Combined Notice of Filings #1, 24470-24471 [2011-10518]

Download as PDF 24470 Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 26, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–10524 Filed 4–29–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSKH9S0YB1PROD with NOTICES6 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG11–76–000. Applicants: Howard Wind LLC. Description: Self-Certification of EG or FC of Howard Wind LLC. Filed Date: 04/20/2011. Accession Number: 20110420–5091. Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011. Docket Numbers: EG11–77–000. Applicants: Highland North LLC. Description: Self-Certification of Highland North LLC. Filed Date: 04/20/2011. Accession Number: 20110420–5121. Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–1994–001. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc. submits tariff filing per 35: Compliance Filing, City of Wamego, KS, Rate Schedule WTU–012011 to be effective 1/1/2011. Filed Date: 04/22/2011. Accession Number: 20110422–5111. Comment Date: 5:00 pm Eastern Time on Friday, May 13, 2011. Docket Numbers: ER11–3420–000. Applicants: Gridway Energy Corp. VerDate Mar<15>2010 17:48 Apr 29, 2011 Jkt 223001 Description: Gridway Energy Corp. submits tariff filing per 35.12: Application for Market Based Rate Authorization to be effective 4/26/2011. Filed Date: 04/25/2011. Accession Number: 20110425–5017. Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011. Docket Numbers: ER11–3421–000. Applicants: Midwest Independent Transmission System, MidAmerican Energy Company. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltAuburn to be effective 6/1/2011. Filed Date: 04/25/2011. Accession Number: 20110425–5018. Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011. Docket Numbers: ER11–3422–000. Applicants: Midwest Independent Transmission System, MidAmerican Energy Company. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltHudson to be effective 6/1/2011. Filed Date: 04/25/2011. Accession Number: 20110425–5019. Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011. Docket Numbers: ER11–3423–000. Applicants: Fowler Ridge II Wind Farm LLC. Description: Fowler Ridge II Wind Farm LLC submits tariff filing per 35.13(a)(2)(iii: Compliance Filing, Docket No. ER09–1650–001 and OA09– 32–001 to be effective 12/31/9998. Filed Date: 04/25/2011. Accession Number: 20110425–5045. Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011. Take notice that the Commission received the following land acquisition reports: Docket Numbers: LA11–1–000. Applicants: Southern Company Services, Inc., Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company, Southern Power Company. Description: Land Acquisition/Site Control Demonstration Report of Southern Companies. Filed Date: 04/22/2011. Accession Number: 20110422–5121. Comment Date: 5 p.m. Eastern Time on Friday, May 13, 2011. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF11–230–000. PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 Applicants: St. Elizabeth Medical Center. Description: Form 556—Notice of selfcertification of qualifying cogeneration facility status of St. Elizabeth Medical Center. Filed Date: 04/20/2011. Accession Number: 20110420–5059. Comment Date: None Applicable. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies E:\FR\FM\02MYN1.SGM 02MYN1 Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices long by 350-foot-wide tailrace channel; (3) a new 750-foot-long by 6-footdiameter buried steel penstock; (4) a new 250-foot by 325-foot concrete powerhouse containing six new turbinegenerators and associated switchgear, controls and ancillary systems; the turbine-generator units have individual unit capacities of 3.0 megawatts (MW) and a combined capacity of 18 MW; (5) a new concrete 40-foot by 50-foot control building constructed on the east side of the powerhouse; (6) a 80-footlong by 60-foot-wide, 20 megavoltamperes (MVA) substation; (7) a 20,000foot-long transmission line extending east from the substation to an interconnection point with an existing transmission line on the Illinois side of the river; and (8) appurtenant facilities. The proposed operating voltage would Dated: April 25, 2011. be between 115 and 161 kilovolt (kV). Nathaniel