Combined Notice of Filings #1, 24470-24471 [2011-10518]
Download as PDF
24470
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Dated: April 26, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–10524 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSKH9S0YB1PROD with NOTICES6
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG11–76–000.
Applicants: Howard Wind LLC.
Description: Self-Certification of EG or
FC of Howard Wind LLC.
Filed Date: 04/20/2011.
Accession Number: 20110420–5091.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 11, 2011.
Docket Numbers: EG11–77–000.
Applicants: Highland North LLC.
Description: Self-Certification of
Highland North LLC.
Filed Date: 04/20/2011.
Accession Number: 20110420–5121.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 11, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–1994–001.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc.
submits tariff filing per 35: Compliance
Filing, City of Wamego, KS, Rate
Schedule WTU–012011 to be effective
1/1/2011.
Filed Date: 04/22/2011.
Accession Number: 20110422–5111.
Comment Date: 5:00 pm Eastern Time
on Friday, May 13, 2011.
Docket Numbers: ER11–3420–000.
Applicants: Gridway Energy Corp.
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
Description: Gridway Energy Corp.
submits tariff filing per 35.12:
Application for Market Based Rate
Authorization to be effective 4/26/2011.
Filed Date: 04/25/2011.
Accession Number: 20110425–5017.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Docket Numbers: ER11–3421–000.
Applicants: Midwest Independent
Transmission System, MidAmerican
Energy Company.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
MidAmericanCornbeltAuburn to be
effective 6/1/2011.
Filed Date: 04/25/2011.
Accession Number: 20110425–5018.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Docket Numbers: ER11–3422–000.
Applicants: Midwest Independent
Transmission System, MidAmerican
Energy Company.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
MidAmericanCornbeltHudson to be
effective 6/1/2011.
Filed Date: 04/25/2011.
Accession Number: 20110425–5019.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Docket Numbers: ER11–3423–000.
Applicants: Fowler Ridge II Wind
Farm LLC.
Description: Fowler Ridge II Wind
Farm LLC submits tariff filing per
35.13(a)(2)(iii: Compliance Filing,
Docket No. ER09–1650–001 and OA09–
32–001 to be effective 12/31/9998.
Filed Date: 04/25/2011.
Accession Number: 20110425–5045.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA11–1–000.
Applicants: Southern Company
Services, Inc., Alabama Power
Company, Georgia Power Company,
Gulf Power Company, Mississippi
Power Company, Southern Power
Company.
Description: Land Acquisition/Site
Control Demonstration Report of
Southern Companies.
Filed Date: 04/22/2011.
Accession Number: 20110422–5121.
Comment Date: 5 p.m. Eastern Time
on Friday, May 13, 2011.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF11–230–000.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Applicants: St. Elizabeth Medical
Center.
Description: Form 556—Notice of selfcertification of qualifying cogeneration
facility status of St. Elizabeth Medical
Center.
Filed Date: 04/20/2011.
Accession Number: 20110420–5059.
Comment Date: None Applicable.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
long by 350-foot-wide tailrace channel;
(3) a new 750-foot-long by 6-footdiameter buried steel penstock; (4) a
new 250-foot by 325-foot concrete
powerhouse containing six new turbinegenerators and associated switchgear,
controls and ancillary systems; the
turbine-generator units have individual
unit capacities of 3.0 megawatts (MW)
and a combined capacity of 18 MW;
(5) a new concrete 40-foot by 50-foot
control building constructed on the east
side of the powerhouse; (6) a 80-footlong by 60-foot-wide, 20 megavoltamperes (MVA) substation; (7) a 20,000foot-long transmission line extending
east from the substation to an
interconnection point with an existing
transmission line on the Illinois side of
the river; and (8) appurtenant facilities.
The proposed operating voltage would
Dated: April 25, 2011.
be between 115 and 161 kilovolt (kV).
