Combined Notice of Filings No. 2, 21719-21720 [2011-9297]
Download as PDF
Federal Register / Vol. 76, No. 74 / Monday, April 18, 2011 / Notices
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: May 27, 2011.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
efiling.asp). Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filings, documents may also
be paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing Corps’ R.C. Byrd Locks and
Dam and would consist of the following
new facilities: (1) A 1,200-foot long
intake channel; (2) a trashrack located in
front of each of the generating unit
intakes, with a bar spacing of
approximately 8 inches; (3) a reinforced
concrete powerhouse measuring
approximately 258 feet long by 145 feet
wide by 110 feet high, and housing two
bulb-type turbine generator units with a
total installed capacity of 50 megawatts;
(4) a 900-foot-long tailrace channel; (5)
a 2.41-mile-long, 138-kilovolt
transmission line; and (6) appurtenant
facilities. The proposed project would
have an average annual generation of
266 gigawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Ohio State
Historic Preservation Officer (SHPO), as
required by 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36 CFR 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance ................................................................................................................................................
Issue Scoping Document I ..................................................................................................................................................
Comments on Scoping Document I ....................................................................................................................................
Revised Scoping Document ................................................................................................................................................
Issue notice of ready for environmental analysis ...............................................................................................................
Commission issues EA, draft EA ........................................................................................................................................
Notice of the availability of the EA ......................................................................................................................................
Dated: April 11, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–9249 Filed 4–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK5CLS3C1PROD with NOTICES
Combined Notice of Filings No. 2
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP04–274–028.
Applicants: Kern River Gas
Transmission Company.
Description: Additional Refund
Report of Kern River Gas Transmission
Company.
Filed Date: 04/04/2011.
Accession Number: 20110404–5088.
VerDate Mar<15>2010
15:25 Apr 15, 2011
Jkt 223001
Comment Date: 5 p.m. Eastern Time
on Monday, April 18, 2011.
Docket Numbers: RP10–1152–002.
Applicants: Florida Gas Transmission
Company, LLC.
Description: Florida Gas Transmission
Company, LLC submits tariff filing per
154.203: Implement Settlement
correction to be effective 4/1/2011.
Filed Date: 04/04/2011.
Accession Number: 20110404–5080.
Comment Date: 5 p.m. Eastern Time
on Monday, April 18, 2011.
Docket Numbers: RP11–1918–001.
Applicants: Pine Needle LNG
Company, LLC.
Description: Pine Needle LNG
Company, LLC submits tariff filing per
154.205(b): PN EP and Fuel Tracker
Amended For Approved Stipulation and
Agreement Rates to be effective 5/1/
2011.
Filed Date: 04/06/2011.
Accession Number: 20110406–5086.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
21719
July 2011
August 2011.
September 2011.
November 2011.
November 2011.
April 2012.
June 2012.
Comment Date: 5 p.m. Eastern Time
on Monday, April 18, 2011.
Docket Numbers: RP11–1776–001.
Applicants: Nautilus Pipeline
Company, L.L.C.
Description: Nautilus Pipeline
Company, L.L.C. submits tariff filing per
154.203: Nautilus Non-Conforming
Agreements Refile to be effective 2/14/
2011.
Filed Date: 04/07/2011.
Accession Number: 20110407–5109.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 19, 2011.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
5 p.m. Eastern time on the specified
E:\FR\FM\18APN1.SGM
18APN1
21720
Federal Register / Vol. 76, No. 74 / Monday, April 18, 2011 / Notices
comment date. Anyone filing a protest
must serve a copy of that document on
all the parties to the proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 12, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–9297 Filed 4–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK5CLS3C1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2434–002.
Applicants: Wisconsin Electric Power
Company.
Description: Wisconsin Electric Power
Company submits tariff filing per 35:
FERC Rate Schedule 115 Amended
Service Agreement Compliance Filing to
be effective 9/9/2010.
Filed Date: 04/05/2011.
Accession Number: 20110405–5044.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3290–000.
Applicants: American Electric Power
Service Corporation, PJM
Interconnection, L.L.C.
Description: American Electric Power
Service Corporation submits tariff filing
per 35.13(a)(2)(iii): AEPSC filed a 25th
revision to the AEPSC & Buckeye ILDSA
under SA No. 1336 to be effective 3/8/
2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5034.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
VerDate Mar<15>2010
15:25 Apr 15, 2011
Jkt 223001
Docket Numbers: ER11–3291–000.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii): Queue No. W4–030;
Original Service Agreement No. 2804 to
be effective 3/7/2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5036.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3292–000.
