Midwest Independent Transmission System Operator, Inc.; Notice of Petition for Declaratory Order, 22697 [2011-9799]

Download as PDF mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices filed. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI11–5–000) on any comments, protests, and/or motions filed. k. Description of Project: The existing Redwood Falls Hydroelectric Project consists of: (1) An existing 583-acre reservoir; (2) an existing 250-foot-long, 37-foot-high concrete dam; (3) an existing 1,080-foot-long, 20-to-25-square foot concrete flume/tunnel to a 100-footlong, 5-foot-diameter concrete penstock; (4) an existing 30-foot-long, 35-footwide concrete block powerhouse that will contain a proposed 600-kW turbine/generator; (5) a tailrace returning flows to Redwood River; and (6) appurtenant facilities. When a Petition for Declaratory Order is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available VerDate Mar<15>2010 16:01 Apr 21, 2011 Jkt 223001 for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: April 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9798 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11–34–000] Midwest Independent Transmission System Operator, Inc.; Notice of Petition for Declaratory Order Take notice that on April 8, 2011, pursuant to Rule 207(a)(2) of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.207(a)(2) (2011), Midwest Independent PO 00000 Frm 00031 Fmt 4703 Sfmt 9990 22697 Transmission System Operator, Inc. (MISO) filed a petition for declaratory order seeking the Commission’s confirmation that the terms of the Joint Operating Agreement (JOA) in effect between Southwest Power Pool and MISO, regarding the sharing of transmission capacity on a common path, as set forth in section 5.2 of the JOA, will remain in effect and applicable to Entergy Arkansas, Inc. (Entergy Arkansas) in the event Entergy Arkansas becomes a transmissionowning member of MISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 9, 2011. Dated: April 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9799 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\22APN1.SGM 22APN1

Agencies

[Federal Register Volume 76, Number 78 (Friday, April 22, 2011)]
[Notices]
[Page 22697]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9799]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL11-34-000]


Midwest Independent Transmission System Operator, Inc.; Notice of 
Petition for Declaratory Order

    Take notice that on April 8, 2011, pursuant to Rule 207(a)(2) of 
the Rules of Practice and Procedure of the Federal Energy Regulatory 
Commission (Commission), 18 CFR 385.207(a)(2) (2011), Midwest 
Independent Transmission System Operator, Inc. (MISO) filed a petition 
for declaratory order seeking the Commission's confirmation that the 
terms of the Joint Operating Agreement (JOA) in effect between 
Southwest Power Pool and MISO, regarding the sharing of transmission 
capacity on a common path, as set forth in section 5.2 of the JOA, will 
remain in effect and applicable to Entergy Arkansas, Inc. (Entergy 
Arkansas) in the event Entergy Arkansas becomes a transmission-owning 
member of MISO.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on May 9, 2011.

    Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9799 Filed 4-21-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.