Qualified Hydro 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 20658 [2011-8888]
Download as PDF
20658
Federal Register / Vol. 76, No. 71 / Wednesday, April 13, 2011 / Notices
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Tuesday, April 12, 2011.
Dated: April 5, 2011.
Kimberly D. Bose,
Secretary.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern time
on Tuesday April 12, 2011.
Dated: April 5, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–8768 Filed 4–12–11; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2011–8764 Filed 4–12–11; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. PR11–100–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
Consumers Energy Company; Notice
of Filing
Take notice that on March 30, 2011,
Consumers Energy Company filed to
provide notice of its cancellation of its
Terms and Conditions for Interstate Gas
Transportation proposed to be effective
March 31, 2011, as more fully described
in the filing.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
VerDate Mar<15>2010
18:37 Apr 12, 2011
Jkt 223001
Federal Energy Regulatory
Commission
[Project No. 13850–000]
Qualified Hydro 25, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 30, 2010, Qualified
Hydro 25, LLC filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Easton Diversion Dam
Hydroelectric Project (Easton Dam
project) to be located on the Yakima
River near Easton in Kittitas County,
Washington. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The Commission issued a notice on
February 16, 2011, accepting the
application and soliciting comments,
motions to intervene, and competing
applications within a 60-day period. On
March 31, 2011, the Kittitas
Reclamation District filed a letter with
the Commission stating they were not
notified of the preliminary permit
application. This notice is extending the
period for soliciting comments, motions
to intervene, and competing
applications for an additional 30 days.
The proposed project would utilize
the existing 66-foot-high, 248-foot-long
concrete gravity dam and gated outlet
on the Yakima River, owned and
operated by the U.S. Bureau of
Reclamation, and will consist of the
PO 00000
Frm 00036
Fmt 4703
Sfmt 9990
following: (1) A new 20-foot-wide
concrete intake structure with trash
racks and intake gates; (2) a new 325foot-long, 72-inch-diameter steel
penstock from the intake structure to the
powerhouse; (3) a new 50-foot by 40foot reinforced concrete powerhouse
containing one Kaplan turbine with a
capacity of 1.2 megawatts; (4) a new
substation; (5) a new approximately
1,400-foot-long, 34.5–69 kilovolt
transmission line which will tie into an
undetermined interconnection; and
(6) appurtenant facilities. The estimated
annual generation of the Easton Dam
project would be 5.0 gigawatt-hours.
Applicant Contact: Ramya
Swaminthan, Qualified Hydro 25, LLC,
33 Commercial St., Gloucester, MA
01930; phone: (978) 283–2822.
FERC Contact: Ryan Hansen (202)
502–8074 or by e-mail at
ryan.hansen@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 30
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13850–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: April 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–8888 Filed 4–12–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\13APN1.SGM
13APN1
Agencies
[Federal Register Volume 76, Number 71 (Wednesday, April 13, 2011)]
[Notices]
[Page 20658]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-8888]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13850-000]
Qualified Hydro 25, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On September 30, 2010, Qualified Hydro 25, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Easton Diversion
Dam Hydroelectric Project (Easton Dam project) to be located on the
Yakima River near Easton in Kittitas County, Washington. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The Commission issued a notice on February 16, 2011, accepting the
application and soliciting comments, motions to intervene, and
competing applications within a 60-day period. On March 31, 2011, the
Kittitas Reclamation District filed a letter with the Commission
stating they were not notified of the preliminary permit application.
This notice is extending the period for soliciting comments, motions to
intervene, and competing applications for an additional 30 days.
The proposed project would utilize the existing 66-foot-high, 248-
foot-long concrete gravity dam and gated outlet on the Yakima River,
owned and operated by the U.S. Bureau of Reclamation, and will consist
of the following: (1) A new 20-foot-wide concrete intake structure with
trash racks and intake gates; (2) a new 325-foot-long, 72-inch-diameter
steel penstock from the intake structure to the powerhouse; (3) a new
50-foot by 40-foot reinforced concrete powerhouse containing one Kaplan
turbine with a capacity of 1.2 megawatts; (4) a new substation; (5) a
new approximately 1,400-foot-long, 34.5-69 kilovolt transmission line
which will tie into an undetermined interconnection; and (6)
appurtenant facilities. The estimated annual generation of the Easton
Dam project would be 5.0 gigawatt-hours.
Applicant Contact: Ramya Swaminthan, Qualified Hydro 25, LLC, 33
Commercial St., Gloucester, MA 01930; phone: (978) 283-2822.
FERC Contact: Ryan Hansen (202) 502-8074 or by e-mail at
ryan.hansen@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 30 Days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13850-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: April 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-8888 Filed 4-12-11; 8:45 am]