of radioactive effluent that
may be released, nor significantly increase
individual or cumulative occupation/public
radiation exposures.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes add a separate TS
for the Control Room AC system and an
E:\FR\FM\03MYN1.SGM
03MYN1
24930
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
action statement for two inoperable control
room subsystems. The changes do not
involve a physical altering of the plant (i.e.,
no new or different type of equipment will
be installed) or a change in methods
governing normal plant control room
temperature within the design limits.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed changes add a separate TS
for the Control Room AC system and an
action statement for two inoperable control
room subsystems. Instituting the proposed
changes will continue to maintain the control
room temperature within design limits.
Changes to the Bases or license[e-]controlled
document[s] are performed in accordance
with 10 CFR 50.59. This approach provides
an effective level of regulatory control and
ensures that the control room temperature
will be maintained within design limits.
The proposed changes maintain sufficient
controls to preserve the current margins of
safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Jeffrie J. Keenan,
PSEG Nuclear LLC—N21, P.O. Box 236,
Hancocks Bridge, NJ 08038.
NRC Branch Chief: Harold K.
Chernoff.
srobinson on DSKHWCL6B1PROD with NOTICES
Tennessee Valley Authority, Docket
Nos. 50–260 and 50–296, Browns Ferry
Nuclear Plant (BFN), Units 2 and 3,
Limestone County, Alabama
Date of amendment request: February
25, 2011.
Description of amendment request:
The proposed amendments would
delete Technical Specification (TS)
Surveillance Requirement 3.5.1.12,
which requires the verification of the
capability to automatically transfer the
power supply from the normal source to
the alternate source for each Low
Pressure Coolant Injection (LPCI)
subsystem inboard injection valve and
each recirculation pump discharge valve
on a 24-month frequency.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
1. Does the proposed Technical
Specification change involve a significant
increase in the probability or consequences
of an accident previously evaluated?
Response: No.
The 480V RMOV Boards D or E, the
equipment they power, or the automatic
power transfer feature provided for these
boards are not precursors to any accident
previous evaluated in the Updated Final
Safety Analysis Report (UFSAR). Therefore,
the probability of an evaluated accident is
not increased by modifying this equipment.
The proposed deletion of the requirement to
maintain the automatic transfer capability for
the power supply to the LPCI inboard
injection valves, RHR [residual heat removal]
minimum flow valves and recirculation
pump discharge valves does not change the
number of Emergency Core Cooling System
(ECCS) subsystems credited in the BFN
licensing basis. The proposed change does
not affect the operational characteristics or
function of systems, structures, or
components (SSCs), the interfaces between
credited SSCs and other plant systems, or the
reliability of SSCs. The proposed change
does not impact the capability of credited
SSCs to perform their required safety
functions.
Therefore, the proposed TS changes will
not significantly increase the consequences
of an accident previously evaluated.
2. Does the proposed Technical
Specification change create the possibility of
a new or different kind of accident from any
accident previously evaluated?
Response: No.
The proposed deletion of the requirement
to maintain an automatic transfer capability
for the power supply to the LPCI inboard
injection valves, RHR minimum flow valves
and recirculation pump discharge valves
does not introduce new equipment, which
could create a new or different kind of
accident.
The proposed change does not alter the
manner in which equipment operation is
initiated, nor will the functional demands on
credited equipment be changed. The
capability of credited SSCs to perform their
required function will not be affected by the
proposed change. In addition, the proposed
change does not affect the interaction of plant
SSCs with other plant SSCs whose failure or
malfunction can initiate an accident or
transient. As such, no new failure modes are
being introduced. No new external threats,
release pathways, or equipment failure
modes are created. Therefore, the proposed
deletion of the requirement to maintain an
automatic transfer capability for the power
supply to the LPCI inboard injection valves,
RHR minimum flow valves and recirculation
pump discharge valves will not create a
possibility for an accident of a new or
different type than those previously
evaluated.
3. Does the proposed Technical
Specification change involve a significant
reduction in a margin of safety?
Response: No.
The proposed deletion of the requirement
to maintain an automatic transfer capability
for the power supply to the LPCI inboard
injection valves, RHR minimum flow valves
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
and recirculation pump discharge valves
does not change the conditions, operating
configurations, or minimum amount of
operating equipment credited in the safety
analyses for accident or transient mitigation.
The proposed change does not alter the
assumptions contained in the safety analyses.
The proposed change does not alter the
manner in which safety limits, limiting safety
system settings or limiting conditions for
operation are determined. The proposed
change does not impact the safety analysis
credited redundancy or availability of SSCs
required for accident or transient mitigation,
or the ability of the plant to cope with design
basis events as assumed in safety analyses. In
addition, no changes are proposed in the
manner in which the credited SSCs provide
plant protection or which create new modes
of plant operation. The requirements of
10 CFR 50.46 and Appendix K continue to
be met. Therefore, the proposed change does
not involve a significant reduction in the
margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: General
Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, 6A West
Tower, Knoxville, Tennessee 37902.
NRC Branch Chief: Douglas A.
Broaddus.
Notice of Issuance of Amendments to
Facility Operating Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
Notice of Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for A Hearing in
connection with these actions was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
E:\FR\FM\03MYN1.SGM
03MYN1
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and
(3) the Commission’s related letter,
Safety Evaluation and/or Environmental
Assessment as indicated. All of these
items are available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Room O1–F21, 11555 Rockville
Pike (first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System (ADAMS) Public NRC Library
on the internet at the NRC Web site,
https://www.nrc.gov/reading-rm/
adams.html. If you do not have access
to ADAMS or if there are problems in
accessing the documents located in
ADAMS, contact the PDR Reference
staff at 1–800–397–4209, 301–415–4737
or by email to pdr.resource@nrc.gov.
srobinson on DSKHWCL6B1PROD with NOTICES
Carolina Power and Light Company,
Docket Nos. 50–325 and 50–324,
Brunswick Steam Electric Plant, Units
1 and 2, Brunswick County, North
Carolina
Date of application for amendments:
April 29, 2010, as supplemented by
letters dated June 9, July 22, July 29,
September 29, October 12, November 9,
November 18, and December 16, 2010;
March 16, and April 6, 2011.
Brief description of amendments: The
proposed license amendments revised
the Brunswick Steam Electric Plant
(BSEP), Units 1 and 2, Technical
Specification 5.6.5.b by adding AREVA
topical report, BAW–10247PA,
‘‘Realistic Thermal-Mechanical Fuel Rod
Methodology for Boiling Water
Reactors,’’ Revision 0, April 2008, to the
list of analytical methods that have been
reviewed and approved by the NRC for
determining core operating limits. The
proposed amendments changed the
BSEP Technical Specifications to
support transition to ATRIUM 10XM
fuel and associated core design
methodologies.
Date of issuance: April 8, 2011.
Effective date: Date of issuance, to be
implemented prior to startup from the
2011 refueling outage (RFO) for Unit 2,
and prior to startup from the 2012 RFO
for Unit 1.
Amendment Nos.: Unit 1—256 and
Unit 2—284.
