City of Redwood Falls; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions to Intervene, 22696-22697 [2011-9798]
Download as PDF
22696
Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 9, 2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
mstockstill on DSKH9S0YB1PROD with NOTICES
Dated: April 18, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–9809 Filed 4–21–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:01 Apr 21, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER08–370–000; EL08–22–006]
Missouri River Energy Services,
Western Minnesota Municipal Power
Agency; Notice of Motion To Withdraw
Filing and Request for Expedited
Action
On March 23, 2011, Missouri River
Energy Services and Western Minnesota
Municipal Power Agency (collectively,
MRES/WMMPA) filed a motion to
withdraw its Attachment O
transmission formula rate tariff sheets
under the Midwest Independent
Transmission System Operator, Inc.’s
(Midwest ISO) Open Access
Transmission, Energy and Operating
Reserve Markets Tariff. MRES/WMMPA
also request that the Commission act on
this motion no later than May 1, 2011.
MRES/WMMPA state that in light of
changed circumstances, MRES has
determined that it desires to now use
the Midwest ISO’s pro forma Nonlevelized Template therefore its initial
choice to use the Cash Flow Template
Attachment O transmission formula rate
filed in the above proceedings is no
longer needed.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on April 22, 2011.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9800 Filed 4–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI11–5–000]
City of Redwood Falls; Notice of
Petition for Declaratory Order and
Soliciting Comments, Protests, and/or
Motions to Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Petition for
Declaratory Order.
b. Docket No.: DI11–5–000.
c. Date Filed: April 1, 2011.
d. Applicant: City of Redwood Falls.
e. Name of Project: Redwood Falls
Hydroelectric Project.
f. Location: The existing Redwood
Falls Hydroelectric Project is located on
the Redwood River, in the town of
Redwood Falls, Redwood County,
Minnesota.
g. Filed Pursuant to: section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Tor S. Hansen,
Barr Engineering Company, 4700 West
77th Street, Edina, MN 55435;
telephone: (952) 832–2758; Fax: (952)
832–2601; e-mail: https://
www.thansen@barr.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: May 20, 2011.
All documents should be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paper-
E:\FR\FM\22APN1.SGM
22APN1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices
filed. To paper-file, an original and
seven copies should be filed with:
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. Please include the
docket number (DI11–5–000) on any
comments, protests, and/or motions
filed.
k. Description of Project: The existing
Redwood Falls Hydroelectric Project
consists of: (1) An existing 583-acre
reservoir; (2) an existing 250-foot-long,
37-foot-high concrete dam; (3) an
existing 1,080-foot-long, 20-to-25-square
foot concrete flume/tunnel to a 100-footlong, 5-foot-diameter concrete penstock;
(4) an existing 30-foot-long, 35-footwide concrete block powerhouse that
will contain a proposed 600-kW
turbine/generator; (5) a tailrace
returning flows to Redwood River; and
(6) appurtenant facilities.
When a Petition for Declaratory Order
is filed with the Federal Energy
Regulatory Commission, the Federal
Power Act requires the Commission to
investigate and determine if the
interests of interstate or foreign
commerce would be affected by the
proposed project. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy or affect
public lands or reservations of the
United States; (3) would utilize surplus
water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659. A copy is also available
VerDate Mar<15>2010
16:01 Apr 21, 2011
Jkt 223001
for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9798 Filed 4–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–34–000]
Midwest Independent Transmission
System Operator, Inc.; Notice of
Petition for Declaratory Order
Take notice that on April 8, 2011,
pursuant to Rule 207(a)(2) of the Rules
of Practice and Procedure of the Federal
Energy Regulatory Commission
(Commission), 18 CFR 385.207(a)(2)
(2011), Midwest Independent
PO 00000
Frm 00031
Fmt 4703
Sfmt 9990
22697
Transmission System Operator, Inc.
(MISO) filed a petition for declaratory
order seeking the Commission’s
confirmation that the terms of the Joint
Operating Agreement (JOA) in effect
between Southwest Power Pool and
MISO, regarding the sharing of
transmission capacity on a common
path, as set forth in section 5.2 of the
JOA, will remain in effect and
applicable to Entergy Arkansas, Inc.
(Entergy Arkansas) in the event Entergy
Arkansas becomes a transmissionowning member of MISO.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 9, 2011.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9799 Filed 4–21–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 76, Number 78 (Friday, April 22, 2011)]
[Notices]
[Pages 22696-22697]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9798]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI11-5-000]
City of Redwood Falls; Notice of Petition for Declaratory Order
and Soliciting Comments, Protests, and/or Motions to Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Petition for Declaratory Order.
b. Docket No.: DI11-5-000.
c. Date Filed: April 1, 2011.
d. Applicant: City of Redwood Falls.
e. Name of Project: Redwood Falls Hydroelectric Project.
f. Location: The existing Redwood Falls Hydroelectric Project is
located on the Redwood River, in the town of Redwood Falls, Redwood
County, Minnesota.
g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Tor S. Hansen, Barr Engineering Company, 4700
West 77th Street, Edina, MN 55435; telephone: (952) 832-2758; Fax:
(952) 832-2601; e-mail: http://www.thansen@barr.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or E-mail address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: May 20,
2011.
All documents should be filed electronically via the Internet. See
18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-
[[Page 22697]]
filed. To paper-file, an original and seven copies should be filed
with: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. Please include the docket number
(DI11-5-000) on any comments, protests, and/or motions filed.
k. Description of Project: The existing Redwood Falls Hydroelectric
Project consists of: (1) An existing 583-acre reservoir; (2) an
existing 250-foot-long, 37-foot-high concrete dam; (3) an existing
1,080-foot-long, 20-to-25-square foot concrete flume/tunnel to a 100-
foot-long, 5-foot-diameter concrete penstock; (4) an existing 30-foot-
long, 35-foot-wide concrete block powerhouse that will contain a
proposed 600-kW turbine/generator; (5) a tailrace returning flows to
Redwood River; and (6) appurtenant facilities.
When a Petition for Declaratory Order is filed with the Federal
Energy Regulatory Commission, the Federal Power Act requires the
Commission to investigate and determine if the interests of interstate
or foreign commerce would be affected by the proposed project. The
Commission also determines whether or not the project: (1) Would be
located on a navigable waterway; (2) would occupy or affect public
lands or reservations of the United States; (3) would utilize surplus
water or water power from a government dam; or (4) if applicable, has
involved or would involve any construction subsequent to 1935 that may
have increased or would increase the project's head or generating
capacity, or have otherwise significantly modified the project's pre-
1935 design or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676,
or TTY, contact (202) 502-8659. A copy is also available for inspection
and reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9798 Filed 4-21-11; 8:45 am]