Nathaniel J. Davis, Sr.,
The project would have annual energy
Deputy Secretary.
production of 90 gigawatt-hours per
[FR Doc. 2011–10518 Filed 4–29–11; 8:45 am]
year (GWh/yr), utilize Corps-designated
BILLING CODE 6717–01–P
flows from the Mississippi Lock and
Dam #11 structure, and operate as
directed by the Corps.
DEPARTMENT OF ENERGY
Applicant Contact: Mr. Ramya
Swaminathan, Free Flow Power
Federal Energy Regulatory
Corporation, 239 Causeway Street, Suite
Commission
300, Boston, MA 02114; (978) 283–2822.
Hydro Friends’ proposed Lock and
[Project Nos. 14111–000; 14112–000; 14113–
Dam #11 Hydropower Project No. 14112
000]
would consist of: (1) Two 109-foot-wide
by 40-foot-high lock frame modules—
Qualified Hydro 26, LLC; Lock+ Hydro
one installed in the inactive auxiliary
Friends Fund VII; Western Minnesota
lock itself and the other east of the
Municipal Power Agency; Notice of
movable section of the dam; each
Competing Preliminary Permit
consisting of 10 hydropower turbines
Applications Accepted for Filing and
rated at 900 kilowatts (kW) and giving
Soliciting Comments, Motions To
Intervene, and Competing Applications the project a total rated capacity of 18
MW; (2) two new 150-foot-long by 110On March 15, 2011, Qualified Hydro
foot-wide tailrace channels; (3) a new
26, LLC (Qualified Hydro), Lock+ Hydro 50-foot-long by 25-foot-wide
Friends Fund VII (Hydro Friends) and
switchyard; (4) a 2-mile-long, 115- kV
Western Minnesota Municipal Power
transmission line extending from the
Agency (WMMPA) filed preliminary
switchyard to an existing nearby
permit applications, pursuant to section transmission line; and (5) appurtenant
4(f) of the Federal Power Act, proposing facilities. The project would have an
to study the feasibility of a hydropower
average annual generation of 120 GWh/
project at the U.S. Army Corps of
yr, and utilize Corps-designated flows
Engineers’ (Corps) Mississippi River
from the Mississippi Lock and Dam #11
Lock and Dam #11 structure, located on structure.
the Mississippi River near the Township
Applicant Contact: Mr. Wayne F.
of Dubuque, Dubuque County, Iowa.
Krouse, Chairman, Hydro Green Energy,
The sole purpose of a preliminary
LLC, 5090 Richmond Avenue, #390,
permit, if issued, is to grant the permit
Houston, TX 77056; (877) 556–6566
holder priority to file a license
x709.
WMMPA’s Mississippi Lock and Dam
application during the permit term. A
#11 Project No. 1411 would consist of:
preliminary permit does not authorize
(1) A 318-foot-long by 300-foot-wide
the permit holder to perform any landintake channel; (2) a 265-foot-long by
disturbing activities or otherwise enter
300-foot-wide tailrace channel; (3) a
upon lands or waters owned by others
without the owner’s express permission. new 190-foot-long by 260-foot-wide by
40-foot-high concrete powerhouse
Qualified Hydro’s Mississippi Lock
containing six new pit type axial flow
and Dam #11 Project No. 14111 would
turbine-generators and associated
consist of: (1) A 400-foot-long by 350foot-wide intake channel; (2) a 600-foot- transformers and switchgear; the
mstockstill on DSKH9S0YB1PROD with NOTICES6
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
PO 00000
Frm 00015
Fmt 4703
Sfmt 9990
24471
turbine-generator units would have
individual unit capacities of 4.6 MW
and a combined capacity of 27.6 MW;
(4) a new 9.4-mile-long, 69 kV
transmission line extending from the
switchyard near the proposed
powerhouse to an interconnection point
with an existing substation on the
Wisconsin side of the river; and
(5) appurtenant facilities. The project
would have annual energy production
of 190 GWh/yr, utilize Corps designated
flows from the Mississippi Lock and
Dam #11 structure, and operate as
directed by the Corps.