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Renewed Facility Operating License
Nos. DPR–71 and DPR–62: Amendments
revised the Technical Specifications.
Date of initial notice in Federal
Register: August 10, 2010 (75 FR
48373). The supplemental letters dated
June 9, July 29, September 29, October
12, November 9, November 18, and
December 16, 2010; March 16 and April
6, 2011, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 8, 2011.
No significant hazards consideration
comments received: No.
Carolina Power and Light Company,
Docket Nos. 50–325 and 50–324,
Brunswick Steam Electric Plant, Units
1 and 2, Brunswick County, North
Carolina
Date of application for amendments:
April 29, 2010, as supplemented by
letters dated June 9, July 22, July 29,
September 29, October 12, November 9,
November 18, and December 16, 2010,
and April 6, 2011.
Brief description of amendments: The
proposed license amendments revised
the Brunswick Steam Electric Plant
(BSEP), Units 1 and 2, Technical
Specification (TS) 5.6.5.b by adding the
AREVA, topical report, ANP–10298PA,
‘‘ACE/ATRIUM 10XM Critical Power
Correlation,’’ Revision 0, March 2010, to
the list of analytical methods that have
been reviewed and approved by the
NRC for determining core operating
limits. The proposed amendments
changed the BSEP Units 1 and 2 TSs to
support transition to ATRIUM 10XM
fuel and associated core design
methodologies.
Date of issuance: April 8, 2011.
Effective date: Upon date of issuance
and implemented prior to startup from
the 2011 refueling outage (RFO) for Unit
2 and prior to start-up from the 2012
RFO for Unit 1.
Amendment Nos.: Unit 1—257 and
Unit 2—285.
Renewed Facility Operating License
Nos. DPR–71 and DPR–62: Amendments
revised the TSs.
Date of initial notice in Federal
Register: August 10, 2010 (75 FR
48372). The supplemental letters dated
June 9, July 29, September 29, October
12, November 9, November 18, and
December 16, 2010, and April 6, 2011,
provided additional information that
clarified the application, did not expand
PO 00000
Frm 00084
Fmt 4703
Sfmt 4703
24931
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 8, 2011.
No significant hazards consideration
comments received: No.
Entergy Operations, Inc., Docket No.
50–368, Arkansas Nuclear One, Unit 2,
Pope County, Arkansas
Date of application for amendment:
June 17, 2010, as supplemented by
letters dated January 17, 20, and 31 and
March 7, 2011.
Brief description of amendment: The
amendment revised Technical
Specification 6.5.16, ‘‘Containment
Leakage Rate Testing Program,’’ to allow
for the extension of the 10-year
frequency of the Arkansas Nuclear One,
Unit 2 Type A or Integrated Leak Rate
Test to 15 years on a permanent basis.
Date of issuance: April 7, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 30 days from the date of
issuance.
Amendment No.: 292.
Renewed Facility Operating License
No. NPF–6: Amendment revised the
Technical Specifications/license.
Date of initial notice in Federal
Register: July 27, 2010 (75 FR 44024).
The supplemental letters dated January
17, 20, and 31 and March 7, 2011,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated April 7, 2011.
No significant hazards consideration
comments received: No.
Exelon Generation Company, LLC,
Docket Nos. STN 50–456 and STN 50–
457, Braidwood Station, Units 1 and 2,
Will County, Illinois; Docket Nos. STN
50–454 and STN 50–455, Byron Station,
Unit Nos. 1 and 2, Ogle County, Illinois
Date of application for amendment:
December 14, 2010.
Brief description of amendment: The
amendments revised Technical
Specification (TS) 5.5.9, ‘‘Steam
Generator (SG) Program,’’ to exclude
portions of the tubes within the
tubesheet from periodic steam generator
(SG) inspections and plugging or repair.
In addition, these amendments revise
TS 5.6.9, ‘‘Steam Generator (SG) Tube
E:\FR\FM\03MYN1.SGM
03MYN1
24932
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
Inspection Report,’’ to remove reference
to previous interim alternate repair
criteria and provide reporting
requirements specific to the temporary
alternate criteria.
Date of issuance: April 13, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 30 days for Braidwood Station,
Units 1 and 2, for Byron Station, Unit
Nos. 1 and 2 prior to conducting the SG
inspections required by TS 5.5.9 for the
Byron Station, Unit No. 2, fall 2011
refueling outage (B2R16).
Amendment Nos.: 166 and 172.
Facility Operating License Nos. NPF–
72, NPF–77, NPF–37, and NPF–66: The
amendments revised the Technical
Specifications and License.
Date of initial notice in Federal
Register: February 1, 2011 (76 FR 5617).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 13, 2011.
No significant hazards consideration
comments received: No.
srobinson on DSKHWCL6B1PROD with NOTICES
Exelon Generation Company, LLC,
Docket Nos. 50–373 and 50–374,
LaSalle County Station, Units 1 and 2,
LaSalle County, Illinois
Date of application for amendments:
April 19, 2010, as supplemented by
letters dated October 15, 2010, and
March 14, 2011.
Brief description of amendments: The
amendment request proposed changes
to the technical specifications (TSs) to
revise TS 3.4.11, ‘‘RCS [reactor coolant
system] Pressure and Temperature (P/T)
[or P–T] Limits,’’ to incorporate revised
P–T curves that are valid for up to 32
effective full power years (EFPYs) of
operation.
Date of issuance: April 15, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment Nos.: 201/188.
Facility Operating License Nos. NPF–
11 and NPF–18: The amendments
revised the Technical Specifications and
License.
Date of initial notice in Federal
Register: June 29, 2010 (75 FR 37475).
The October 15, 2010, and March 14,
2011, supplements contained clarifying
information and did not change the NRC
staff’s initial proposed finding of no
significant hazards consideration.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 15, 2011.
No significant hazards consideration
comments received: No.
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Exelon Generation Company, LLC,
Docket Nos. 50–352 and 50–353,
Limerick Generating Station (LGS),
Units 1 and 2, Montgomery County,
Pennsylvania
Date of application for amendment:
March 25, 2010, as supplemented by
letters dated April 26, 2010, June 29,
2010, July 22, 2010, July 28, 2010 (2),
August 10, 2010, August 12, 2010 (2),
August 30, 2010, December 17, 2010,
and January 7, 2011.
Brief description of amendment: The
changes implemented an increase of
approximately 1.65 percent in rated
thermal power from the current licensed
thermal power of 3458 megawatts
thermal (MWt) to 3515 MWt. The
changes are based on increased
feedwater flow measurement accuracy,
which will be achieved by utilizing
Cameron International (formerly
Caldon) CheckPIus Leading Edge Flow
Meter ultrasonic flow measurement
instrumentation. The changes also
modified certain technical specification
setpoints and channel surveillance
requirements associated with average
power range monitor simulated thermal
power. Additionally, the proposed
changes include a modification to the
Standby Liquid Control System, that
allows operators to select two pumps
instead of three for the automatic start
function on an Anticipated Transient
Without Scram signal.
Date of issuance: April 8, 2011.
