Fire Mountain Lodge; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 24467 [2011-10508]
Download as PDF
Federal Register / Vol. 76, No. 84 / Monday, May 2, 2011 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10536 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1992–003]
mstockstill on DSKH9S0YB1PROD with NOTICES6
Fire Mountain Lodge; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Existing Minor
License.
b. Project No.: 1992–003.
c. Date filed: April 25, 2008.
d. Applicant: Mr. Ken Willis.
e. Name of Project: Fire Mountain
Lodge.
f. Location: On Fern Spring in
Tehama County, California. The project
is located primarily on privately owned
land except for 1.07 acres of the dam
and reservoir which is located on U.S.
Forest Service land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Ken Willis, Fire
Mountain Lodge, 43500 Highway 36,
Mill Creek, CA 96060, (530) 258–1952.
i. FERC Contact: Matt Buhyoff, (202)
502–6824 or matt.buhyoff@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
VerDate Mar<15>2010
17:48 Apr 29, 2011
Jkt 223001
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Fire Mountain Lodge
project consists of: (1) A 265-foot-long
earth and concrete filled dam; (2) a 0.24acre reservoir; (3) a 38 inch intake
tower; (4) a 1540-foot-long penstock; (5)
a powerhouse with an installed capacity
of 60-kilowatts; a (6) a 4000 foot-long
transmission line and; (7) appurtenant
facilities. The power generated by the
project is utilized for commercial and
residential purposes, solely for the
owners of Fire Mountain Lodge, a selfprovider of electricity.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND
CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’
(2) set forth in the heading the name of
the applicant and the project number of
the application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
submitting the filing; and (4) otherwise
comply with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
24467
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: April 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–10508 Filed 4–29–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–74–000.
Applicants: Macho Springs Power I,
LLC, Element Power US, LLC.
Description: Application of Macho
Springs Power I, LLC, et al. for
Authorization of Disposition of
Jursidictional Facilities and Requests for
Confidential Treatment and Expedited
Consideration.
Filed Date: 04/25/2011.
Accession Number: 20110425–5248.
Comment Date: 5 p.m. Eastern Time
on Monday, May 16, 2011.
Docket Numbers: EC11–75–000.
Applicants: Arroyo DP Holding LP,
Delta Power Company, LLC, Vineland
Energy, LLC, RC Delta Holdings, LLC.
Description: Joint Application of
Arroyo DP Holding LP, Delta Power
Company, LLC Vineland Energy, LLC
and RC Delta Holdings LLC for
Authorization for Indirect Disposition of
Jurisdictional Facilities and Request for
Expedited Treatment.
Filed Date: 04/25/2011.
Accession Number: 20110425–5254.
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 76, Number 84 (Monday, May 2, 2011)]
[Notices]
[Page 24467]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-10508]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1992-003]
Fire Mountain Lodge; Notice of Application Accepted for Filing,
Soliciting Motions To Intervene and Protests, Ready for Environmental
Analysis, and Soliciting Comments, Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Existing Minor License.
b. Project No.: 1992-003.
c. Date filed: April 25, 2008.
d. Applicant: Mr. Ken Willis.
e. Name of Project: Fire Mountain Lodge.
f. Location: On Fern Spring in Tehama County, California. The
project is located primarily on privately owned land except for 1.07
acres of the dam and reservoir which is located on U.S. Forest Service
land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Ken Willis, Fire Mountain Lodge, 43500
Highway 36, Mill Creek, CA 96060, (530) 258-1952.
i. FERC Contact: Matt Buhyoff, (202) 502-6824 or
matt.buhyoff@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and prescriptions: 60 days from
the issuance date of this notice; reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The existing Fire Mountain Lodge project consists of: (1) A 265-
foot-long earth and concrete filled dam; (2) a 0.24-acre reservoir; (3)
a 38 inch intake tower; (4) a 1540-foot-long penstock; (5) a powerhouse
with an installed capacity of 60-kilowatts; a (6) a 4000 foot-long
transmission line and; (7) appurtenant facilities. The power generated
by the project is utilized for commercial and residential purposes,
solely for the owners of Fire Mountain Lodge, a self-provider of
electricity.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: April 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10508 Filed 4-29-11; 8:45 am]
BILLING CODE 6717-01-P