Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES 22094 Federal Register / Vol. 76, No. 76 / Wednesday, April 20, 2011 / Notices two copies of their comments to the Secretary of the Commission. Environmental cementers will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental cementers will not be required to serve copies of filed documents on all other parties. However, the nonparty commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free) or TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 4, 2011. Dated: April 13, 2011. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. LSP Energy, Inc ................... Milford Wind Corridor Phase II, LLC ............................... Elk Wind Energy LLC ........... Grande Prairie Generation, Inc ..................................... Mountain View Power Partner IV, LLC ........................ Cedar Point Wind, LLC ........ Gratiot County Wind LLC ..... Cambria CoGen Company ... CPV Batesville, LLC ............. Mount Miller Wind Energy Limited Partner .................. Grande Prairie Generation, Inc ..................................... EG11–43–000 EG11–44–000 EG11–45–000 EG11–46–000 EG11–47–000 EG11–48–000 EG11–49–000 EG11–50–000 EG11–51–000 VerDate Mar<15>2010 17:52 Apr 19, 2011 Dated: April 13, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9519 Filed 4–19–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11–184–000] Millennium Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on April 8, 2011, Millennium Pipeline Company, L.L.C. (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New York 10965, filed in Docket No. CP11–184–000, an application pursuant to sections 157.205 and 157.208 of the Commission’s Regulations under the Natural Gas Act (NGA) as amended, to construct, own, and operate the Corning Flow Reversal Project at Millennium’s Corning compressor station in Steuben County, New York, under Millennium’s blanket certificate issued in Docket No. CP98– 155–000,1 all as more fully set forth in the application which is on file with the 1 100 Jkt 223001 FC11–4–000 Take notice that during the month of March 2011, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). [FR Doc. 2011–9518 Filed 4–19–11; 8:45 am] BILLING CODE 6717–01–P FC11–3–000 PO 00000 FERC ¶ 62,172 (1982). Frm 00020 Fmt 4703 Sfmt 4703 Commission and open to the public for inspection. Millennium proposes to modify facilities interconnecting Millennium’s system with the system of Empire Pipeline, Inc. (Empire) by replacing two existing valves and adding six new valves and piping at Millennium’s Corning compressor station in Steuben County. Millennium also proposes to increase the maximum allowable operating pressure (MAOP) of the Corning compressor station discharge piping from 1200 psig to 1350 psig. Millennium states that the increased MAOP is necessary to permit it to occasionally reverse the flow of natural gas on its system to transport natural gas from either its 30-inch diameter mainline system or its A5–West pipeline via the Corning compressor station onto the facilities of Empire, which operate at an MAOP of 1300 psig. Millennium further states that the activity associated with the Corning Flow Reversal Project will not increase Millennium’s mainline capacity. Finally, Millennium estimates that the proposed modifications would cost $3,400,000 to construct. Any questions concerning this application may be directed to Gary A. Kruse, Vice President-General Counsel and Secretary, Millennium Pipeline Company, L.L.C., One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New York 10965, telephone (845) 620–1300, facsimile (845) 620–1320, Email: kruse@millenniumpipeline.com or to Thomas E. Holmberg, Baker Botts L.L.P., 1299 Pennsylvania Avenue, NW., Washington, DC 20004, telephone (202) 639–7700, facsimile (202) 585–1016, or via E-mail: thomas.holmberg@ bakerbotts.com. This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number filed to access the document. For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866) 206–3676, or, for TTY, contact (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR E:\FR\FM\20APN1.SGM 20APN1

Agencies

[Federal Register Volume 76, Number 76 (Wednesday, April 20, 2011)]
[Notices]
[Page 22094]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9519]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

------------------------------------------------------------------------
                                                            Docket Nos.
------------------------------------------------------------------------
LSP Energy, Inc.........................................     EG11-43-000
Milford Wind Corridor Phase II, LLC.....................     EG11-44-000
Elk Wind Energy LLC.....................................     EG11-45-000
Grande Prairie Generation, Inc..........................     EG11-46-000
Mountain View Power Partner IV, LLC.....................     EG11-47-000
Cedar Point Wind, LLC...................................     EG11-48-000
Gratiot County Wind LLC.................................     EG11-49-000
Cambria CoGen Company...................................     EG11-50-000
CPV Batesville, LLC.....................................     EG11-51-000
Mount Miller Wind Energy Limited Partner................      FC11-3-000
Grande Prairie Generation, Inc..........................      FC11-4-000
------------------------------------------------------------------------

    Take notice that during the month of March 2011, the status of the 
above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a).

    Dated: April 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9519 Filed 4-19-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.