Effective date: For LGS Unit 1, as of
the date of issuance and shall be
implemented within 90 days of
issuance. For LGS Unit 2, as of the date
of issuance and shall be implemented
within 90 days of the completion of
refueling outage Li2R11.
Amendment Nos.: 201 and 163.
Facility Operating License Nos. NPF–
39 and NPF–85. These amendments
revised the license and the technical
specifications.
Date of initial notice in Federal
Register: June 8, 2010 (75 FR 32512).
The supplements dated April 26, 2010,
June 29, 2010, July 22, 2010, July 28,
2010 (2), August 10, 2010, August 12,
2010 (2), August 30, 2010, December 17,
2010, and January 7, 2011, provided
additional information that clarified the
application, did not expand the scope of
the application as originally noticed and
did not change the NRC staff’s original
proposed no significant hazards
determination.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 8, 2011.
No significant hazards consideration
comments received: No.
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
FirstEnergy Nuclear Operating
Company, et al., Docket No. 50–440,
Perry Nuclear Power Plant, Unit 1,
Lake County, Ohio
Date of application for amendment:
October 21, 2010, as supplemented by
letters dated February 2, 2011, and
March 17, 2011.
Brief description of amendment: This
license amendment modified Technical
Specification 2.1.1, ‘‘Reactor Core SLs,’’
by incorporating revised safety limit
minimum critical power ratio values
resulting from a plant-specific analysis
performed for PNPP Cycle 14 core.
Date of issuance: April 18, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 60 days.
Amendment No.: 155.
Facility Operating License No. NPF–
58: This amendment revised the
Technical Specifications and License.
Date of initial notice in Federal
Register: January 11, 2011 (76 FR 1649).
The February 2, 2011 and March 17,
2011 supplements contained clarifying
information and did not change the NRC
staff’s initial proposed finding of
significant hazards consideration
published in the Federal Register (76
FR 1649, January 11, 2011).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated April 18, 2011.
No significant hazards consideration
comments received: No.
NextEra Energy, Point Beach, LLC,
Docket Nos. 50–266 and 50–301, Point
Beach Nuclear Plant, Units 1 and 2,
Town of Two Creeks, Manitowoc
County, Wisconsin
Date of application for amendments:
December 8, 2008, as supplemented by
letters dated January 16, January 27,
February 20, April 17 (two letters), May
8, May 15, June 1, July 24, August 20,
September 4 (two letters), September 10,
October 2, November 20, November 25,
and December 17 of 2009; January 14,
February 4 (two letters), March 5, April
20, July 8, July 29, August 12,
September 3, October 12, and November
16 of 2010; January 27 and February 10
of 2011.
Brief description of amendments: The
amendments modified the requirements
of TS 3.4.16, ‘‘RCS [reactor coolant
system] Specific Activity,’’ and TS
3.7.13, ‘‘Secondary Specific Activity,’’ as
related to the use of an alternate source
term (AST) associated with accident
offsite and control room dose
consequences. Implementation of the
AST supports adoption of the control
room envelope habitability controls in
accordance with NRC-approved TS Task
E:\FR\FM\03MYN1.SGM
03MYN1
Federal Register / Vol. 76, No. 85 / Tuesday, May 3, 2011 / Notices
srobinson on DSKHWCL6B1PROD with NOTICES
Force (TSTF) Standard Technical
Specification change traveler TSTF–448,
Revision 3, ‘‘Control Room Habitability.’’
To support this change, the amendment
modified the following: 1) TS 1.1,
‘‘Definitions’’; 2) TS 3.7.9, ‘‘Control
Room Emergency Filtration System
(CREFS),’’ Limiting Condition for
Operation 3.7.9, including Surveillance
Requirements 3.7.9.2, 3.7.9.3, and
3.7.9.6; 3) TS 5.5.15, ‘‘Containment
Leakage Rate Testing Program’’; 4) the
addition of TS 5.5.18, ‘‘Control Room
Envelope Habitability.’’ Finally, TS
5.6.4, ‘‘Core Operating Limits Report
(COLR),’’ will incorporate the addition
of the NRC-approved analytical
methodology as described in WCAP–
16259–P–A, ‘‘Westinghouse
Methodology for Application of 3–D
Transient Neutronics to Non-LOCA
Analyses.’’
Date of issuance: April 14, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 180 days.
Amendment Nos.: 240, 244.
Renewed Facility Operating License
Nos. DPR–24 and DPR–27: Amendments
revised the License, Appendix C, and
the Technical Specifications.
Date of initial notice in Federal
Register: October 12, 2010 (75 FR
62602).
The supplemental letters contained
clarifying information and did not
change the staff’s initial proposed
finding of no significant hazards
consideration.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 14, 2011.
No significant hazards consideration
comments received: No.
Virginia Electric and Power Company,
Docket No. 52–008, North Anna Early
Site Permit (ESP) Site, Louisa County,
Virginia
Date of amendment request:
September 2, 2010.
Description of amendment request:
The amendment revised the North Anna
Early Site Permit by deleting condition
3.G, which prescribes the notification
and certification requirements
associated with beginning the site
preparation and preliminary
construction activities approved by
ESP–003.
Date of issuance: April 13, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 60 days from the date of
issuance.
Amendment No.: Two.
Early Site Permit No. ESP–003:
Amendment revised the North Anna site
ESP.
VerDate Mar<15>2010
20:39 May 02, 2011
Jkt 223001
Public comments requested as to
proposed no significant hazards
consideration (NSHC): Yes.
Date of initial notice in the Federal
Register (FR): November 30, 2010 (75
FR 74105). The November 30, 2010 FR
notice provided an opportunity to
submit comments on the Commission’s
proposed NSHC determination. No
comments have been received.
The Commission’s related evaluation
of the requested approval of the
amendment, and state consultation, are
contained in a safety evaluation dated
April 13, 2011. The NRC staff
determined that the amendment
satisfied the categorical exclusion
criterion of 10 CFR 51.22(c) and no
environmental assessment was required.
Attorney for the licensee: Lillian M.
Cuoco, Senior Counsel, Dominion
Resources Services, Inc., 120 Tredegar
Street, RS–2, Richmond, VA 23219.
NRC Branch Chief: Hossein
Hamzehee.
Virginia Electric and Power Company,
Docket Nos. 50–338 and 50–339, North
Anna Power Station, Units 1 and 2,
Louisa County, Virginia
Date of application for amendment:
May 6, 2010.
Brief description of amendment:
These amendments revised TS 4.2.1,
‘‘Fuel Assemblies,’’ to add Optimized
ZIRLOTM as an acceptable fuel rod
cladding material. In addition, the
amendments revised TS 5.6.5.b to add
the Westinghouse topical report for
Optimized ZIRLOTM to the list of
analytical methods used to determine
the core operating limits.
Date of issuance: April 14, 2011.
Effective date: As of the date of
issuance and shall be implemented
within 60 days from the date of
issuance.
Amendment Nos.: 263 and 244.
Renewed Facility Operating License
Nos. NPF–4 and NPF–7: Amendments
changed the licenses and the technical
specifications.
Date of initial notice in Federal
Register: August 27, 2010 (75 FR
52781).
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated April 14, 2011.
