Arizona Independent Power, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 22698 [2011-9792]
Download as PDF
22698
Federal Register / Vol. 76, No. 78 / Friday, April 22, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14061–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
Arizona Independent Power, Inc.;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 12, 2011, Arizona
Independent Power, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Verde Pumped Storage
Project (project) to be located within the
Colorado River region, near Maricopa
County, Arizona. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A roller compacted
concrete dam (upper reservoir) having a
total storage capacity of 13,900 acre-feet
at a normal maximum operating
elevation of 3,040 feet msl; (2) a roller
compacted concrete dam (lower
reservoir) having a total storage capacity
of 13,900 acre-feet at a normal
maximum operating elevation of 1,800
feet mean sea level (msl); (3) two
12,160-foot-long, 19-foot-diameter
penstocks; (4) a powerhouse with
approximate dimensions of 750 feet
long by 70 feet wide by 175 feet high,
housing three to 267 megawatt Francis
pump turbines and motor generators
units; (5) two 3,000-foot-long, 21-footdiameter tailraces; (6) a twin circuit, 40mile-long, 500-kilovolt transmission
line extending to the existing
transmission line rights-of-way owned
by the Arizona Public Service Company
or Salt River Project. The estimated
annual generation of the Verde Pumped
Storage Project would be 1,078 gigawatthours.
Applicant Contact: Mr. Frank L.
Mazzone, President, Arizona
Independent Power, Inc., 957 Fairway
Drive, Sonoma, CA 95476; phone: (707)
996–2573.
FERC Contact: Mary Greene; phone:
(202) 502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
VerDate Mar<15>2010
16:01 Apr 21, 2011
Jkt 223001
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14061–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9792 Filed 4–21–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–187–000]
Gulf South Pipeline Company, LP;
Notice of Request Under Blanket
Authorization
Take notice that on April 11, 2011,
Gulf South Pipeline Company, LP (Gulf
South), 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, pursuant to its
blanket certificate issued in Docket No.
CP82–430–000,1 filed an application in
accordance to sections 157.205(b), and
157.208(f)(2) of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, requesting to
increase the pipeline capacity and
maximum operating pressure of its
1 Gulf South Pipeline Company, LP, 20 FERC
¶ 62,416 (1982).
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Mobile Bay Lateral (Index 880) in
Mobile County, Alabama, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection.
Gulf South proposes to increase the
south-bound capacity of its Index 880
by 54 MMcf/day to 304,000 MMcf/day
by increasing the maximum operating
pressure on the lateral from 976 to 982
psig. This increase in capacity will
provide Gulf South’s shippers the added
flexibility to nominate additional
deliveries into Florida markets through
the Gulfstream Interconnect. Increasing
the capacity by increasing the maximum
operating pressure of the Index 880 will
provide Gulf South with a timely and
cost effective method of increasing firm
transportation capacity to additional
Florida markets. Gulf South states that
its proposal will not have any adverse
effects on the processing plant’s
operations.
Any questions concerning this
application may be directed to J. Kyle
Stephens, Vice President, Regulatory
Affairs, Gulf South Pipeline Company,
LP, 9 Greenway Plaza, Suite 2800,
Houston, Texas 77046, at (713) 479–
8033 or via fax (713) 479–1846, or
e-mail at Kyle.Stephens@bwpmlp.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefor, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
E:\FR\FM\22APN1.SGM
22APN1
Agencies
[Federal Register Volume 76, Number 78 (Friday, April 22, 2011)]
[Notices]
[Page 22698]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9792]
[[Page 22698]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14061-000]
Arizona Independent Power, Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 12, 2011, Arizona Independent Power, Inc. filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Verde Pumped Storage Project (project) to be located within the
Colorado River region, near Maricopa County, Arizona. The sole purpose
of a preliminary permit, if issued, is to grant the permit holder
priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A roller
compacted concrete dam (upper reservoir) having a total storage
capacity of 13,900 acre-feet at a normal maximum operating elevation of
3,040 feet msl; (2) a roller compacted concrete dam (lower reservoir)
having a total storage capacity of 13,900 acre-feet at a normal maximum
operating elevation of 1,800 feet mean sea level (msl); (3) two 12,160-
foot-long, 19-foot-diameter penstocks; (4) a powerhouse with
approximate dimensions of 750 feet long by 70 feet wide by 175 feet
high, housing three to 267 megawatt Francis pump turbines and motor
generators units; (5) two 3,000-foot-long, 21-foot-diameter tailraces;
(6) a twin circuit, 40-mile-long, 500-kilovolt transmission line
extending to the existing transmission line rights-of-way owned by the
Arizona Public Service Company or Salt River Project. The estimated
annual generation of the Verde Pumped Storage Project would be 1,078
gigawatt-hours.
Applicant Contact: Mr. Frank L. Mazzone, President, Arizona
Independent Power, Inc., 957 Fairway Drive, Sonoma, CA 95476; phone:
(707) 996-2573.
FERC Contact: Mary Greene; phone: (202) 502-8865.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14061-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: April 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9792 Filed 4-21-11; 8:45 am]
BILLING CODE 6717-01-P