Drawbridge Operation Regulation; Mispillion River, Milford, DE, 24372 [2011-10514]
Download as PDF
24372
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Rules and Regulations
§ 207.255(a)(1)(ii) and a mortgagee
refuses to comply promptly with the
Commissioner’s request to accelerate
payment pursuant to § 207.257, an
amount equal to the difference between
the project’s market value as of the date
of the Commissioner’s request and the
project’s market value as of the date the
mortgagee makes an election to assign
the mortgage, or convey title to the
project, as determined by appraisal
procedures established by the
Commissioner.
(vii) For multifamily project
mortgages for which HUD issued a firm
commitment for mortgage insurance on
or after September 1, 2011, the
regulations of paragraph (b)(2)(vi) of this
section shall apply, unless the
mortgagor demonstrates to the
satisfaction of the Commissioner that
financial hardship to the mortgagor
would result from application of the
regulations in paragraph (b)(2)(vi) of this
section due to the reasonable
expectations of the mortgagor that the
transaction would close under the
regulations in effect prior to September
1, 2011, in which case, the regulations
of paragraph (b)(2)(vi) shall not apply.
*
*
*
*
*
Dated: April 26, 2011.
Robert C. Ryan,
Acting Assistant Secretary for HousingFederal Housing Commissioner.
[FR Doc. 2011–10450 Filed 4–29–11; 8:45 am]
BILLING CODE 4210–67–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0287]
Drawbridge Operation Regulation;
Mispillion River, Milford, DE
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, District
Fifth Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Route 1/
Rehoboth Blvd Bascule Bridge across
the Mispillion River, mile 11.0, at
Milford, DE. This deviation allows the
bridge to remain in the closed position
for two months to accommodate the
necessary bridge cleaning and painting
of the bridge.
DATES: This deviation is effective from
12 a.m. on May 13, 2011 through 11:59
p.m. on July 17, 2011.
jlentini on DSKJ8SOYB1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:25 Apr 29, 2011
Jkt 223001
Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0287 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–0287 in the ‘‘Keyword’’ box
and then clicking ‘‘Search’’. They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Lindsey Middleton, Bridge
Management Specialist, Coast Guard;
telephone 757–398–6629, e-mail
Linsey.R.Middleton@uscg.mil. If you
have questions on viewing the docket,
call Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: Marinis
Bros. Inc., (Marinis) on behalf of
Delaware Department of Transportation,
has requested a temporary deviation
from the current operating regulation of
the Route 1/Rehoboth Blvd Bascule
Bridge across the Mispillion River, mile
11.0, at Milford, DE. The vertical
clearance of this bridge is five feet at
mean high water (MHW) in the closed
position and unlimited in the open
position. During this deviation period,
the vertical clearance will be limited to
four feet at MHW due to the scaffolding
that will be used for the maintenance of
the bridge. Vessels that are able to pass
through the bridge may do so at
anytime. The bridge is able to open for
emergencies if at least five business
days are given. There are no alternate
routes available to vessels.
The current operating schedule for the
bridge is set out in 33 CFR 117.241. The
regulation requires the bridge to open
on signal if at least 24 hours notice is
given. The requested deviation is to
accommodate painting and cleaning of
the bridge. To carry out the bridge
maintenance safely and successfully,
the draw of the bridge will be
maintained in the closed-to-navigation
position from 12 a.m. on May 13, 2011
through 11:59 p.m. on July 17, 2011.
Logs from the past two years have
shown that there are minimal openings
during the period of time this deviation
will be enforced. The majority of vessel
traffic is recreational boaters. Most, if
not all, of the past openings have been
requested by one specific resident of the
area. The Coast Guard and Marinis have
been in contact with this resident and
have worked together to accommodate
ADDRESSES:
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
any necessary bridge openings during
the temporary deviation. The Coast
Guard will inform the users of the
waterway through our Local and
Broadcast Notices to Mariners so that
mariners can arrange their transits to
minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: April 18, 2011.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. 2011–10514 Filed 4–29–11; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[DE104–1102; FRL–9298–3]
Approval and Promulgation of Air
Quality Implementation Plans;
Delaware; Update to Materials
Incorporated by Reference
Environmental Protection
Agency (EPA).