No significant hazards consideration
comments received: No.
Wolf Creek Nuclear Operating
Corporation, Docket No. 50–482, Wolf
Creek Generating Station, Coffey
County, Kansas
Date of amendment request: October
21, 2010.
Brief description of amendment: The
amendment corrected a typographical
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
24933
error in Technical Specification (TS)
5.0, ‘‘ADMINISTRATIVE CONTROLS.’’
The current TSs, on page 5.0–31, has
two paragraphs numbered as 5.7.2.d.3.
The amendment renumbered the second
paragraph as 5.7.2.d.4.
Date of issuance: April 19, 2011.
Effective date: As the date of issuance
and shall be implemented within 90
days of the date of issuance.
Amendment No.: 196.
Renewed Facility Operating License
No. NPF–42. The amendment revised
the Operating License and Technical
Specifications.
Date of initial notice in Federal
Register: December 14, 2010 (75 FR
77917).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated April 19, 2011.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 21st day
of April 2011.
For the Nuclear Regulatory Commission.
Robert A. Nelson,
Deputy Director, Division of Operating
Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2011–10405 Filed 5–2–11; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2011–0006]
Sunshine Federal Register Notice
Nuclear
Regulatory Commission.
DATE: Weeks of May 2, 9, 16, 23, 30,
June 6, 13, 2011.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
AGENCY HOLDING THE MEETINGS:
Week of May 2, 2011
Tuesday, May 3, 2011
9 a.m. Information Briefing on
Emergency Preparedness (Public
Meeting). (Contact: Robert Kahler,
301–415–7528.)
This meeting will be webcast live at
the Web address—https://www.nrc.gov.
Week of May 9, 2011—Tentative
Thursday, May 12, 2011
9:30 a.m. Briefing on the Progress of
the Task Force Review of NRC
Processes and Regulations Following
the Events in Japan (Public Meeting)
(Contact: Nathan Sanfilippo, 301–
415–3951.)
E:\FR\FM\03MYN1.SGM
03MYN1
Agencies
[Federal Register Volume 76, Number 85 (Tuesday, May 3, 2011)]
[Notices]
[Pages 24926-24933]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10405]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2011-0095]
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses Involving No Significant Hazards Considerations
I. Background
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC) is publishing this regular biweekly notice. The Act
requires the Commission publish notice of any amendments issued, or
proposed to be issued and grants the Commission the authority to issue
and make immediately effective any amendment to an operating license
upon a determination by the Commission that such amendment involves no
significant hazards consideration, notwithstanding the pendency before
the Commission of a request for a hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued from April 7, 2011, to April 20, 2011. The last
biweekly notice was published on April 19, 2011 (76 FR 21917 to 21928).
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses, Proposed No Significant Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in Title 10 of the Code of Federal
Regulations (10 CFR) 50.92, this means that operation of the facility
in accordance with the proposed amendment would not (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules,
Announcements and Directives Branch (RADB), TWB-05-B01M, Division of
Administrative Services, Office of Administration, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and should cite the
publication date and page number of this Federal Register notice.
Written comments may also be faxed to the RADB at 301-492-3446.
Documents may be examined, and/or copied for a fee, at the NRC's Public
Document Room (PDR), located at One White Flint North, Room O1-F21,
11555 Rockville Pike (first floor), Rockville, Maryland 20852.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Room O1-F21,
11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly
available records will be accessible from the Agencywide Documents
Access and Management System's (ADAMS) Public NRC Library on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to
intervene is filed by the above date, the Commission or a presiding
officer designated by the Commission or by the Chief Administrative
Judge of the Atomic Safety and Licensing Board Panel, will rule on the
request and/or petition; and the Secretary or the Chief Administrative
Judge of the Atomic Safety and Licensing Board will issue a notice of a
hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the requestor/
[[Page 24927]]
petitioner seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor/petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, then any hearing
held would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the participant should
contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1)
a digital identification (ID) certificate, which allows the participant
(or its counsel or representative) to digitally sign documents and
access the E-Submittal server for any proceeding in which it is
participating; and (2) advise the Secretary that the participant will
be submitting a request or petition for hearing (even in instances in
which the participant, or its counsel or representative, already holds
an NRC-issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's public Web site at
https://www.nrc.gov/site-help/e-submittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through EIE, users will be required to install a Web
browser plug-in from the NRC Web site. Further information on the Web-
based submission form, including the installation of the Web browser
plug-in, is available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on
[[Page 24928]]
all other participants. Filing is considered complete by first-class
mail as of the time of deposit in the mail, or by courier, express
mail, or expedited delivery service upon depositing the document with
the provider of the service. A presiding officer, having granted an
exemption request from using E-Filing, may require a participant or
party to use E-Filing if the presiding officer subsequently determines
that the reason for granting the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
For further details with respect to this license amendment
application, see the application for amendment which is available for
public inspection at the Commission's PDR, located at One White Flint
North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville,
Maryland 20852. Publicly available records will be accessible from the
ADAMS Public NRC Library on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in
ADAMS, should contact the NRC PDR Reference staff at 1-800-397-4209,
301-415-4737, or by e-mail to pdr.resource@nrc.gov.
Entergy Operations, Inc., System Energy Resources, Inc., South
Mississippi Electric Power Association, and Entergy Mississippi, Inc.,
Docket No. 50-416, Grand Gulf Nuclear Station, Unit 1, Claiborne
County, Mississippi
Date of amendment request: April 6, 2011.
Description of amendment request: The proposed amendment would
revise the Technical Specification (TSs) to define a new time limit for
restoring inoperable reactor coolant system (RCS) leakage detection
instrumentation to operable status; establish alternate methods of
monitoring RCS leakage when one or more required monitors are
inoperable; and make TS Bases changes which reflect the proposed
changes and more accurately reflect the contents of the facility design
basis related to operability of the RCS leakage detection
instrumentation. These changes are consistent with NRC-approved
Revision 3 to TSTF Standard Technical Specification Change Traveler
TSTF-514, ``Revise BWR Operability Requirements and Actions for RCS
Leakage Instrumentation,'' as part of the consolidated line item
improvement process. In addition, the proposed amendment would make a
minor editorial change to correct a formatting issue to be consistent
with the Technical Specifications Task Force TSTF-GG-05-01, ``Writer's
Guide for Plant Specific Improved Technical Specifications,'' and the
BWR6 TS format.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change clarifies the operability requirements for
the RCS leakage detection instrumentation and reduces the time
allowed for the plant to operate when the only TS-required operable
RCS leakage detection instrumentation monitor is the drywell
atmospheric gaseous radiation monitor. The monitoring of RCS leakage
is not a precursor to any accident previously evaluated. The
monitoring of RCS leakage is not used to mitigate the consequences
of any accident previously evaluated.
Therefore, it is concluded that this change does not involve a
significant increase in the probability of consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change clarifies the operability requirements for
the RCS leakage detection instrumentation and reduces the time
allowed for the plant to operate when the only TS-required operable
RCS leakage detection instrumentation monitor is the drywell
atmospheric gaseous radiation monitor. The proposed change does not
involve a physical alteration of the plant (no new or different type
of equipment will be installed) or a change in the methods governing
normal plant operation.
