Download as PDF Federal Register / Vol. 76, No. 74 / Monday, April 18, 2011 / Notices instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: May 27, 2011. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov/docs-filing/ efiling.asp). Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filings, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. m. The application is not ready for environmental analysis at this time. n. The proposed project would utilize the existing Corps’ R.C. Byrd Locks and Dam and would consist of the following new facilities: (1) A 1,200-foot long intake channel; (2) a trashrack located in front of each of the generating unit intakes, with a bar spacing of approximately 8 inches; (3) a reinforced concrete powerhouse measuring approximately 258 feet long by 145 feet wide by 110 feet high, and housing two bulb-type turbine generator units with a total installed capacity of 50 megawatts; (4) a 900-foot-long tailrace channel; (5) a 2.41-mile-long, 138-kilovolt transmission line; and (6) appurtenant facilities. The proposed project would have an average annual generation of 266 gigawatt-hours. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. With this notice, we are initiating consultation with the Ohio State Historic Preservation Officer (SHPO), as required by 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. q. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance ................................................................................................................................................ Issue Scoping Document I .................................................................................................................................................. Comments on Scoping Document I .................................................................................................................................... Revised Scoping Document ................................................................................................................................................ Issue notice of ready for environmental analysis ............................................................................................................... Commission issues EA, draft EA ........................................................................................................................................ Notice of the availability of the EA ...................................................................................................................................... Dated: April 11, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9249 Filed 4–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission erowe on DSK5CLS3C1PROD with NOTICES Combined Notice of Filings No. 2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP04–274–028. Applicants: Kern River Gas Transmission Company. Description: Additional Refund Report of Kern River Gas Transmission Company. Filed Date: 04/04/2011. Accession Number: 20110404–5088. VerDate Mar<15>2010 15:25 Apr 15, 2011 Jkt 223001 Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011. Docket Numbers: RP10–1152–002. Applicants: Florida Gas Transmission Company, LLC. Description: Florida Gas Transmission Company, LLC submits tariff filing per 154.203: Implement Settlement correction to be effective 4/1/2011. Filed Date: 04/04/2011. Accession Number: 20110404–5080. Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011. Docket Numbers: RP11–1918–001. Applicants: Pine Needle LNG Company, LLC. Description: Pine Needle LNG Company, LLC submits tariff filing per 154.205(b): PN EP and Fuel Tracker Amended For Approved Stipulation and Agreement Rates to be effective 5/1/ 2011. Filed Date: 04/06/2011. Accession Number: 20110406–5086. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 21719 July 2011 August 2011. September 2011. November 2011. November 2011. April 2012. June 2012. Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011. Docket Numbers: RP11–1776–001. Applicants: Nautilus Pipeline Company, L.L.C. Description: Nautilus Pipeline Company, L.L.C. submits tariff filing per 154.203: Nautilus Non-Conforming Agreements Refile to be effective 2/14/ 2011. Filed Date: 04/07/2011. Accession Number: 20110407–5109. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified E:\FR\FM\18APN1.SGM 18APN1 21720 Federal Register / Vol. 76, No. 74 / Monday, April 18, 2011 / Notices comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 12, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–9297 Filed 4–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission erowe on DSK5CLS3C1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–2434–002. Applicants: Wisconsin Electric Power Company. Description: Wisconsin Electric Power Company submits tariff filing per 35: FERC Rate Schedule 115 Amended Service Agreement Compliance Filing to be effective 9/9/2010. Filed Date: 04/05/2011. Accession Number: 20110405–5044. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3290–000. Applicants: American Electric Power Service Corporation, PJM Interconnection, L.L.C. Description: American Electric Power Service Corporation submits tariff filing per 35.13(a)(2)(iii): AEPSC filed a 25th revision to the AEPSC & Buckeye ILDSA under SA No. 1336 to be effective 3/8/ 2011. Filed Date: 04/05/2011. Accession Number: 20110405–5034. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. VerDate Mar<15>2010 15:25 Apr 15, 2011 Jkt 223001 Docket Numbers: ER11–3291–000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii): Queue No. W4–030; Original Service Agreement No. 2804 to be effective 3/7/2011. Filed Date: 04/05/2011. Accession Number: 20110405–5036. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3292–000. Applicants: NSTAR Electric Company. Description: NSTAR Electric Company submits tariff filing per 35.13(a)(2)(iii): GenOn Diesels Distribution Service Agreement— Amendment to First Supplement to be effective 6/1/2011. Filed Date: 04/05/2011. Accession Number: 20110405–5052. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3293–000. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits tariff filing per 35.13(a)(2)(iii): Amendment to IFA and Service Agreement with PAPCO to be effective 4/16/2011. Filed Date: 04/05/2011. Accession Number: 20110405–5053. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3294–000. Applicants: Sempra Generation. Description: Sempra Generation submits tariff filing per 35.13(a)(2)(iii): Revision to Sempra Generation FERC Electric MBR Tariff to be effective 4/5/ 2011. Filed Date: 04/05/2011. Accession Number: 20110405–5058. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3295–000. Applicants: El Dorado Energy, LLC. Description: El Dorado Energy, LLC submits tariff filing per 35.13(a)(2)(iii): Revision to El Dorado Energy LLC FERC Electric MBR Tariff to be effective 4/5/ 2011. Filed Date: 04/05/2011. Accession Number: 20110405–5059. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3296–000. Applicants: Mesquite Power, LLC. Description: Mesquite Power, LLC submits tariff filing per 35.13(a)(2)(iii): Revision to Mesquite Power LLC FERC Electric MBR Tariff to be effective 4/5/ 2011. Filed Date: 04/05/2011. Accession Number: 20110405–5060. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Docket Numbers: ER11–3297–000. Applicants: Termoelectrica U.S., LLC. Description: Termoelectrica U.S., LLC submits tariff filing per 35.13(a)(2)(iii): Revision to Termoelectrica U.S. LLC FERC Electric MBR Tariff to be effective 4/5/2011. Filed Date: 04/05/2011. Accession Number: 20110405–5062. Comment Date: 5 p.m. Eastern Time on Tuesday, April 26, 2011. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF11–207–000. Applicants: PowerSecure, Inc. Description: Form 556—Notice of selfcertification of qualifying cogeneration facility status of PowerSecure, Inc. Filed Date: 04/04/2011. Accession Number: 20110404–5079. Comment Date: None Applicable. Docket Numbers: QF11–208–000. Applicants: Cambridge Housing Authority. Description: Form 556—Notice of selfcertification of qualifying cogeneration facility status of Cambridge Housing Authority- Lyndon B. Johnson Apartments. Filed Date: 04/04/2011. Accession Number: 20110404–5105. Comment Date: None Applicable. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. As it relates to any qualifying facility filings, the notices of self-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self-certification [or self-recertification] simply provides notification that the entity making the filing has determined the facility named in the notice meets the applicable criteria to be a qualifying E:\FR\FM\18APN1.SGM 18APN1