ACTION: Final rule; administrative
change.
AGENCY:
EPA is updating the materials
submitted by Delaware that are
incorporated by reference (IBR) into the
state implementation plan (SIP). The
regulations affected by this update have
been previously submitted by the
Delaware Department of Natural
Resources and Environmental Control
(DNREC) and approved by EPA. This
update affects the SIP materials that are
available for public inspection at the
National Archives and Records
Administration (NARA), the Air and
Radiation Docket and Information
Center located at EPA Headquarters in
Washington, DC, and the EPA Regional
Office.
DATES: Effective Date: This action is
effective May 2, 2011.
ADDRESSES: SIP materials which are
incorporated by reference into 40 CFR
part 52 are available for inspection at
the following locations: Air Protection
Division, U.S. Environmental Protection
Agency, Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103; the
Air and Radiation Docket and
Information Center, U.S. Environmental
Protection Agency, 1301 Constitution
Avenue, NW., Room Number 3334, EPA
SUMMARY:
E:\FR\FM\02MYR1.SGM
02MYR1
Agencies
[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Rules and Regulations]
[Page 24372]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10514]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0287]
Drawbridge Operation Regulation; Mispillion River, Milford, DE
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, District Fifth Coast Guard District, has issued
a temporary deviation from the regulation governing the operation of
the Route 1/Rehoboth Blvd Bascule Bridge across the Mispillion River,
mile 11.0, at Milford, DE. This deviation allows the bridge to remain
in the closed position for two months to accommodate the necessary
bridge cleaning and painting of the bridge.
DATES: This deviation is effective from 12 a.m. on May 13, 2011 through
11:59 p.m. on July 17, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0287 and are available online
by going to https://www.regulations.gov, inserting USCG-2011-0287 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Lindsey Middleton, Bridge Management Specialist, Coast
Guard; telephone 757-398-6629, e-mail Linsey.R.Middleton@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Marinis Bros. Inc., (Marinis) on behalf of
Delaware Department of Transportation, has requested a temporary
deviation from the current operating regulation of the Route 1/Rehoboth
Blvd Bascule Bridge across the Mispillion River, mile 11.0, at Milford,
DE. The vertical clearance of this bridge is five feet at mean high
water (MHW) in the closed position and unlimited in the open position.
During this deviation period, the vertical clearance will be limited to
four feet at MHW due to the scaffolding that will be used for the
maintenance of the bridge. Vessels that are able to pass through the
bridge may do so at anytime. The bridge is able to open for emergencies
if at least five business days are given. There are no alternate routes
available to vessels.
The current operating schedule for the bridge is set out in 33 CFR
117.241. The regulation requires the bridge to open on signal if at
least 24 hours notice is given. The requested deviation is to
accommodate painting and cleaning of the bridge. To carry out the
bridge maintenance safely and successfully, the draw of the bridge will
be maintained in the closed-to-navigation position from 12 a.m. on May
13, 2011 through 11:59 p.m. on July 17, 2011.
Logs from the past two years have shown that there are minimal
openings during the period of time this deviation will be enforced. The
majority of vessel traffic is recreational boaters. Most, if not all,
of the past openings have been requested by one specific resident of
the area. The Coast Guard and Marinis have been in contact with this
resident and have worked together to accommodate any necessary bridge
openings during the temporary deviation. The Coast Guard will inform
the users of the waterway through our Local and Broadcast Notices to
Mariners so that mariners can arrange their transits to minimize any
impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 18, 2011.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth Coast Guard District.
[FR Doc. 2011-10514 Filed 4-29-11; 8:45 am]
BILLING CODE 9110-04-P