Therefore, it is concluded that the proposed change does not
create the possibility of a new or different kind of accident from
any previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change clarifies the operability requirements for
the RCS leakage detection instrumentation and reduces the time
allowed for the plant to operate when the only TS-required operable
RCS leakage detection instrumentation monitor is the drywell
atmospheric gaseous radiation monitor. Reducing the amount of time
the plant is allowed to operate with only the drywell atmospheric
gaseous radiation monitor operable increase the margin of safety by
increasing the likelihood that an increase in RCS leakage will be
detected before it potentially results in gross failure.
Therefore, it is concluded that the proposed change does not
involve a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Terence A. Burke, Associate General
Counsel--Nuclear Entergy Services, Inc., 1340 Echelon Parkway, Jackson,
Mississippi 39213.
NRC Branch Chief: Michael T. Markley.
Exelon Generation Company, LLC, Docket No. 50-289, Three Mile Island
Nuclear Station, Unit 1, Dauphin County, Pennsylvania
Date of amendment request: September 22, 2010, as supplemented by
letter dated April 7, 2011.
Description of amendment request: This notice is being reissued in
its entirety due to a modified submittal received from Exelon
Generation Company, LLC. The original notice was published in the
Federal Register on November 30, 2010 (75 FR 74095). The proposed
amendment would relocate the list of pumps, fans, and valves in
Technical Specification (TS) 4.5.1.1b,
[[Page 24929]]
Sequence and Power Transfer Test, to the Three Mile Island, Unit 1
(TMI-1) Updated Final Safety Analysis Report. In place of the TS
equipment listing there will be a more general reference to the
permanently-connected and automatically-connected emergency loads which
are tested through the load sequencer. In addition, TS 4.5.1.2b, TS
4.5.2.2a, and TS 4.5.2.2b refer to this test and are proposed for
revision to reflect the proposed change to TS 4.5.1.1b.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed license amendment does not add, delete or modify
plant equipment. The proposed changes are administrative in nature.
The proposed amendment would relocate the list of pumps, fans and
valves in Technical Specification (TS) 4.5.1.lb, Sequence and Power
Transfer Test, to the TMI-1 Updated Final Safety Analysis Report
(UFSAR) Section 8.2, Table 8.2-11, Engineered Safeguards Loading
Sequence. In addition, TS 4.5.1.1b and TS 4.5.1.2b are being
modified to include a high level description of equipment required
to be included in the Sequence and Power Transfer Test, and the
Sequence Test, respectively.
The proposed changes relocate surveillance requirement details
that are not required by 10 CFR 50.36. The proposed changes do not
change current surveillance requirements. The subject list of pumps,
fans and valves that will be relocated to UFSAR Section 8.2, Table
8.2-11, will be controlled under 10 CFR 50.59.
The probability of an accident is not increased by these
proposed changes because neither the Sequence and Power Transfer
Test nor the Sequence Test are initiators of any design basis event.
Additionally, the proposed changes do not involve any physical
changes to plant structures, systems, or components (SSCs), or the
manner in which these SSCs are operated, maintained, or controlled.
The consequences of an accident will not be increased because the
proposed administrative changes to the Sequence and Power Transfer
Test, and the Sequence Test, will continue to provide a high degree
of assurance that the Electric Power System will meet its safety
related function.
Therefore, the proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any previously evaluated?
Response: No.
The proposed changes do not alter the physical design, safety
limits, safety analyses assumptions, or the manner in which the
plant is operated or tested. The proposed changes are administrative
in nature and the surveillance requirements remain the same.
Accordingly, the proposed changes do not introduce any new accident
initiators, nor do they reduce or adversely affect the capabilities
of any plant SSC in the performance of their safety function.
Therefore, the proposed changes do not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The margin of safety is associated with the confidence in the
ability of the fission product barriers (i.e., fuel cladding,
reactor coolant pressure boundary, and containment structure) to
limit the level of radiation to the public. There are no physical
changes to SSCs or operating and testing procedures associated with
the proposed amendment.
The proposed changes do not impact the assumptions of any design
basis accident, and do not alter assumptions relative to the
mitigation of an accident or transient event. The proposed changes
are administrative in nature and the surveillance requirements
remain the same.
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: J. Bradley Fewell, Esquire, Associate
General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road,
Warrenville, IL 60555.
NRC Branch Chief: Harold K. Chernoff.
PSEG Nuclear LLC, Docket No. 50-354, Hope Creek Generating Station,
Salem County, New Jersey
Date of amendment request: February 28, 2011.
Description of amendment request: The proposed amendment would
modify the Hope Creek Generating Station (HCGS) Technical
Specifications (TSs) to revise the existing TS for the Control Room
Emergency Filtration (CREF) system and to add a new TS for the Control
Room Air Conditioning (AC) system. The proposed amendment is based, in
part, on Nuclear Regulatory Commission (NRC)-approved Technical
Specification Task Force (TSTF) Standard TS (STS) Change Traveler TSTF-
477, Revision 3, ``Adding an Action Statement for Two Inoperable
Control Room Air Conditioning Subsystems.'' Plant-specific deviations
from TSTF-477 are proposed to accommodate differences between the HCGS
TSs and the STSs originally used to develop TSTF-477.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes add a separate Technical Specification (TS)
for the Control Room Air Conditioning (AC) system, and renumbers and
revises the existing TS for the Control Room Emergency Filtration
(CREF) system. Consistent with Technical Specification Task Force
(TSTF) Standard TS Change Traveler TSTF-477, the proposed change
also adds an action statement for two inoperable Control Room AC
subsystems.
The proposed change does not involve a physical alteration of
the plant (no new or different type of equipment will be installed).
The proposed changes add a separate TS for the Control Room AC
system and an action statement for two inoperable control room
subsystems. The equipment qualification temperature of the control
room equipment is not affected. Future changes to the Bases or
licensee-controlled document[s] will be evaluated pursuant to the
requirements of 10 CFR 50.59, ``Changes, test and experiments,'' to
ensure that such changes do not result in more than a minimal
increase in the probability or consequences of an accident
previously evaluated.
The proposed changes do not adversely affect accident initiators
or precursors nor alter the design assumptions, conditions, and
configuration of the facility or the manner in which the plant is
operated and maintained. The proposed changes do not adversely
affect the ability of structures, systems and components (SSCs) to
perform their intended safety function to mitigate the consequences
of an initiating event within the assumed acceptance limits. The
proposed changes do not affect the source term, containment
isolation, or radiological consequences of any accident previously
evaluated. Further, the proposed changes do not increase the types
and the amounts of radioactive effluent that may be released, nor
significantly increase individual or cumulative occupation/public
radiation exposures.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed changes add a separate TS for the Control Room AC
system and an
[[Page 24930]]
action statement for two inoperable control room subsystems. The
changes do not involve a physical altering of the plant (i.e., no
new or different type of equipment will be installed) or a change in
methods governing normal plant control room temperature within the
design limits.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed changes add a separate TS for the Control Room AC
system and an action statement for two inoperable control room
subsystems. Instituting the proposed changes will continue to
maintain the control room temperature within design limits. Changes
to the Bases or license[e-]controlled document[s] are performed in
accordance with 10 CFR 50.59. This approach provides an effective
level of regulatory control and ensures that the control room
temperature will be maintained within design limits.