Agencies

[Federal Register Volume 76, Number 74 (Monday, April 18, 2011)]
[Notices]
[Pages 21719-21720]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9297]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings No. 2

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:
    Docket Numbers: RP04-274-028.
    Applicants: Kern River Gas Transmission Company.
    Description: Additional Refund Report of Kern River Gas 
Transmission Company.
    Filed Date: 04/04/2011.
    Accession Number: 20110404-5088.
    Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.

    Docket Numbers: RP10-1152-002.
    Applicants: Florida Gas Transmission Company, LLC.
    Description: Florida Gas Transmission Company, LLC submits tariff 
filing per 154.203: Implement Settlement correction to be effective 4/
1/2011.
    Filed Date: 04/04/2011.
    Accession Number: 20110404-5080.
    Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.

    Docket Numbers: RP11-1918-001.
    Applicants: Pine Needle LNG Company, LLC.
    Description: Pine Needle LNG Company, LLC submits tariff filing per 
154.205(b): PN EP and Fuel Tracker Amended For Approved Stipulation and 
Agreement Rates to be effective 5/1/2011.
    Filed Date: 04/06/2011.
    Accession Number: 20110406-5086.
    Comment Date: 5 p.m. Eastern Time on Monday, April 18, 2011.

    Docket Numbers: RP11-1776-001.
    Applicants: Nautilus Pipeline Company, L.L.C.
    Description: Nautilus Pipeline Company, L.L.C. submits tariff 
filing per 154.203: Nautilus Non-Conforming Agreements Refile to be 
effective 2/14/2011.
    Filed Date: 04/07/2011.
    Accession Number: 20110407-5109.
    Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before 5 p.m. Eastern time on the specified

[[Page 21720]]

comment date. Anyone filing a protest must serve a copy of that 
document on all the parties to the proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov or call (866) 208-3676 (toll free). For TTY, 
call (202) 502-8659.

    Dated: April 12, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-9297 Filed 4-15-11; 8:45 am]
BILLING CODE 6717-01-P