Applicant Contact: Mr. Raymond J.
Wahle, P.E., Missouri River Energy
Services 3724 W. Avera Drive, Sioux
Falls, SD 57109; (605) 330–6963.
FERC Contact: Tyrone A. Williams,
tyrone.williams@ferc.gov (202) 502–
6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14111, P–14112, or P–14113–000) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10540 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Notices]
[Pages 24470-24471]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10518]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG11-76-000.
Applicants: Howard Wind LLC.
Description: Self-Certification of EG or FC of Howard Wind LLC.
Filed Date: 04/20/2011.
Accession Number: 20110420-5091.
Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011.
Docket Numbers: EG11-77-000.
Applicants: Highland North LLC.
Description: Self-Certification of Highland North LLC.
Filed Date: 04/20/2011.
Accession Number: 20110420-5121.
Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-1994-001.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc. submits tariff filing per 35:
Compliance Filing, City of Wamego, KS, Rate Schedule WTU-012011 to be
effective 1/1/2011.
Filed Date: 04/22/2011.
Accession Number: 20110422-5111.
Comment Date: 5:00 pm Eastern Time on Friday, May 13, 2011.
Docket Numbers: ER11-3420-000.
Applicants: Gridway Energy Corp.
Description: Gridway Energy Corp. submits tariff filing per 35.12:
Application for Market Based Rate Authorization to be effective 4/26/
2011.
Filed Date: 04/25/2011.
Accession Number: 20110425-5017.
Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.
Docket Numbers: ER11-3421-000.
Applicants: Midwest Independent Transmission System, MidAmerican
Energy Company.
Description: Midwest Independent Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltAuburn to
be effective 6/1/2011.
Filed Date: 04/25/2011.
Accession Number: 20110425-5018.
Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.
Docket Numbers: ER11-3422-000.
Applicants: Midwest Independent Transmission System, MidAmerican
Energy Company.
Description: Midwest Independent Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltHudson to
be effective 6/1/2011.
Filed Date: 04/25/2011.
Accession Number: 20110425-5019.
Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.
Docket Numbers: ER11-3423-000.
Applicants: Fowler Ridge II Wind Farm LLC.
Description: Fowler Ridge II Wind Farm LLC submits tariff filing
per 35.13(a)(2)(iii: Compliance Filing, Docket No. ER09-1650-001 and
OA09-32-001 to be effective 12/31/9998.
Filed Date: 04/25/2011.
Accession Number: 20110425-5045.
Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.
Take notice that the Commission received the following land
acquisition reports:
Docket Numbers: LA11-1-000.
Applicants: Southern Company Services, Inc., Alabama Power Company,
Georgia Power Company, Gulf Power Company, Mississippi Power Company,
Southern Power Company.
Description: Land Acquisition/Site Control Demonstration Report of
Southern Companies.
Filed Date: 04/22/2011.
Accession Number: 20110422-5121.
Comment Date: 5 p.m. Eastern Time on Friday, May 13, 2011.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF11-230-000.
Applicants: St. Elizabeth Medical Center.
Description: Form 556--Notice of self-certification of qualifying
cogeneration facility status of St. Elizabeth Medical Center.
Filed Date: 04/20/2011.
Accession Number: 20110420-5059.
Comment Date: None Applicable.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
As it relates to any qualifying facility filings, the notices of
self-certification [or self-recertification] listed above, do not
institute a proceeding regarding qualifying facility status. A notice
of self-certification [or self-recertification] simply provides
notification that the entity making the filing has determined the
facility named in the notice meets the applicable criteria to be a
qualifying facility. Intervention and/or protest do not lie in dockets
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying
facility status may do so by filing a motion pursuant to 18 CFR
292.207(d)(iii). Intervention and protests may be filed in response to
notices of qualifying facility dockets other than self-certifications
and self-recertifications.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies
[[Page 24471]]
of the intervention or protest to the Federal Energy Regulatory
Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: April 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-10518 Filed 4-29-11; 8:45 am]