Applicants: NSTAR Electric
Company.
Description: NSTAR Electric
Company submits tariff filing per
35.13(a)(2)(iii): GenOn Diesels
Distribution Service Agreement—
Amendment to First Supplement to be
effective 6/1/2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5052.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3293–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii): Amendment to IFA
and Service Agreement with PAPCO to
be effective 4/16/2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5053.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3294–000.
Applicants: Sempra Generation.
Description: Sempra Generation
submits tariff filing per 35.13(a)(2)(iii):
Revision to Sempra Generation FERC
Electric MBR Tariff to be effective 4/5/
2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5058.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3295–000.
Applicants: El Dorado Energy, LLC.
Description: El Dorado Energy, LLC
submits tariff filing per 35.13(a)(2)(iii):
Revision to El Dorado Energy LLC FERC
Electric MBR Tariff to be effective 4/5/
2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5059.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3296–000.
Applicants: Mesquite Power, LLC.
Description: Mesquite Power, LLC
submits tariff filing per 35.13(a)(2)(iii):
Revision to Mesquite Power LLC FERC
Electric MBR Tariff to be effective 4/5/
2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5060.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Docket Numbers: ER11–3297–000.
Applicants: Termoelectrica U.S., LLC.
Description: Termoelectrica U.S., LLC
submits tariff filing per 35.13(a)(2)(iii):
Revision to Termoelectrica U.S. LLC
FERC Electric MBR Tariff to be effective
4/5/2011.
Filed Date: 04/05/2011.
Accession Number: 20110405–5062.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 26, 2011.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF11–207–000.
Applicants: PowerSecure, Inc.
Description: Form 556—Notice of selfcertification of qualifying cogeneration
facility status of PowerSecure, Inc.
Filed Date: 04/04/2011.
Accession Number: 20110404–5079.
Comment Date: None Applicable.
Docket Numbers: QF11–208–000.
Applicants: Cambridge Housing
Authority.
Description: Form 556—Notice of selfcertification of qualifying cogeneration
facility status of Cambridge Housing
Authority- Lyndon B. Johnson
Apartments.
Filed Date: 04/04/2011.
Accession Number: 20110404–5105.
Comment Date: None Applicable.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
As it relates to any qualifying facility
filings, the notices of self-certification
[or self-recertification] listed above, do
not institute a proceeding regarding
qualifying facility status. A notice of
self-certification [or self-recertification]
simply provides notification that the
entity making the filing has determined
the facility named in the notice meets
the applicable criteria to be a qualifying
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 76, Number 74 (Monday, April 18, 2011)]
[Notices]
[Pages 21719-21720]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9297]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings No. 2
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP04-274-028.
Applicants: Kern River Gas Transmission Company.
Description: Additional Refund Report of Kern River Gas
Transmission Company.
Filed Date: 04/04/2011.
Accession Number: 20110404-5088.
Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.
Docket Numbers: RP10-1152-002.
Applicants: Florida Gas Transmission Company, LLC.
Description: Florida Gas Transmission Company, LLC submits tariff
filing per 154.203: Implement Settlement correction to be effective 4/
1/2011.
Filed Date: 04/04/2011.
Accession Number: 20110404-5080.
Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.
Docket Numbers: RP11-1918-001.
Applicants: Pine Needle LNG Company, LLC.
Description: Pine Needle LNG Company, LLC submits tariff filing per
154.205(b): PN EP and Fuel Tracker Amended For Approved Stipulation and
Agreement Rates to be effective 5/1/2011.
Filed Date: 04/06/2011.
Accession Number: 20110406-5086.
Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.
Docket Numbers: RP11-1776-001.
Applicants: Nautilus Pipeline Company, L.L.C.
Description: Nautilus Pipeline Company, L.L.C. submits tariff
filing per 154.203: Nautilus Non-Conforming Agreements Refile to be
effective 2/14/2011.
Filed Date: 04/07/2011.
Accession Number: 20110407-5109.
Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed on or before 5 p.m. Eastern time on the specified
[[Page 21720]]
comment date. Anyone filing a protest must serve a copy of that
document on all the parties to the proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY,
call (202) 502-8659.
Dated: April 12, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-9297 Filed 4-15-11; 8:45 am]
BILLING CODE 6717-01-P