J. Davis, Sr., The project would have annual energy Deputy Secretary. production of 90 gigawatt-hours per [FR Doc. 2011–10518 Filed 4–29–11; 8:45 am] year (GWh/yr), utilize Corps-designated BILLING CODE 6717–01–P flows from the Mississippi Lock and Dam #11 structure, and operate as directed by the Corps. DEPARTMENT OF ENERGY Applicant Contact: Mr. Ramya Swaminathan, Free Flow Power Federal Energy Regulatory Corporation, 239 Causeway Street, Suite Commission 300, Boston, MA 02114; (978) 283–2822. Hydro Friends’ proposed Lock and [Project Nos. 14111–000; 14112–000; 14113– Dam #11 Hydropower Project No. 14112 000] would consist of: (1) Two 109-foot-wide by 40-foot-high lock frame modules— Qualified Hydro 26, LLC; Lock+ Hydro one installed in the inactive auxiliary Friends Fund VII; Western Minnesota lock itself and the other east of the Municipal Power Agency; Notice of movable section of the dam; each Competing Preliminary Permit consisting of 10 hydropower turbines Applications Accepted for Filing and rated at 900 kilowatts (kW) and giving Soliciting Comments, Motions To Intervene, and Competing Applications the project a total rated capacity of 18 MW; (2) two new 150-foot-long by 110On March 15, 2011, Qualified Hydro foot-wide tailrace channels; (3) a new 26, LLC (Qualified Hydro), Lock+ Hydro 50-foot-long by 25-foot-wide Friends Fund VII (Hydro Friends) and switchyard; (4) a 2-mile-long, 115- kV Western Minnesota Municipal Power transmission line extending from the Agency (WMMPA) filed preliminary switchyard to an existing nearby permit applications, pursuant to section transmission line; and (5) appurtenant 4(f) of the Federal Power Act, proposing facilities. The project would have an to study the feasibility of a hydropower average annual generation of 120 GWh/ project at the U.S. Army Corps of yr, and utilize Corps-designated flows Engineers’ (Corps) Mississippi River from the Mississippi Lock and Dam #11 Lock and Dam #11 structure, located on structure. the Mississippi River near the Township Applicant Contact: Mr. Wayne F. of Dubuque, Dubuque County, Iowa. Krouse, Chairman, Hydro Green Energy, The sole purpose of a preliminary LLC, 5090 Richmond Avenue, #390, permit, if issued, is to grant the permit Houston, TX 77056; (877) 556–6566 holder priority to file a license x709. WMMPA’s Mississippi Lock and Dam application during the permit term. A #11 Project No. 1411 would consist of: preliminary permit does not authorize (1) A 318-foot-long by 300-foot-wide the permit holder to perform any landintake channel; (2) a 265-foot-long by disturbing activities or otherwise enter 300-foot-wide tailrace channel; (3) a upon lands or waters owned by others without the owner’s express permission. new 190-foot-long by 260-foot-wide by 40-foot-high concrete powerhouse Qualified Hydro’s Mississippi Lock containing six new pit type axial flow and Dam #11 Project No. 14111 would turbine-generators and associated consist of: (1) A 400-foot-long by 350foot-wide intake channel; (2) a 600-foot- transformers and switchgear; the mstockstill on DSKH9S0YB1PROD with NOTICES6 of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Mar<15>2010 17:48 Apr 29, 2011 Jkt 223001 PO 00000 Frm 00015 Fmt 4703 Sfmt 9990 24471 turbine-generator units would have individual unit capacities of 4.6 MW and a combined capacity of 27.6 MW; (4) a new 9.4-mile-long, 69 kV transmission line extending from the switchyard near the proposed powerhouse to an interconnection point with an existing substation on the Wisconsin side of the river; and (5) appurtenant facilities. The project would have annual energy production of 190 GWh/yr, utilize Corps designated flows from the Mississippi Lock and Dam #11 structure, and operate as directed by the Corps. Applicant Contact: Mr. Raymond J. Wahle, P.E., Missouri River Energy Services 3724 W. Avera Drive, Sioux Falls, SD 57109; (605) 330–6963. FERC Contact: Tyrone A. Williams, tyrone.williams@ferc.gov (202) 502– 6331. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14111, P–14112, or P–14113–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: April 26, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–10540 Filed 4–29–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\02MYN1.SGM 02MYN1