The proposed changes maintain sufficient controls to preserve
the current margins of safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Jeffrie J. Keenan, PSEG Nuclear LLC--N21,
P.O. Box 236, Hancocks Bridge, NJ 08038.
NRC Branch Chief: Harold K. Chernoff.
Tennessee Valley Authority, Docket Nos. 50-260 and 50-296, Browns Ferry
Nuclear Plant (BFN), Units 2 and 3, Limestone County, Alabama
Date of amendment request: February 25, 2011.
Description of amendment request: The proposed amendments would
delete Technical Specification (TS) Surveillance Requirement 3.5.1.12,
which requires the verification of the capability to automatically
transfer the power supply from the normal source to the alternate
source for each Low Pressure Coolant Injection (LPCI) subsystem inboard
injection valve and each recirculation pump discharge valve on a 24-
month frequency.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed Technical Specification change involve a
significant increase in the probability or consequences of an
accident previously evaluated?
Response: No.
The 480V RMOV Boards D or E, the equipment they power, or the
automatic power transfer feature provided for these boards are not
precursors to any accident previous evaluated in the Updated Final
Safety Analysis Report (UFSAR). Therefore, the probability of an
evaluated accident is not increased by modifying this equipment. The
proposed deletion of the requirement to maintain the automatic
transfer capability for the power supply to the LPCI inboard
injection valves, RHR [residual heat removal] minimum flow valves
and recirculation pump discharge valves does not change the number
of Emergency Core Cooling System (ECCS) subsystems credited in the
BFN licensing basis. The proposed change does not affect the
operational characteristics or function of systems, structures, or
components (SSCs), the interfaces between credited SSCs and other
plant systems, or the reliability of SSCs. The proposed change does
not impact the capability of credited SSCs to perform their required
safety functions.
Therefore, the proposed TS changes will not significantly
increase the consequences of an accident previously evaluated.
2. Does the proposed Technical Specification change create the
possibility of a new or different kind of accident from any accident
previously evaluated?
Response: No.
The proposed deletion of the requirement to maintain an
automatic transfer capability for the power supply to the LPCI
inboard injection valves, RHR minimum flow valves and recirculation
pump discharge valves does not introduce new equipment, which could
create a new or different kind of accident.
The proposed change does not alter the manner in which equipment
operation is initiated, nor will the functional demands on credited
equipment be changed. The capability of credited SSCs to perform
their required function will not be affected by the proposed change.
In addition, the proposed change does not affect the interaction of
plant SSCs with other plant SSCs whose failure or malfunction can
initiate an accident or transient. As such, no new failure modes are
being introduced. No new external threats, release pathways, or
equipment failure modes are created. Therefore, the proposed
deletion of the requirement to maintain an automatic transfer
capability for the power supply to the LPCI inboard injection
valves, RHR minimum flow valves and recirculation pump discharge
valves will not create a possibility for an accident of a new or
different type than those previously evaluated.
3. Does the proposed Technical Specification change involve a
significant reduction in a margin of safety?
Response: No.
The proposed deletion of the requirement to maintain an
automatic transfer capability for the power supply to the LPCI
inboard injection valves, RHR minimum flow valves and recirculation
pump discharge valves does not change the conditions, operating
configurations, or minimum amount of operating equipment credited in
the safety analyses for accident or transient mitigation. The
proposed change does not alter the assumptions contained in the
safety analyses. The proposed change does not alter the manner in
which safety limits, limiting safety system settings or limiting
conditions for operation are determined. The proposed change does
not impact the safety analysis credited redundancy or availability
of SSCs required for accident or transient mitigation, or the
ability of the plant to cope with design basis events as assumed in
safety analyses. In addition, no changes are proposed in the manner
in which the credited SSCs provide plant protection or which create
new modes of plant operation. The requirements of 10 CFR 50.46 and
Appendix K continue to be met. Therefore, the proposed change does
not involve a significant reduction in the margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: General Counsel, Tennessee Valley Authority,
400 West Summit Hill Drive, 6A West Tower, Knoxville, Tennessee 37902.
NRC Branch Chief: Douglas A. Broaddus.
Notice of Issuance of Amendments to Facility Operating Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR Chapter I, which are set
forth in the license amendment.
Notice of Consideration of Issuance of Amendment to Facility
Operating License, Proposed No Significant Hazards Consideration
Determination, and Opportunity for A Hearing in connection with these
actions was published in the Federal Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental
[[Page 24931]]
assessment need be prepared for these amendments. If the Commission has
prepared an environmental assessment under the special circumstances
provision in 10 CFR 51.22(b) and has made a determination based on that
assessment, it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment as
indicated. All of these items are available for public inspection at
the Commission's Public Document Room (PDR), located at One White Flint
North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. Publicly available records will be accessible from the
Agencywide Documents Access and Management System (ADAMS) Public NRC
Library on the internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there
are problems in accessing the documents located in ADAMS, contact the
PDR Reference staff at 1-800-397-4209, 301-415-4737 or by email to
pdr.resource@nrc.gov.
Carolina Power and Light Company, Docket Nos. 50-325 and 50-324,
Brunswick Steam Electric Plant, Units 1 and 2, Brunswick County, North
Carolina
Date of application for amendments: April 29, 2010, as supplemented
by letters dated June 9, July 22, July 29, September 29, October 12,
November 9, November 18, and December 16, 2010; March 16, and April 6,
2011.
Brief description of amendments: The proposed license amendments
revised the Brunswick Steam Electric Plant (BSEP), Units 1 and 2,
Technical Specification 5.6.5.b by adding AREVA topical report, BAW-
10247PA, ``Realistic Thermal-Mechanical Fuel Rod Methodology for
Boiling Water Reactors,'' Revision 0, April 2008, to the list of
analytical methods that have been reviewed and approved by the NRC for
determining core operating limits. The proposed amendments changed the
BSEP Technical Specifications to support transition to ATRIUM 10XM fuel
and associated core design methodologies.
Date of issuance: April 8, 2011.
Effective date: Date of issuance, to be implemented prior to
startup from the 2011 refueling outage (RFO) for Unit 2, and prior to
startup from the 2012 RFO for Unit 1.
Amendment Nos.: Unit 1--256 and Unit 2--284.
Renewed Facility Operating License Nos. DPR-71 and DPR-62:
Amendments revised the Technical Specifications.
Date of initial notice in Federal Register: August 10, 2010 (75 FR
48373). The supplemental letters dated June 9, July 29, September 29,
October 12, November 9, November 18, and December 16, 2010; March 16
and April 6, 2011, provided additional information that clarified the
application, did not expand the scope of the application as originally
noticed, and did not change the staff's original proposed no
significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 8, 2011.
No significant hazards consideration comments received: No.
