Nevada Irrigation District; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 24466-24467 [2011-10536]
Download as PDF
24466
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-
mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...................................................
Commission issues Draft EIS ................................................................................................................................................
Comments on Draft EIS .........................................................................................................................................................
Modified Terms and Conditions .............................................................................................................................................
Commission Issues Final EIS ................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10537 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2266–102]
Nevada Irrigation District; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2266–102.
c. Date Filed: April 15, 2011.
d. Applicant: Nevada Irrigation
District.
e. Name of Project: Yuba-Bear Project.
f. Location: The Yuba-Bear Project is
located on the west slope of the Sierra
Nevada on the Middle Yuba River,
Canyon Creek, Fall Creek, Rucker Creek,
and Bear River, in Nevada, Placer and
Sierra Counties, California. A large
portion of the project is located on the
Tahoe National Forest. Some of the
project is located on federally-owned
land managed by the Bureau of Land
Management as part of the Sierra
Resource Management Area.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ron Nelson,
General Manager, Nevada Irrigation
District, 1036 West Main Street, Grass
Valley, CA 95945, (530) 271–6824 or email nelson@nid.dst.ca.us.
i. FERC Contact: Alan Mitchnick,
(202) 502–6074 or
alan.mitchnick@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The project
consists of four developments—
Bowman, Dutch Flat, Chicago Park, and
Rollins—which, in total, include: 13
main dams with a combined gross
storage capacity of 207,865 acre-feet of
water; four water conduits; five
June 2011.
August 2011.
February 2012.
March 2012.
May 2012.
September 2012.
diversion dams; four powerhouses with
a combined installed capacity of 79.32
megawatts; one 9.0-mile-long, 60kilovolt transmission line; and
appurtenant facilities and structures,
including recreation facilities.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
mstockstill on DSKH9S0YB1PROD with NOTICES6
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .........................................................
Commission issues Draft EIS ......................................................................................................................................................
Comments on Draft EIS ...............................................................................................................................................................
Modified Terms and Conditions ...................................................................................................................................................
Commission Issues Final EIS ......................................................................................................................................................
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
E:\FR\FM\02MYN1.SGM
02MYN1
June 2011.
August 2011.
February 2012.
March 2012.
May 2012.
September 2012.
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10536 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1992–003]
mstockstill on DSKH9S0YB1PROD with NOTICES6
Fire Mountain Lodge; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Existing Minor
License.
b. Project No.: 1992–003.
c. Date filed: April 25, 2008.
d. Applicant: Mr. Ken Willis.
e. Name of Project: Fire Mountain
Lodge.
f. Location: On Fern Spring in
Tehama County, California. The project
is located primarily on privately owned
land except for 1.07 acres of the dam
and reservoir which is located on U.S.
Forest Service land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Ken Willis, Fire
Mountain Lodge, 43500 Highway 36,
Mill Creek, CA 96060, (530) 258–1952.
i. FERC Contact: Matt Buhyoff, (202)
502–6824 or matt.buhyoff@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Fire Mountain Lodge
project consists of: (1) A 265-foot-long
earth and concrete filled dam; (2) a 0.24acre reservoir; (3) a 38 inch intake
tower; (4) a 1540-foot-long penstock; (5)
a powerhouse with an installed capacity
of 60-kilowatts; a (6) a 4000 foot-long
transmission line and; (7) appurtenant
facilities. The power generated by the
project is utilized for commercial and
residential purposes, solely for the
owners of Fire Mountain Lodge, a selfprovider of electricity.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
24467
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: April 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10508 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–74–000.
Applicants: Macho Springs Power I,
LLC, Element Power US, LLC.
Description: Application of Macho
Springs Power I, LLC, et al. for
Authorization of Disposition of
Jursidictional Facilities and Requests for
Confidential Treatment and Expedited
Consideration.
Filed Date: 04/25/2011.
Accession Number: 20110425–5248.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Docket Numbers: EC11–75–000.
Applicants: Arroyo DP Holding LP,
Delta Power Company, LLC, Vineland
Energy, LLC, RC Delta Holdings, LLC.
Description: Joint Application of
Arroyo DP Holding LP, Delta Power
Company, LLC Vineland Energy, LLC
and RC Delta Holdings LLC for
Authorization for Indirect Disposition of
Jurisdictional Facilities and Request for
Expedited Treatment.
Filed Date: 04/25/2011.
Accession Number: 20110425–5254.
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Notices]
[Pages 24466-24467]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10536]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2266-102]
Nevada Irrigation District; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2266-102.
c. Date Filed: April 15, 2011.
d. Applicant: Nevada Irrigation District.
e. Name of Project: Yuba-Bear Project.
f. Location: The Yuba-Bear Project is located on the west slope of
the Sierra Nevada on the Middle Yuba River, Canyon Creek, Fall Creek,
Rucker Creek, and Bear River, in Nevada, Placer and Sierra Counties,
California. A large portion of the project is located on the Tahoe
National Forest. Some of the project is located on federally-owned land
managed by the Bureau of Land Management as part of the Sierra Resource
Management Area.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ron Nelson, General Manager, Nevada
Irrigation District, 1036 West Main Street, Grass Valley, CA 95945,
(530) 271-6824 or e-mail nelson@nid.dst.ca.us.
i. FERC Contact: Alan Mitchnick, (202) 502-6074 or
alan.mitchnick@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The project consists of four developments--
Bowman, Dutch Flat, Chicago Park, and Rollins--which, in total,
include: 13 main dams with a combined gross storage capacity of 207,865
acre-feet of water; four water conduits; five diversion dams; four
powerhouses with a combined installed capacity of 79.32 megawatts; one
9.0-mile-long, 60-kilovolt transmission line; and appurtenant
facilities and structures, including recreation facilities.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready June 2011.
for Environmental Analysis.
Filing of recommendations, preliminary August 2011.
terms and conditions, and fishway
prescriptions.
Commission issues Draft EIS........... February 2012.
Comments on Draft EIS................. March 2012.
Modified Terms and Conditions......... May 2012.
Commission Issues Final EIS........... September 2012.
------------------------------------------------------------------------
[[Page 24467]]
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10536 Filed 4-29-11; 8:45 am]