Pacific Gas and Electric Company, 24465-24466 [2011-10537]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES6
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under https://www.ferc.gov/docsfiling/efiling.asp. The Commission
strongly encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, it must
also serve a copy of the document on
that resource agency.
l. Description of Project: The
Frostburg Low Head Project would
consist of: (1) A proposed powerhouse
containing one proposed generating unit
with an installed capacity of 75
kilowatts; and (2) appurtenant facilities.
The applicant estimates the project
would have an average annual
generation of 240 megawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14059,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit a competing development
application. A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) Bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION’’, ‘‘COMPETING
APPLICATION’’, ‘‘COMMENTS’’,
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
24465
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10538 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2310–193]
Pacific Gas and Electric Company
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for Submission
of Final Amendments.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2310–193.
c. Date Filed: April 12, 2011.
d. Applicant: Pacific Gas and Electric
Company.
e. Name of Project: Drum-Spaulding
Project.
f. Location: The west slope of the
Sierra Nevada on the South Yuba River,
Bear River, North Fork of the North Fork
American River, and tributaries in the
Sacramento River watershed in Nevada
and Placer counties, California. A large
portion of the project is located on the
Tahoe National Forest. Portions of the
project occupy lands managed by the
Bureau of Land Management and the
Bureau of Reclamation.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steve Peirano,
Relicensing Project Manager, Pacific Gas
and Electric Company, P.O. Box 770000,
San Francisco, CA 94177–0001, (415)
973–4481, or e-mail slp2@pge.com.
i. FERC Contact: Alan Mitchnick,
(202) 502–6074 or
alan.mitchnick@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The project
consists of 10 developments: Spaulding
No. 3; Spaulding No. 1 and No. 2; Drum
No. 1 and No. 2; Dutch Flat No. 1;
Halsey; Wise; Newcastle; Deer Creek;
Alta; and Wise No. 2. In the 10
developments, there are 29 reservoirs
with a combined gross storage capacity
of 154,388 acre-feet of water; 6 major
water conduits; 12 powerhouses with a
combined authorized installed capacity
of 192.5 megawatts; 7 transmission
lines; and appurtenant facilities and
structures, including recreation
facilities.
E:\FR\FM\02MYN1.SGM
02MYN1
24466
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-
mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...................................................
Commission issues Draft EIS ................................................................................................................................................
Comments on Draft EIS .........................................................................................................................................................
Modified Terms and Conditions .............................................................................................................................................
Commission Issues Final EIS ................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10537 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2266–102]
Nevada Irrigation District; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2266–102.
c. Date Filed: April 15, 2011.
d. Applicant: Nevada Irrigation
District.
e. Name of Project: Yuba-Bear Project.
f. Location: The Yuba-Bear Project is
located on the west slope of the Sierra
Nevada on the Middle Yuba River,
Canyon Creek, Fall Creek, Rucker Creek,
and Bear River, in Nevada, Placer and
Sierra Counties, California. A large
portion of the project is located on the
Tahoe National Forest. Some of the
project is located on federally-owned
land managed by the Bureau of Land
Management as part of the Sierra
Resource Management Area.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ron Nelson,
General Manager, Nevada Irrigation
District, 1036 West Main Street, Grass
Valley, CA 95945, (530) 271–6824 or email nelson@nid.dst.ca.us.
i. FERC Contact: Alan Mitchnick,
(202) 502–6074 or
alan.mitchnick@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The project
consists of four developments—
Bowman, Dutch Flat, Chicago Park, and
Rollins—which, in total, include: 13
main dams with a combined gross
storage capacity of 207,865 acre-feet of
water; four water conduits; five
June 2011.
August 2011.
February 2012.
March 2012.
May 2012.
September 2012.
diversion dams; four powerhouses with
a combined installed capacity of 79.32
megawatts; one 9.0-mile-long, 60kilovolt transmission line; and
appurtenant facilities and structures,
including recreation facilities.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
mstockstill on DSKH9S0YB1PROD with NOTICES6
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .........................................................
Commission issues Draft EIS ......................................................................................................................................................
Comments on Draft EIS ...............................................................................................................................................................
Modified Terms and Conditions ...................................................................................................................................................
Commission Issues Final EIS ......................................................................................................................................................
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
E:\FR\FM\02MYN1.SGM
02MYN1
June 2011.
August 2011.
February 2012.
March 2012.
May 2012.
September 2012.
Agencies
[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Notices]
[Pages 24465-24466]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10537]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2310-193]
Pacific Gas and Electric Company
Notice of Application Tendered for Filing With the Commission and
Establishing Procedural Schedule for Licensing and Deadline for
Submission of Final Amendments.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2310-193.
c. Date Filed: April 12, 2011.
d. Applicant: Pacific Gas and Electric Company.
e. Name of Project: Drum-Spaulding Project.
f. Location: The west slope of the Sierra Nevada on the South Yuba
River, Bear River, North Fork of the North Fork American River, and
tributaries in the Sacramento River watershed in Nevada and Placer
counties, California. A large portion of the project is located on the
Tahoe National Forest. Portions of the project occupy lands managed by
the Bureau of Land Management and the Bureau of Reclamation.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Steve Peirano, Relicensing Project Manager,
Pacific Gas and Electric Company, P.O. Box 770000, San Francisco, CA
94177-0001, (415) 973-4481, or e-mail slp2@pge.com.
i. FERC Contact: Alan Mitchnick, (202) 502-6074 or
alan.mitchnick@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The project consists of 10 developments:
Spaulding No. 3; Spaulding No. 1 and No. 2; Drum No. 1 and No. 2; Dutch
Flat No. 1; Halsey; Wise; Newcastle; Deer Creek; Alta; and Wise No. 2.
In the 10 developments, there are 29 reservoirs with a combined gross
storage capacity of 154,388 acre-feet of water; 6 major water conduits;
12 powerhouses with a combined authorized installed capacity of 192.5
megawatts; 7 transmission lines; and appurtenant facilities and
structures, including recreation facilities.
[[Page 24466]]
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of June 2011.
Ready for Environmental Analysis.
Filing of recommendations, August 2011.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues Draft EIS........ February 2012.
Comments on Draft EIS.............. March 2012.
Modified Terms and Conditions...... May 2012.
Commission Issues Final EIS........ September 2012.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.