Carolina Power and Light Company, Docket Nos. 50-325 and 50-324,
Brunswick Steam Electric Plant, Units 1 and 2, Brunswick County, North
Carolina
Date of application for amendments: April 29, 2010, as supplemented
by letters dated June 9, July 22, July 29, September 29, October 12,
November 9, November 18, and December 16, 2010, and April 6, 2011.
Brief description of amendments: The proposed license amendments
revised the Brunswick Steam Electric Plant (BSEP), Units 1 and 2,
Technical Specification (TS) 5.6.5.b by adding the AREVA, topical
report, ANP-10298PA, ``ACE/ATRIUM 10XM Critical Power Correlation,''
Revision 0, March 2010, to the list of analytical methods that have
been reviewed and approved by the NRC for determining core operating
limits. The proposed amendments changed the BSEP Units 1 and 2 TSs to
support transition to ATRIUM 10XM fuel and associated core design
methodologies.
Date of issuance: April 8, 2011.
Effective date: Upon date of issuance and implemented prior to
startup from the 2011 refueling outage (RFO) for Unit 2 and prior to
start-up from the 2012 RFO for Unit 1.
Amendment Nos.: Unit 1--257 and Unit 2--285.
Renewed Facility Operating License Nos. DPR-71 and DPR-62:
Amendments revised the TSs.
Date of initial notice in Federal Register: August 10, 2010 (75 FR
48372). The supplemental letters dated June 9, July 29, September 29,
October 12, November 9, November 18, and December 16, 2010, and April
6, 2011, provided additional information that clarified the
application, did not expand the scope of the application as originally
noticed, and did not change the staff's original proposed no
significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 8, 2011.
No significant hazards consideration comments received: No.
Entergy Operations, Inc., Docket No. 50-368, Arkansas Nuclear One, Unit
2, Pope County, Arkansas
Date of application for amendment: June 17, 2010, as supplemented
by letters dated January 17, 20, and 31 and March 7, 2011.
Brief description of amendment: The amendment revised Technical
Specification 6.5.16, ``Containment Leakage Rate Testing Program,'' to
allow for the extension of the 10-year frequency of the Arkansas
Nuclear One, Unit 2 Type A or Integrated Leak Rate Test to 15 years on
a permanent basis.
Date of issuance: April 7, 2011.
Effective date: As of the date of issuance and shall be implemented
within 30 days from the date of issuance.
Amendment No.: 292.
Renewed Facility Operating License No. NPF-6: Amendment revised the
Technical Specifications/license.
Date of initial notice in Federal Register: July 27, 2010 (75 FR
44024). The supplemental letters dated January 17, 20, and 31 and March
7, 2011, provided additional information that clarified the
application, did not expand the scope of the application as originally
noticed, and did not change the staff's original proposed no
significant hazards consideration determination as published in the
Federal Register.
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated April 7, 2011.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. STN 50-456 and STN 50-457,
Braidwood Station, Units 1 and 2, Will County, Illinois; Docket Nos.
STN 50-454 and STN 50-455, Byron Station, Unit Nos. 1 and 2, Ogle
County, Illinois
Date of application for amendment: December 14, 2010.
Brief description of amendment: The amendments revised Technical
Specification (TS) 5.5.9, ``Steam Generator (SG) Program,'' to exclude
portions of the tubes within the tubesheet from periodic steam
generator (SG) inspections and plugging or repair. In addition, these
amendments revise TS 5.6.9, ``Steam Generator (SG) Tube
[[Page 24932]]
Inspection Report,'' to remove reference to previous interim alternate
repair criteria and provide reporting requirements specific to the
temporary alternate criteria.
Date of issuance: April 13, 2011.
Effective date: As of the date of issuance and shall be implemented
within 30 days for Braidwood Station, Units 1 and 2, for Byron Station,
Unit Nos. 1 and 2 prior to conducting the SG inspections required by TS
5.5.9 for the Byron Station, Unit No. 2, fall 2011 refueling outage
(B2R16).
Amendment Nos.: 166 and 172.
Facility Operating License Nos. NPF-72, NPF-77, NPF-37, and NPF-66:
The amendments revised the Technical Specifications and License.
Date of initial notice in Federal Register: February 1, 2011 (76 FR
5617).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 13, 2011.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. 50-373 and 50-374, LaSalle
County Station, Units 1 and 2, LaSalle County, Illinois
Date of application for amendments: April 19, 2010, as supplemented
by letters dated October 15, 2010, and March 14, 2011.
Brief description of amendments: The amendment request proposed
changes to the technical specifications (TSs) to revise TS 3.4.11,
``RCS [reactor coolant system] Pressure and Temperature (P/T) [or P-T]
Limits,'' to incorporate revised P-T curves that are valid for up to 32
effective full power years (EFPYs) of operation.
Date of issuance: April 15, 2011.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment Nos.: 201/188.
Facility Operating License Nos. NPF-11 and NPF-18: The amendments
revised the Technical Specifications and License.
Date of initial notice in Federal Register: June 29, 2010 (75 FR
37475).
The October 15, 2010, and March 14, 2011, supplements contained
clarifying information and did not change the NRC staff's initial
proposed finding of no significant hazards consideration.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 15, 2011.
No significant hazards consideration comments received: No.
Exelon Generation Company, LLC, Docket Nos. 50-352 and 50-353, Limerick
Generating Station (LGS), Units 1 and 2, Montgomery County,
Pennsylvania
Date of application for amendment: March 25, 2010, as supplemented
by letters dated April 26, 2010, June 29, 2010, July 22, 2010, July 28,
2010 (2), August 10, 2010, August 12, 2010 (2), August 30, 2010,
December 17, 2010, and January 7, 2011.
Brief description of amendment: The changes implemented an increase
of approximately 1.65 percent in rated thermal power from the current
licensed thermal power of 3458 megawatts thermal (MWt) to 3515 MWt. The
changes are based on increased feedwater flow measurement accuracy,
which will be achieved by utilizing Cameron International (formerly
Caldon) CheckPIus Leading Edge Flow Meter ultrasonic flow measurement
instrumentation. The changes also modified certain technical
specification setpoints and channel surveillance requirements
associated with average power range monitor simulated thermal power.
Additionally, the proposed changes include a modification to the
Standby Liquid Control System, that allows operators to select two
pumps instead of three for the automatic start function on an
Anticipated Transient Without Scram signal.
Date of issuance: April 8, 2011.
Effective date: For LGS Unit 1, as of the date of issuance and
shall be implemented within 90 days of issuance. For LGS Unit 2, as of
the date of issuance and shall be implemented within 90 days of the
completion of refueling outage Li2R11.
Amendment Nos.: 201 and 163.
Facility Operating License Nos. NPF-39 and NPF-85. These amendments
revised the license and the technical specifications.
Date of initial notice in Federal Register: June 8, 2010 (75 FR
32512). The supplements dated April 26, 2010, June 29, 2010, July 22,
2010, July 28, 2010 (2), August 10, 2010, August 12, 2010 (2), August
30, 2010, December 17, 2010, and January 7, 2011, provided additional
information that clarified the application, did not expand the scope of
the application as originally noticed and did not change the NRC
staff's original proposed no significant hazards determination.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 8, 2011.
