Free Flow Power Corporation; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 20971 [2011-9070]

Download as PDF Federal Register / Vol. 76, No. 72 / Thursday, April 14, 2011 / Notices EventsList.aspx along with other related information. For further information, please contact David Turner at (202) 502–6191 or at david.turner@ferc.gov. Dated: April 8, 2011. Kimberly D. Bose, Secretary. docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Tuesday, April 19, 2011. Dated: April 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9065 Filed 4–13–11; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2011–9064 Filed 4–13–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY [Docket No. PR10–120–001] Federal Energy Regulatory Commission Eagle Rock Desoto Pipeline, L.P.; Notice of Filing mstockstill on DSKH9S0YB1PROD with NOTICES Federal Energy Regulatory Commission [Project No. P–13346–001] Take notice that on April 7, 2011, Eagle Rock Desoto Pipeline, L.P. filed a revised Statement of Operating Conditions to comply with an unpublished delegated letter order issued on November 12, 2010. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed VerDate Mar<15>2010 18:34 Apr 13, 2011 Jkt 223001 Free Flow Power Corporation; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No. 13346–001. c. Dated Filed: February 18, 2011. d. Submitted By: Free Flow Power Corporation (Free Flow Power), on behalf of its subsidiary Paynebridge, LLC. e. Name of Project: Williams Dam Water Power Project. f. Location: At the existing Williams dam owned by the Indiana Department of Natural Resources on the East Fork of the White River in Lawrence County, Indiana. No Federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 808(b)(1) and 18 CFR 5.5 of the Commission’s regulations. h. Potential Applicant Contact: Ramya Swaminathan, Chief Operating Officer, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114– 2130; or at (978) 283–2822. i. FERC Contact: Aaron Liberty at (202) 502–6862; or e-mail at aaron.liberty@ferc.gov. j. On February 18, 2011, Free Flow Power filed its request to use the Traditional Licensing Process and provided public notice of its request. On April 7, 2011, the Director, Division of Hydropower Licensing, approved the request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 20971 50 CFR part 402 and (b) the Indiana State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Free Flow Power as the Commission’s non-Federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. Free Flow Power filed a PreApplication Document (PAD), including a proposed process plan and schedule with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: April 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–9070 Filed 4–13–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2299–075] Turlock Irrigation District and Modesto Irrigation District; Notice of Intent To File License Application, Filing of PreApplication Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Pre-filing Process. E:\FR\FM\14APN1.SGM 14APN1

Agencies

[Federal Register Volume 76, Number 72 (Thursday, April 14, 2011)]
[Notices]
[Page 20971]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-9070]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-13346-001]


Free Flow Power Corporation; Notice of Intent To File License 
Application, Filing of Pre-Application Document, and Approving Use of 
the Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No. 13346-001.
    c. Dated Filed: February 18, 2011.
    d. Submitted By: Free Flow Power Corporation (Free Flow Power), on 
behalf of its subsidiary Paynebridge, LLC.
    e. Name of Project: Williams Dam Water Power Project.
    f. Location: At the existing Williams dam owned by the Indiana 
Department of Natural Resources on the East Fork of the White River in 
Lawrence County, Indiana. No Federal lands are occupied by the project 
works or located within the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 808(b)(1) and 18 
CFR 5.5 of the Commission's regulations.
    h. Potential Applicant Contact: Ramya Swaminathan, Chief Operating 
Officer, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 
02114-2130; or at (978) 283-2822.
    i. FERC Contact: Aaron Liberty at (202) 502-6862; or e-mail at 
aaron.liberty@ferc.gov.
    j. On February 18, 2011, Free Flow Power filed its request to use 
the Traditional Licensing Process and provided public notice of its 
request. On April 7, 2011, the Director, Division of Hydropower 
Licensing, approved the request to use the Traditional Licensing 
Process.
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service under section 7 of the 
Endangered Species Act and the joint agency regulations thereunder at 
50 CFR part 402 and (b) the Indiana State Historic Preservation 
Officer, as required by section 106 of the National Historic 
Preservation Act, and the implementing regulations of the Advisory 
Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Free Flow Power as the 
Commission's non-Federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. Free Flow Power filed a Pre-Application Document (PAD), 
including a proposed process plan and schedule with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: April 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-9070 Filed 4-13-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.