City of Redwood Falls; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions to Intervene, 22696-22697 [2011-9798]

Download as PDF 22696 Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is May 9, 2011. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. mstockstill on DSKH9S0YB1PROD with NOTICES Dated: April 18, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–9809 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:01 Apr 21, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER08–370–000; EL08–22–006] Missouri River Energy Services, Western Minnesota Municipal Power Agency; Notice of Motion To Withdraw Filing and Request for Expedited Action On March 23, 2011, Missouri River Energy Services and Western Minnesota Municipal Power Agency (collectively, MRES/WMMPA) filed a motion to withdraw its Attachment O transmission formula rate tariff sheets under the Midwest Independent Transmission System Operator, Inc.’s (Midwest ISO) Open Access Transmission, Energy and Operating Reserve Markets Tariff. MRES/WMMPA also request that the Commission act on this motion no later than May 1, 2011. MRES/WMMPA state that in light of changed circumstances, MRES has determined that it desires to now use the Midwest ISO’s pro forma Nonlevelized Template therefore its initial choice to use the Cash Flow Template Attachment O transmission formula rate filed in the above proceedings is no longer needed. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 22, 2011. Dated: April 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9800 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI11–5–000] City of Redwood Falls; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions to Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Petition for Declaratory Order. b. Docket No.: DI11–5–000. c. Date Filed: April 1, 2011. d. Applicant: City of Redwood Falls. e. Name of Project: Redwood Falls Hydroelectric Project. f. Location: The existing Redwood Falls Hydroelectric Project is located on the Redwood River, in the town of Redwood Falls, Redwood County, Minnesota. g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Tor S. Hansen, Barr Engineering Company, 4700 West 77th Street, Edina, MN 55435; telephone: (952) 832–2758; Fax: (952) 832–2601; e-mail: https:// www.thansen@barr.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: May 20, 2011. All documents should be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. If unable to be filed electronically, documents may be paper- E:\FR\FM\22APN1.SGM 22APN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices filed. To paper-file, an original and seven copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. Please include the docket number (DI11–5–000) on any comments, protests, and/or motions filed. k. Description of Project: The existing Redwood Falls Hydroelectric Project consists of: (1) An existing 583-acre reservoir; (2) an existing 250-foot-long, 37-foot-high concrete dam; (3) an existing 1,080-foot-long, 20-to-25-square foot concrete flume/tunnel to a 100-footlong, 5-foot-diameter concrete penstock; (4) an existing 30-foot-long, 35-footwide concrete block powerhouse that will contain a proposed 600-kW turbine/generator; (5) a tailrace returning flows to Redwood River; and (6) appurtenant facilities. When a Petition for Declaratory Order is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. A copy is also available VerDate Mar<15>2010 16:01 Apr 21, 2011 Jkt 223001 for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: April 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9798 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11–34–000] Midwest Independent Transmission System Operator, Inc.; Notice of Petition for Declaratory Order Take notice that on April 8, 2011, pursuant to Rule 207(a)(2) of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.207(a)(2) (2011), Midwest Independent PO 00000 Frm 00031 Fmt 4703 Sfmt 9990 22697 Transmission System Operator, Inc. (MISO) filed a petition for declaratory order seeking the Commission’s confirmation that the terms of the Joint Operating Agreement (JOA) in effect between Southwest Power Pool and MISO, regarding the sharing of transmission capacity on a common path, as set forth in section 5.2 of the JOA, will remain in effect and applicable to Entergy Arkansas, Inc. (Entergy Arkansas) in the event Entergy Arkansas becomes a transmissionowning member of MISO. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 9, 2011. Dated: April 15, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9799 Filed 4–21–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\22APN1.SGM 22APN1

Agencies

[Federal Register Volume 76, Number 78 (Friday, April 22, 2011)]
[Notices]
[Pages 22696-22697]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9798]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI11-5-000]


City of Redwood Falls; Notice of Petition for Declaratory Order 
and Soliciting Comments, Protests, and/or Motions to Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Petition for Declaratory Order.
    b. Docket No.: DI11-5-000.
    c. Date Filed: April 1, 2011.
    d. Applicant: City of Redwood Falls.
    e. Name of Project: Redwood Falls Hydroelectric Project.
    f. Location: The existing Redwood Falls Hydroelectric Project is 
located on the Redwood River, in the town of Redwood Falls, Redwood 
County, Minnesota.
    g. Filed Pursuant to: section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Tor S. Hansen, Barr Engineering Company, 4700 
West 77th Street, Edina, MN 55435; telephone: (952) 832-2758; Fax: 
(952) 832-2601; e-mail: http://www.thansen@barr.com.
    i. FERC Contact: Any questions on this notice should be addressed 
to Henry Ecton, (202) 502-8768, or E-mail address: 
henry.ecton@ferc.gov.
    j. Deadline for filing comments, protests, and/or motions: May 20, 
2011.
    All documents should be filed electronically via the Internet. See 
18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be 
filed electronically, documents may be paper-

[[Page 22697]]

filed. To paper-file, an original and seven copies should be filed 
with: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    Commenters can submit brief comments up to 6,000 characters, 
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. Please include the docket number 
(DI11-5-000) on any comments, protests, and/or motions filed.
    k. Description of Project: The existing Redwood Falls Hydroelectric 
Project consists of: (1) An existing 583-acre reservoir; (2) an 
existing 250-foot-long, 37-foot-high concrete dam; (3) an existing 
1,080-foot-long, 20-to-25-square foot concrete flume/tunnel to a 100-
foot-long, 5-foot-diameter concrete penstock; (4) an existing 30-foot-
long, 35-foot-wide concrete block powerhouse that will contain a 
proposed 600-kW turbine/generator; (5) a tailrace returning flows to 
Redwood River; and (6) appurtenant facilities.
    When a Petition for Declaratory Order is filed with the Federal 
Energy Regulatory Commission, the Federal Power Act requires the 
Commission to investigate and determine if the interests of interstate 
or foreign commerce would be affected by the proposed project. The 
Commission also determines whether or not the project: (1) Would be 
located on a navigable waterway; (2) would occupy or affect public 
lands or reservations of the United States; (3) would utilize surplus 
water or water power from a government dam; or (4) if applicable, has 
involved or would involve any construction subsequent to 1935 that may 
have increased or would increase the project's head or generating 
capacity, or have otherwise significantly modified the project's pre-
1935 design or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the Web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, 
or TTY, contact (202) 502-8659. A copy is also available for inspection 
and reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9798 Filed 4-21-11; 8:45 am]
BILLING CODE 6717-01-P