Agencies

[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Notices]
[Pages 24470-24471]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10518]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG11-76-000.
    Applicants: Howard Wind LLC.
    Description: Self-Certification of EG or FC of Howard Wind LLC.
    Filed Date: 04/20/2011.
    Accession Number: 20110420-5091.
    Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011.

    Docket Numbers: EG11-77-000.
    Applicants: Highland North LLC.
    Description: Self-Certification of Highland North LLC.
    Filed Date: 04/20/2011.
    Accession Number: 20110420-5121.
    Comment Date: 5 p.m. Eastern Time on Wednesday, May 11, 2011.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER11-1994-001.
    Applicants: Westar Energy, Inc.
    Description: Westar Energy, Inc. submits tariff filing per 35: 
Compliance Filing, City of Wamego, KS, Rate Schedule WTU-012011 to be 
effective 1/1/2011.
    Filed Date: 04/22/2011.
    Accession Number: 20110422-5111.
    Comment Date: 5:00 pm Eastern Time on Friday, May 13, 2011.

    Docket Numbers: ER11-3420-000.
    Applicants: Gridway Energy Corp.
    Description: Gridway Energy Corp. submits tariff filing per 35.12: 
Application for Market Based Rate Authorization to be effective 4/26/
2011.
    Filed Date: 04/25/2011.
    Accession Number: 20110425-5017.
    Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.

    Docket Numbers: ER11-3421-000.
    Applicants: Midwest Independent Transmission System, MidAmerican 
Energy Company.
    Description: Midwest Independent Transmission System Operator, Inc. 
submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltAuburn to 
be effective 6/1/2011.
    Filed Date: 04/25/2011.
    Accession Number: 20110425-5018.
    Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.

    Docket Numbers: ER11-3422-000.
    Applicants: Midwest Independent Transmission System, MidAmerican 
Energy Company.
    Description: Midwest Independent Transmission System Operator, Inc. 
submits tariff filing per 35.13(a)(2)(iii: MidAmericanCornbeltHudson to 
be effective 6/1/2011.
    Filed Date: 04/25/2011.
    Accession Number: 20110425-5019.
    Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.

    Docket Numbers: ER11-3423-000.
    Applicants: Fowler Ridge II Wind Farm LLC.
    Description: Fowler Ridge II Wind Farm LLC submits tariff filing 
per 35.13(a)(2)(iii: Compliance Filing, Docket No. ER09-1650-001 and 
OA09-32-001 to be effective 12/31/9998.
    Filed Date: 04/25/2011.
    Accession Number: 20110425-5045.
    Comment Date: 5 p.m. Eastern Time on Monday, May 16, 2011.

    Take notice that the Commission received the following land 
acquisition reports:

    Docket Numbers: LA11-1-000.
    Applicants: Southern Company Services, Inc., Alabama Power Company, 
Georgia Power Company, Gulf Power Company, Mississippi Power Company, 
Southern Power Company.
    Description: Land Acquisition/Site Control Demonstration Report of 
Southern Companies.
    Filed Date: 04/22/2011.
    Accession Number: 20110422-5121.
    Comment Date: 5 p.m. Eastern Time on Friday, May 13, 2011.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF11-230-000.
    Applicants: St. Elizabeth Medical Center.
    Description: Form 556--Notice of self-certification of qualifying 
cogeneration facility status of St. Elizabeth Medical Center.
    Filed Date: 04/20/2011.
    Accession Number: 20110420-5059.
    Comment Date: None Applicable.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    As it relates to any qualifying facility filings, the notices of 
self-certification [or self-recertification] listed above, do not 
institute a proceeding regarding qualifying facility status. A notice 
of self-certification [or self-recertification] simply provides 
notification that the entity making the filing has determined the 
facility named in the notice meets the applicable criteria to be a 
qualifying facility. Intervention and/or protest do not lie in dockets 
that are qualifying facility self-certifications or self-
recertifications. Any person seeking to challenge such qualifying 
facility status may do so by filing a motion pursuant to 18 CFR 
292.207(d)(iii). Intervention and protests may be filed in response to 
notices of qualifying facility dockets other than self-certifications 
and self-recertifications.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies

[[Page 24471]]

of the intervention or protest to the Federal Energy Regulatory 
Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: April 25, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-10518 Filed 4-29-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.