No significant hazards consideration comments received: No.
FirstEnergy Nuclear Operating Company, et al., Docket No. 50-440, Perry
Nuclear Power Plant, Unit 1, Lake County, Ohio
Date of application for amendment: October 21, 2010, as
supplemented by letters dated February 2, 2011, and March 17, 2011.
Brief description of amendment: This license amendment modified
Technical Specification 2.1.1, ``Reactor Core SLs,'' by incorporating
revised safety limit minimum critical power ratio values resulting from
a plant-specific analysis performed for PNPP Cycle 14 core.
Date of issuance: April 18, 2011.
Effective date: As of the date of issuance and shall be implemented
within 60 days.
Amendment No.: 155.
Facility Operating License No. NPF-58: This amendment revised the
Technical Specifications and License.
Date of initial notice in Federal Register: January 11, 2011 (76 FR
1649).
The February 2, 2011 and March 17, 2011 supplements contained
clarifying information and did not change the NRC staff's initial
proposed finding of significant hazards consideration published in the
Federal Register (76 FR 1649, January 11, 2011).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated April 18, 2011.
No significant hazards consideration comments received: No.
NextEra Energy, Point Beach, LLC, Docket Nos. 50-266 and 50-301, Point
Beach Nuclear Plant, Units 1 and 2, Town of Two Creeks, Manitowoc
County, Wisconsin
Date of application for amendments: December 8, 2008, as
supplemented by letters dated January 16, January 27, February 20,
April 17 (two letters), May 8, May 15, June 1, July 24, August 20,
September 4 (two letters), September 10, October 2, November 20,
November 25, and December 17 of 2009; January 14, February 4 (two
letters), March 5, April 20, July 8, July 29, August 12, September 3,
October 12, and November 16 of 2010; January 27 and February 10 of
2011.
Brief description of amendments: The amendments modified the
requirements of TS 3.4.16, ``RCS [reactor coolant system] Specific
Activity,'' and TS 3.7.13, ``Secondary Specific Activity,'' as related
to the use of an alternate source term (AST) associated with accident
offsite and control room dose consequences. Implementation of the AST
supports adoption of the control room envelope habitability controls in
accordance with NRC-approved TS Task
[[Page 24933]]
Force (TSTF) Standard Technical Specification change traveler TSTF-448,
Revision 3, ``Control Room Habitability.'' To support this change, the
amendment modified the following: 1) TS 1.1, ``Definitions''; 2) TS
3.7.9, ``Control Room Emergency Filtration System (CREFS),'' Limiting
Condition for Operation 3.7.9, including Surveillance Requirements
3.7.9.2, 3.7.9.3, and 3.7.9.6; 3) TS 5.5.15, ``Containment Leakage Rate
Testing Program''; 4) the addition of TS 5.5.18, ``Control Room
Envelope Habitability.'' Finally, TS 5.6.4, ``Core Operating Limits
Report (COLR),'' will incorporate the addition of the NRC-approved
analytical methodology as described in WCAP-16259-P-A, ``Westinghouse
Methodology for Application of 3-D Transient Neutronics to Non-LOCA
Analyses.''
Date of issuance: April 14, 2011.
Effective date: As of the date of issuance and shall be implemented
within 180 days.
Amendment Nos.: 240, 244.
Renewed Facility Operating License Nos. DPR-24 and DPR-27:
Amendments revised the License, Appendix C, and the Technical
Specifications.
Date of initial notice in Federal Register: October 12, 2010 (75 FR
62602).
The supplemental letters contained clarifying information and did
not change the staff's initial proposed finding of no significant
hazards consideration.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 14, 2011.
No significant hazards consideration comments received: No.
Virginia Electric and Power Company, Docket No. 52-008, North Anna
Early Site Permit (ESP) Site, Louisa County, Virginia
Date of amendment request: September 2, 2010.
Description of amendment request: The amendment revised the North
Anna Early Site Permit by deleting condition 3.G, which prescribes the
notification and certification requirements associated with beginning
the site preparation and preliminary construction activities approved
by ESP-003.
Date of issuance: April 13, 2011.
Effective date: As of the date of issuance and shall be implemented
within 60 days from the date of issuance.
Amendment No.: Two.
Early Site Permit No. ESP-003: Amendment revised the North Anna
site ESP.
Public comments requested as to proposed no significant hazards
consideration (NSHC): Yes.
Date of initial notice in the Federal Register (FR): November 30,
2010 (75 FR 74105). The November 30, 2010 FR notice provided an
opportunity to submit comments on the Commission's proposed NSHC
determination. No comments have been received.
The Commission's related evaluation of the requested approval of
the amendment, and state consultation, are contained in a safety
evaluation dated April 13, 2011. The NRC staff determined that the
amendment satisfied the categorical exclusion criterion of 10 CFR
51.22(c) and no environmental assessment was required.
Attorney for the licensee: Lillian M. Cuoco, Senior Counsel,
Dominion Resources Services, Inc., 120 Tredegar Street, RS-2, Richmond,
VA 23219.
NRC Branch Chief: Hossein Hamzehee.
Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339,
North Anna Power Station, Units 1 and 2, Louisa County, Virginia
Date of application for amendment: May 6, 2010.
Brief description of amendment: These amendments revised TS 4.2.1,
``Fuel Assemblies,'' to add Optimized ZIRLOTM as an
acceptable fuel rod cladding material. In addition, the amendments
revised TS 5.6.5.b to add the Westinghouse topical report for Optimized
ZIRLOTM to the list of analytical methods used to determine
the core operating limits.
Date of issuance: April 14, 2011.
Effective date: As of the date of issuance and shall be implemented
within 60 days from the date of issuance.
Amendment Nos.: 263 and 244.
Renewed Facility Operating License Nos. NPF-4 and NPF-7: Amendments
changed the licenses and the technical specifications.
Date of initial notice in Federal Register: August 27, 2010 (75 FR
52781).
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated April 14, 2011.
No significant hazards consideration comments received: No.
Wolf Creek Nuclear Operating Corporation, Docket No. 50-482, Wolf Creek
Generating Station, Coffey County, Kansas
Date of amendment request: October 21, 2010.
Brief description of amendment: The amendment corrected a
typographical error in Technical Specification (TS) 5.0,
``ADMINISTRATIVE CONTROLS.'' The current TSs, on page 5.0-31, has two
paragraphs numbered as 5.7.2.d.3. The amendment renumbered the second
paragraph as 5.7.2.d.4.
Date of issuance: April 19, 2011.
Effective date: As the date of issuance and shall be implemented
within 90 days of the date of issuance.
Amendment No.: 196.
Renewed Facility Operating License No. NPF-42. The amendment
revised the Operating License and Technical Specifications.
Date of initial notice in Federal Register: December 14, 2010 (75
FR 77917).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated April 19, 2011.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 21st day of April 2011.
For the Nuclear Regulatory Commission.
Robert A. Nelson,
Deputy Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. 2011-10405 Filed 5-2-11; 8:45 am]
BILLING CODE 7590-01-P